| 1 | Tubewell |
| 2 | Supplying, lowering of MS Pipe as per IS:4270-2001 including MS sockets having dimensions as per IS code duly welded with MS electrode to have extra strength to lower the pipe into tubewell bore. |
| 3 | ( c)) 200mm nominal diameter (weight 33.6 kg per metre) 6.4mm thickness |
| 4 | Supplying, Fixing & lowering of Stainless Steel Cage type wire wound screen as per IS:8110-2000 or latest ISI marked Duly welded with suitable grade S.S welding electrode.to lower the strainer into tubewell bore. |
| 5 | k) 200mm Steel Strainer (slot size 0.75mm) 6.30 mm thickness |
| 6 | Supplying, Fixing & lowering of Stainless Steel Socket as per IS:8110-2000 or latest ISI marked Duly welded with suitable grade S.S welding electrode.to lower the strainer into tubewell bore complete in all respect. |
| 7 | b) 200mm internal diameter |
| 8 | Supplying, lowering & fixing of M.S Special socket to connect S.S Strainer to M.S Pipe duly welded with suitable grade welding electrode complete in all respect. |
| 9 | ( c)) 200mm internal diameter |
| 10 | Supplying & fixing of M.S Clamp of size 150mm X 12mm made out of MS Flat 1.52m long, suitable to fit Housing pipe including the cost Nut & Bolts of Suitable size complete in all respect. |
| 11 | Supplying at site Wooden Box of suitable size with Lid & locking arrangment for preserving strata sample collected from the bore. |
| 12 | Supplying & Fixing of well cap having thread to fix on housing pipe complete in all respect. |
| 13 | ( c)) 200mm internal diameter |
| 14 | Development and Stabilizing of the tubewell with air compressor of required capacity as directed by the engineer-in- charge including cost of tools, appliances & consumable to the satisfaction of Engineer-in-charge. |
| 15 | (b)) Capacity of Air compressor 550 cfm at 600 PSI |
| 16 | Development and Stabilizing of the tubewell with submersible pump of required capacity as directed by the engineer-in- charge including cost of tools, appliances & consumable to the satisfaction of Engineer-in-charge. |
| 17 | Drilling of 500mm dia bore with Reverse Rotatry Rig in all kinds of soil including the cost of consumable stores, fuel oil and transportation of rig to the site. complete in all respect. |
| 18 | a) Drilling of 500mm dia bore with Reverse Rotatry Rig Upto 150 m depth BGL. |
| 19 | b) Drilling of 500mm dia bore with Reverse Rotatry Rig Beyond 150 m depth BGL up to 300 Mtr |
| 20 | Making electric Logging of borehole with electronic well logger including cost of equipment at site etc.complete in all respect |
| 21 | Supplying at site of gravel of 1/16\" to 1/8\" sizes including pouring and packing in the annular space between the pipes assembly and the bore.The gravel should be free from, dust,dirt, or the vegetable manner as per IS 4097/1967 with latest amendments (to be paid as per actual length of pipe) |
| 22 | Supplying and fixing mild steel centering guides made out of 32mm x 6mm thick M.S. bar complete in all respects. |
| 23 | Supplying and fixing of bail plug of M.S pipe complete with inverted U-hook attached to the bottom plug Complete in all respects. |
| 24 | Testing of water sample for Heavy metal from approved laboratory RAWTL SAS Nagar (Aluminium, selemium, cadmium, chromium, lead, mercury, arsenic, nickel, pesticide & uranium etc.) |
| 25 | Supplying of tibba sand /local sand over gravel packing & clayseal, upto G.Level between pipe assembly and bore including carriage . Complete job in all respect (upto 75 mt depth approx.) |
| 26 | Supplying and fixing sanitary seal having rubber tight on housing pipe . Complete job in all respect 200 mm dia (As per BIS:2800-2019) (As per IS:2800-2019) |
| 27 | Supplying of clay to provide imprevious layer in between pipe assembly and bore above gravel packing including carriage of material. Complete in all respect. |
