| 1 | Ceiling / Wall - Final Polymer Enriched Antifungal Water-based Polyurethane Coating(Water Plant) |
| 2 | Scrapping of old paint wherever required, Proper surface preparation, application of 2 coats of polymer putty, followed by proper sanding to achieve a smooth surface,application of Water based Epoxy Primer and finished with 2coats of Anti-fungal Water-based PU coating in desired shade. |
| 3 | Ceiling / Wall / Partition - Overcoating with Polymer Enriched Anti-fungal Water-based Polyurethane Coating |
| 4 | Proper surface preparation,leveling of joints with Epoxy putty, application of Epoxy Primer and finished with 2 coats of Anti-fungal Water-based PU coating. |
| 5 | 1mm self leveling Epoxy Flooring |
| 6 | Proper surface preparation, application of Epoxy primer and finished with 1mm Self Leveling Epoxy Flooring |
| 7 | 3mm Self leveling Epoxy Flooring (Washing Area with Degrated Surface) |
| 8 | Proper surface preparation, application of Epoxy primer, laying 2mm self leveling Epoxy Screed finished with 1mm Self Leveling Epoxy Flooring on top. |
| 9 | Construction of Epoxy Covings75mm X 75mm |
| 10 | Construction of Epoxy Covings25mm X 25mm |
| 11 | Repairing & Epoxy Putty Layering on Epoxy Covings |
| 12 | High Abrasion PU Coating on Epoxy Covings |
| 13 | 6mm High Density PU Flooring in Washing Area for 90O C (Area with Steam) |
| 14 | Proper surface preparation, application of Epoxy Primer finished with 6mm High Density PU Flooring in desired shade. |
| 15 | 30mm Manual Screed with Proper Gardient (Water System) |
| 16 | Proper surface preparation, application of Epoxy Primer and creating a proper gradient with Epoxy Morter having upto 30mm average thickness towards the drain(this is just base screed and 3mm Self leveling epoxy flooring required over this for leveled finised). |
| 17 | Commercial Terms & Conditions as applicable |
| 18 | Total Basic price |
| 19 | GST Tax |
| 20 | Other Charges (If any, please mentioned) |
| 21 | 1) |
| 22 | 2) |
| 23 | 3) |
| 24 | Total Price Rs.(Including All above) |
| 25 | Total Price Rs. In Words :- |
| 26 | Imp . Note :- 1. The vendor must visit the site prior to submitting their bid to fully understand the scope of work and the materials to be delivered. 2. The vendor shall quote each item separately in the bid. 3. Payment shall be released based on actual site measurements, subject to satisfactory completion of the work at the site / OPV Department 4. All work and Qulity of product shall be as per latest WHO c GMP guidline and norms specifically for vaccine and Bio-Pharmaceutical Industry. |
| 27 | 3. For Sr. No. 1, 2, 3, 4, 9 & 10 units are mentioned in Sq.Ft. and for Sr. No. 5,6,7 & 8 units are mentioned in Running Feet (Rft) |
| 28 | 4. Unit rate and price should be quoted in Indian Rupees only. When there is discrepancy between the rate in figures and words , the rates in words will be considered final. |
| 29 | (Please Mention Name of Bidder) |