Annual Rate Contract For Repairing Of Various Size And Make Pipe Line Under Sub Dn Siwana;  1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe lineup to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)- In all type Soil AC/PVC/HDPE pipe- 50/63/75mm  2 80/90mm  3 100/110mm  4 125/140mm  5 150/160/180mm  6 200/225mm  7 250/280mm  8 300/315mm  9 350mm  10 400mm  11 450mm  12 500mm  13 Add on above item no. 1 for B.T. Road 5% 50/63/75mm  14 80/90mm  15 100/110mm  16 125/140mm  17 150/160/180mm  18 200/225mm  19 250/280mm  20 300/315mm  21 350mm  22 400mm  23 450mm  24 500mm  25 Add on above item no. 1 for C.C. Road 20% 50/63/75mm  26 80/90mm  27 100/110mm  28 125/140mm  29 150/160/180mm  30 200/225mm  31 250/280mm  32 300/315mm  33 350mm  34 400mm  35 450mm  36 500mm  37 Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) - In all type Soil- 80mm  38 100mm  39 125mm  40 150mm  41 200mm  42 250mm  43 300mm  44 350mm  45 400mm  46 450mm  47 500mm  48 Add on above item no. 4 for B.T. Road 5% 80mm  49 100mm  50 125mm  51 150mm  52 200mm  53 250mm  54 300mm  55 350mm  56 400mm  57 Add on above item no. 4 for C.C. Road 10% 80mm  58 100mm  59 125mm  60 150mm  61 200mm  62 250mm  63 300mm  64 350mm  65 400mm  66 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost)- In all type Soil- 50/63/75mm  67 80/90mm  68 100/110mm  69 125/140mm  70 150/160/180mm  71 200/225mm  72 250/280mm  73 300/315mm  74 350mm  75 400mm  76 450mm  77 500mm  78 Add on above item no. 7 for B.T. Road 5% 50/63/75mm  79 80/90mm  80 100/110mm  81 125/140mm  82 150/160/180mm  83 200/225mm  84 250/280mm  85 300/315mm  86 350mm  87 400mm  88 Add on above item no. 7 for C.C. Road 20% 50/63/75mm  89 80/90mm  90 100/110mm  91 125/140mm  92 150/160/180mm  93 200/225mm  94 250/280mm  95 300/315mm  96 350mm  97 400mm  98 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)- In all type Soil- 80 mm  99 100 mm  100 125 mm  101 150 mm  102 200 mm  103 250 mm  104 300 mm  105 350 mm  106 400 mm  107 450 mm  108 500 mm  109 Add on above item no. 10 for B.T. Road 5% 80mm  110 100mm  111 125mm  112 150mm  113 200mm  114 250mm  115 300mm  116 350mm  117 400mm  118 Add on above item no. 10 for C.C. Road 5% 80mm  119 100mm  120 125mm  121 150mm  122 200mm  123 250mm  124 300mm  125 350mm  126 400mm  127 Removal of Choking from pipe line, including tree roots, malba, sand and otherby manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.- In all type Soil -75mm  128 90/80 mm  129 110/100 mm  130 140/125 mm  131 180/160/150 mm  132 225/200 mm  133 250 mm  134 300 mm  135 Add on above item no. 12 for B.T. Road 5% 75mm  136 90/80 mm  137 110/100 mm  138 140/125 mm  139 180/160/150 mm  140 225/200 mm  141 250 mm  142 300 mm  143 Add on above item no. 12 for C.C. Road 5% 75mm  144 90/80 mm  145 110/100 mm  146 140/125 mm  147 180/160/150 mm  148 225/200 mm  149 250 mm  150 300 mm  151 Removal of Choking from pipe line, including tree roots, malba, sand and otherby manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.- In all type Soil- 80mm  152 100 mm  153 125 mm  154 150 mm  155 225/200 mm  156 250 mm  157 300 mm  158 Add on above item no. 15 for B.T. Road 5% 80mm  159 100 mm  160 125 mm  161 150 mm  162 225/200 mm  163 250 mm  164 300 mm  165 Add on above item no. 15 for B.T. Road 5% 80mm  166 100 mm  167 125 mm  168 150 mm  169 225/200 mm  170 250 mm  171 300 mm  172 Add on above item no. 1.6.1 if depth of pipe line is above 1.5 mtr upto 3.0 Mtr  173 100 mm  174 125 mm  175 150 mm  176 225/200 mm  177 250 mm  178 300 mm  179 Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it & upto ground level for entire job contractor will use his own T&P & labour.  