| 28 | Provision for Sterilisation of tubewell with sodium hypochorlide/ chlorination of well as per IS code 2800: 2019 complete job. The well shall be disinfected or sterilized as per IS code 2800:2019 or latest, after the development by pump and before the final test. All wells regardless of the use should be sterilized on completion to prevent or retard the growth of corrosion or incrustation fostering organisms. This should be done by introducing chlorine into the water in the well and immediate aquifer surrounding the well .The volume of water in the screen and casing should be estimated and sufficient chlorine added to yield for water with chlorination of 1000 ppm. The solution should be poured into the well and thoroughly mixed in the well by surging with pump. The solution should remain in the well for at leaset 6 hours during which it should be surged at about 2 h interval. After expiration of contact time , the well should be pumped initially back into the well for abour 30 minute and late to waste until there is little of no odour or taste of chlorine in the discharged water . IT has been found that using hypochlorite is of 10% concentration, the requirement of hypochlorite is 10 litre for every cubic meter of water in the well to produce. |
| 29 | Rising main |
| 30 | Providing, Laying , fixing & jointing of P.V.C. Pipes as per ISI-4985 (ISI marked with the prior approval of Engineer-in-Charge) along the Trenches and laying the same in Trenches to correct alignment and gradients, cutting, jointing and testing complete as per specifications. |
| 31 | iv) 110mm o/d pipe of 10 Kgf. / sqcm |
| 32 | Providing & fixing C.I/D.I Flanged end, stem of SS (AIS 1410) and Bronze(gunmetal) working parts Sluice Valves ISI marked 14846-2000, including jointing , testing & cost of Nut ,Bolt & insertion sheet, all carriage complete (with the approval of Engineer in-charge). |
| 33 | A) Class PN-1 as per ISI |
| 34 | a) 80mm i/d Sluice Valves flanged |
| 35 | Providing, fixing and jointing Cast Iron surface box for Sluice valve, Air valve, Fire hydrant etc. including all carriages complete. |
| 36 | Construction of masonary Sluice Valve Chamber excluding Sluice valve cover as per standard design & drawings of public health department. |
| 37 | b) Size 0.9 m. x 0.9 m. |
| 38 | Distribution work |
| 39 | Providing, Laying , fixing & jointing of P.V.C. Pipes as per ISI-4985 (ISI marked with the prior approval of Engineer-in-Charge) along the Trenches and laying the same in Trenches to correct alignment and gradients, cutting, jointing and testing complete as per specifications. |
| 40 | xii) 63mm o/d pipe of 6 Kgf. / sqcm (manual excavation ) |
| 41 | xiii) 75mm o/d pipe of 6 Kgf. / sqcm ( Manual excavation) |
| 42 | xii) 63mm o/d pipe of 6 Kgf. / sqcm (mechanical excavation ) |
| 43 | xiii) 75mm o/d pipe of 6 Kgf. / sqcm (Mechanical excavation ) |
| 44 | xiv) 90mm o/d pipe of 6 Kgf. / sqcm (Mechanical excavation ) |
| 45 | xv) 110mm o/d pipe of 6 Kgf. / sqcm (Mechanical excavation ) |
| 46 | Providing & fixing C.I/D.I Flanged end, stem of SS (AIS 1410) and Bronze(gunmetal) working parts Sluice Valves ISI marked 14846-2000, including jointing , testing & cost of Nut ,Bolt & insertion sheet, all carriage complete (with the approval of Engineer in-charge). |
| 47 | A) Class PN-1 as per ISI |
| 48 | a) 80mm i/d Sluice Valves flanged |
| 49 | b) 100mm i/d Sluice Valves flanged |
| 50 | Providing, fixing and jointing Cast Iron surface box for Sluice valve, Air valve, Fire hydrant etc. including all carriages complete. |
| 51 | Construction of masonary Sluice Valve Chamber excluding Sluice valve cover as per standard design & drawings of public health department. |
| 52 | a) Size 0.6 m. x 0.6 m. |
| 53 | Providing and laying, jointing, fixing, testing ISI Marked G.I. Pipe (as per IS 1239) B- Class, including cost of Specials such as tees, bends, sockets elbow etc., cutting, threading and testing in trenches in the ground complete. |
| 54 | b) 20mm i/d |
| 55 | Dismantling of cement concrete 80mm thick cement concrete 1:2:4 over 100mm thick C.C. 1:8:16 and making good the same to its original condition complete in all respects |
| 56 | Dismantling of mettalic road with bitumainous course 50mm to 75 mm thick . (Without restoration) complete in all respects. |
