|
| 1 | Service of EOT Crane 3/5 Ton (on every 3 month) :–It includes general checking of complete crane with the wheel condition, connection of motors, condition of motor, tightening of Nut and bolt , with rope of the adjustment of limit switch, step down transformer in panel board, terminal blocks, MCB\"s , HRC Fuse, HRC Kitkat Fuse set and Braking system, Push buttons, tightening of all electrical terminations, Top up of gear oil in gear boxes etc. With oiling and greasing of all moving parts, tightening of all equipments nut and bolts etc.(5 No. Crane X on every 3 months) |
| 2 | Visit charge Per Complain of Service Engineers at the time of Break Down of Machinery/Crane |
| 3 | Replacement of Power Contactor 18-25 Amp. |
| 4 | Replacement of Air Break Contactor 32-40 Amp. |
| 5 | Replacement ofStep Down Transformer |
| 6 | Replacement of M.C.B (40-63) Amp. |
| 7 | Replacement of Limit Switch for L.T And C.T |
| 8 | Replacement of Limit Switch for Hoist |
| 9 | Replacement of P.V.C Trolley |
| 10 | Replacement of L.T Gear Wheel Crane |
| 11 | Repairing of C.T Gear Box |
| 12 | Replacement of Relay (10-12) Amp. |
| 13 | Replacement of Break of the hoist/L.T/C.T |
| 14 | Replacement of C.T Wheel (Hoist) bearing. |
| 15 | Replacement of Remote 8 Way Switch |
| 16 | Replacement of Cable for Remote Switch 10 Core |
| 17 | Replacement of push up button of remote of crane |
| 18 | Replacement of DSL Bus Bar Set of Three |
| 19 | Replacement of Current Collector |
| 20 | Replacement of Brake Part (Hoist/C.T/L.T) |
| 21 | Replacement of Power Cable |
| 22 | Electric Oven :– Replacement of Burnt U Type Heater Different Capacity. ( 2000 watt aprox) |
| 23 | Replacement ofElectric Wiring with 4mm Glass Sleeves of Oven. |
| 24 | Replacement of MCB 10-32 Amp. ISI Mark. |
| 25 | Replacement of Signal Phase Preventer (VSP2) |
| 26 | Replacement of Thermostat |
| 27 | Replacement of Temprature Controller |
| 28 | Replacement of Oven Blower |
| 29 | Replacement of Indicator |
| 30 | Replacement of V-Pully |
| 31 | Replacement of V-Belt |
| 32 | H.T Winding Machine :– Tensioning Arrangement of H.T Winding Machine |
| 33 | Replacement of Shaft(Oven/H.T/L.T Machine) |
| 34 | Replacement of Turn Counter Meter. |
| 35 | Replacement of Reversible Switch |
| 36 | Overhauling of H.T Winding Machine |
| 37 | Replacement of Different Size Bearing |
| 38 | Replacement of Gear 5 DP |
| 39 | Replacement of Gear oil |
| 40 | Overhauling of L.T Winding Machine |
| 41 | Replacement of Foot Switch of 16 Amp. |
| 42 | Welding Machine :– Rewinding of Coil of Welding Machine |
| 43 | Replacement of Flexible copper Cable size 2.5 sqmm x 3 core |
| 44 | Replacement of Welding rod Holder |
| 45 | Hydraulic Trolley :– Repairing of Jack system , replacement of Packing seal ect.,Hydraulic oil |
| 46 | Replacement of Bearing of Different Size |
| 47 | Replacement of Wheel Pin |
| 48 | Replacement of Moving Wheelof busbar of Crane. |
| 49 | Electric Motor Rewinding :–1.5 H.P |
| 50 | 2 H.P |
| 51 | 3 H.P |
| 52 | 5 H.P |
| 53 | 7.5 H.P |
| 54 | Testing Equipment :- Coupling of DVDF |
| 55 | Replacement of dimmer stat coil per Phase |
| 56 | Replacement of voltmeter/Ammeter |
| 57 | Rewinding of Auto transformer in Power Analyzer |
| 58 | Repairing of hydra Pump |
| 59 | Wiring of Control Pannel Oven/Crane |