180 Add on above item no. 18 for B.T. Road 5%  181 Add on above item no. 18 for CC Road 10%  182 Removal of sluice valve in existing pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost) In all type Soil - 80 mm dia pipe to 100mm  183 125 mm dia pipe to 150mm  184 200 mm dia pipe to 250mm  185 300 mm dia pipe to 350mm  186 400 mm dia pipe  187 450 mm dia pipe  188 500 mm dia pipe  189 Add on above item no. 21 for B.T. Road 80mm dia pipe to 100mm  190 125 mm dia pipe to 150mm  191 200 mm dia pipe to 250mm  192 300 mm dia pipe to 350mm  193 Add on above item no. 21 for C.C. Road 80mm dia pipe to 100mm  194 125 mm dia pipe to 150mm  195 200 mm dia pipe to 250mm  196 300 mm dia pipe to 350mm  197 Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). In all type Soil- 80 mm to 110 mm  198 125 mm to 165 mm  199 200 mm to 300 mm  200 Add on above item no. 24 for B.T. Road 5% 80mm to 110mm  201 125 mm to 165 mm  202 200 mm to 300 mm  203 Add on above item no. 24 for C.C. Road 5% 80mm to 110mm  204 125 mm to 165 mm  205 200 mm to 300 mm  206 Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).- In all type Soil- 80 mm to 100 mm  207 125 mm to 150 mm  208 200 mm to 300 mm  209 350 mm to 450 mm  210 Add on above item no.27 for B.T. Road 5% 80mm to 100mm  211 125 mm to 150 mm  212 200 mm to 300 mm  213 350 mm to 450 mm  214 Add on above item no.27 for C.C. Road 5% 80mm to 100mm  215 125 mm to 150 mm  216 200 mm to 300 mm  217 350 mm to 450 mm  218 Labour charges for removal of complaint of polluted water supply to the consumers - Survey of the locality of polluted water supply for preliminary assessment of source of pollution during supply hours  219 Labour charges for digging of pit of suitable size for removal of water pollutiononexisting distribution AC/PVC/uPVC/HDPE pipe linesup to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line byfixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size - In all type Soil- 50 to 75 mm  220 80-110 mm  221 125 to 165 mm  222 200 to 300 mm  223 350 to 400 mm  224 Add on above item no.31 for B.T. Road 5% 50 to 75mm  225 80-110 mm  226 125 to 165 mm  227 200 to 300 mm  228 350 to 400 mm  229 Add on above item no.31 for C.C. Road 10% 50 to 75mm  230 80-110 mm  231 125 to 165 mm  232 200 to 300 mm  233 350 to 400 mm  234 Labour charges for digging of pit of suitable size for removal of water pollution onexisting distribution CI/DI/MS pipe linesup to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault pipe line byfixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size - In all type Soil- 80-100 mm  235 125 to 150 mm  236 200 to 300 mm  237 350 to 450 mm  238 Add on above item 33 for B.T. Road 5% 80-100mm  239 125 to 150 mm  240 200 to 300 mm  241 350 to 450 mm  242 Add on above item 33 for C.C. Road 5% 80-100mm  243 125 to 150 mm  244 200 to 300 mm  245 350 to 450 mm  246 Restoration of bitumen road by patch work of WBM using crushed / broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material , cleaning of surface of WBM and providing of seal &tack coat as per site condition by using ready cold mixup to the satisfaction of engineer in charge.The rate includes the makingof pit in regular shape, all labour, material and T&P charge complete job.  247 Restoration of cement concreteroad including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compactingcement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction ofengineer incharge.The rate includes the makingof pit in regular shape, all labour, material and T&P charge complete job.  248 Filling with locally available river sand at all levels including watering ramming consolidating and dressing complete including cost of sand. RUIDP 2017  249 Welding on M.S. / G.I./CI Pipes and other material by Electric Welding, this includes all the material like welding rods/ equipment like welding machine/ generater, if required for job. On site