| 57 | Taking out existing CC interlocking paver blocks from footpath/ central verge/pavement, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in- Charge and refixing of Interlocking Tile 80 mm thick factory made cement concrete interlocking Paving blocks of M- 40 grade manufactured by block making machine equipped with steel mould clamped to a strong vibratory table with hydraulic pressure for compaction of concrete as per IRC SP 63 -2014 and of approved size and design / shape laid in Ordinary Grey Colour and pattern over and including 40 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. Complete as per directions of engineer-in- Charge. ( refer. Anaylsis) |
| 58 | Making Connection with existing distribution pipe line with proposed upvc distribution pipe line of various diameter i.e. 63, 90, 110 & 160mm i/d.Complete job with clamps, sockets etc. |
| 59 | OHSR work |
| 60 | Constructing one No. of 25 KL (25000 litres) Capacity with staging height not less than 15.50 m and FSL 17.20 m Complete with external R.C.C. stair case with landing slabs, R.C.C. roof, ventilator, automatic water level indicator, single manhole cover, lightening conductor, water proofing/ water tightness of storage container etc. complete as described, duly tested and handed over in proper working order to the DWSS. The lump-sum rate quoted for this component shall include the cost for providing and installing inlet, outlet, scour and over flow, double flanged DI pipes as per (IS 8329-2000 with latest amendments), including cost of CI/Ductile Iron (DI) D/ F Expansion joint, Bell mouth D/F puddle collars as per DWSS standards, Ductile Iron Duck foot bends conforming to IS-9523 with latest amendments andC.I./Ductile Iron D./ F sluice valves duly ISI marked (IS-14846-2000 or latest) one each with inlet, out let and scour pipes, and painting of all components shall be included in cost complete in all respects to the entire satisfaction of the Engineer in Charge.The lump sum price of the OHSR shall also include the cost for jointing material including cost of nuts and bolts (ISI marked) rubber sheet, MS clamp made out of 50mm x 6mm flat in two halves, each set fixed with at least 5 Nos. Nuts and Bolts with each pipe complete as per Drawing including any material required. |
| 61 | Household connections |
| 62 | Providing household connection, laying, jointing, fixing, testing MDPE pipe (as approved by Engineer in charge), including cost of excavation, refilling, the trench, CI bib cock as per IS : 210 with stainless steel spindle, 15 mm o/d MDPE pipe 2.00 meter (length on average basis) 15mm o/d GI pipe 2.50 mtr, 3” i/d uPVC clamp, GM ferrule ISI marked, connection of 15 mm i/d ferrule medium, specials such as tees, bends, sockets, elbows, nipples (100mm & 150 mm), union couplings, GI hooks etc. and gun metal peet valve (heavy pattern) with hand wheels on MDPE/GI pipe line laid in the ground or inside the buildings, cutting, threading, making holes in wall and testing in trenches in the ground. All material should be approved make (to be approved of Engineer in charge). Complete job in all respect including cost of carriage. |
| 63 | Providing, fixing & jointing water meter in GI pipe line including cutting and threading pipe and making long screw etc. complete including cost of MDPE/G.I. Jam nut Providing, fixing and jointing gun-metal peet valves (Heavy Pattern) with hand wheels, on GI /MDPE Pipe lines laid in the ground or inside buildings including all carriages complete.15mm i/d Gun Metal peet valve heavy pattern. complete. (15mm) Supply of Nipple 15mmx150mm ,15 mm x 100 mm elbows unions , GI HOOKS etc.Complete job |
| 64 | Provision of washer in existing and proposed water connections . |
| 65 | Provision of 80 MM dia bulk meter as per standard design and specifications . Complete job |
| 66 | Provision of water connection on replacment of existing pipeline |
| 67 | Development works |
| 68 | Providing & fixing G.I. Barbed wire 3 ply fencing around the head works site in three rows complete in all respects including cost of winding wire & aluminum painting complete in all respects as per standard Drawing and drawing of DWSS |
| 69 | Providing & fixing angle iron pickets with angle 40mm x40mm x 6mm including cost of concrete block & painting complete in all respects as per standard Drawing and design of DWSS. |
| 70 | Providing & fixing D.Hook complete with MS Bolts size 300mm x 18mm as per standard Drawing and design of DWSS |
| 71 | Construction of brick masonry corner pillar including cost of cement pointing including cost of material complete in all respects as per standard Drawing and design of DWSS |
| 72 | Construction of masonry gate pillar including cost of MS Steel Gate size 1.22mtr x 1.37 mtr as per standard Drawing and design of DWSS . Complete in all respects |
| 73 | Construction of Cement Concrete, Foot Path with masonry toe wall & earth filling inside water works as per standard Drawing and design of DWSS |
| 74 | Providing & fixing MS Sign Board as per standard size, drawing and design of DWSS |
| 75 | Construction of brick masonry toe wall in 1:5 cement sand mortar with depth 0.45 mtr ,C.C. 1:8:16 & 12.5 mm thick cement plaster in 1:4 on both sides and top of toe wall complete in all respects.around the water works site (excluding corner/gate pillars) |
| 76 | Disinfection work |
| 77 | Providing, Installing, testing & commissioning one No. Electronically actuated, Diaphragm Operated, Metering System, Chemical Dosing Chlorinator, suitable for delivering 0.5 to 6 Litres of Bleaching Powder solution/ Sodium Hypo solution per hour under maximum delivery pressure upto 7 Kg.cm2, and suction lift not less than 1.5 m, as per DWSS standard specifications. |
| 78 | Pumping Machinery |
| 79 | Providing, installing, testing and commissioning of 1 no. Electrically driven pumping set of reputed make , capable of delivering 144 lpm against a head of 126 mtr . Complete in all respects |
| 80 | Supplying lowering of 65 mm dia GI pipe as per IS 1229 including GI sockets . Complete in all respects |
| 81 | Providing and fixing of submerssible of 2.5mm ² core cable , complete in all respect |
| 82 | Providing installing, testing and commissioning of 1 no. control panel with closed transition star delta with enclosure consisting of electrical appliances such as contactor, furses, MCCB‘s over load relays , isolator switches wiring and connnections. Complete in all respect . |
| 83 | Providing and installing 80 mm dia delivery main (From Tube well to Duck Foot bend including cost of C.I/D.F Pipes, D/F Sluice valves, D/F NRV & Specials as C.I Bends, Tail Piece Tees etc.. inside the pump chamber as per standard design |
| 84 | Environmental Details |
| 85 | Grassing of grounds with doob grass including uprooting rank vegetation and weeds by digging the area to a depth of 15 cm, removing all weeds and other growth with roots by forking repeatedly, breaking clods, mixing fertilizer, rough dressing and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts, planting grass roots in rows 10 cm apart in both directions, watering, weeding and maintenance till turf is formed |
| 86 | Supplying and planting permanent trees in prepared pits and watering |
| 87 | Supplying and planting permanent shrubs in prepared pits and watering. |
| 88 | Planting hedge including digging of trench 60 cm wide to 15 cm depth and mixing FYM, fertilizer and insecticides, planting of sapling at 30cm distance from plant to plant in two rows. |
| 89 | Carriage of Material |
| 90 | Extra for Carriage of Fine & Course aggregate i.e. Sand & Bajri from query to water works site beyond 5 km (Qty as worked out for the components to be constructed. (45-5=40 km.) |
| 91 | Extra for Carriage of Fine & Course aggregate i.e. Sand & Bajri from query to water works site beyond 5 km (Qty as worked out for the components to be constructed. (45-5=40 km.) |
| 92 | Pump Chamber size 3.05 m x 3.70 |
| 93 | Construction of Pump Chamber size 3.05 m x 3.70 m including cost of gravel pit & electric wiring complete in all respect Analysis and drawings |