supply of Probable Items With Approximate Quantities For The Smart School At Baradighi High School, Under Mal Development Block, District Japaiguri.- 1 (Page No. 66 ,Item No. 36 (I) (A) of PWD Building Schedule (2017) (3rd Corrigendum)Supplying and laying true to line and level vitrified tiles of approved brand (size not less than 600 mm X 600 mm X 10 mm thick) in floor, skirting etc. set in 20 mm sand cement mortar (1:4) and 2 mm thick cement slurry back side of tiles using cement @ 2.91Kg./sqM or using polymerised adhesive(6 mm thick layer applied directly over finished artificial stone floor/Mosaic etc without any backing course) laid after application slurry using 1.75 Kg of cement per sqM below mortar only, joints grouted with admixture of white cement and colouring pigment to match with colour of tiles / epoxygrout materials of approved make as directed and removal of wax coating of top surface of tiles with warm water and polishing the tiles using soft and dry cloth upto mirror finish complete including the cost of materials, labour and all other incidental charges complete true to the manufacturersspecification and direction of Engineer-in-Charge. (White cement, synthetic adhesive and grout material to be supplied by the contrr]e)(I) With application slurry @1.75 kg/ Sq.m, 20 mm sandcement mortar (1:4) & 2 mm thick cement slurry at back sideof tiles, 0.2 kg/ Sq.m white cement for joint filling withpigment.B) Light ColourIN GROUND FLOOR 2 (Page No. 189, Item No. II(b),of PWD Building Schedule (2017) (3rd Corrigendum)Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (ii) With 1:4 cement mortar (b) 15 mm thick plasterIN GROUND FLOOR 3 (Page No. 198 ,Item No. 5of PWD Building Schedule (2017)Rendering the Surface of walls and ceiling with White Cement base WATER PROOF wall putty of approved make & brand.(1.5 mm thick)IN GROUND FLOOR 4 (Page No. 195 ,Item No. 7of PWD Building Schedule (2017)Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparing the surface throughly, complete as per manufacturers specification and as per direction of the EIC. (In Ground Floor)(b) Two Coatsii) Solvent based interior grade Acrylic Primer 5 (Page No. 197 ,Item No. 17(c) (i) of PWD Building Schedule (2017)Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturers specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer.In Ground floor (Two Coat)c) Super Protective 100% Acrylic Emulsion 6 (Page No. 104 ,Item No. 13 (a) (ii) of PWD Building Schedule (2017)(a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor.(i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr. IN GROUND FLOOR 7 (Page No. 114 ,Item No. 1 (d) of PWD Building Schedule (2017)Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be correted upto three decimals).(d) Sal : LocalIN GROUND FLOOR 8 (Page No. 198 ,Item No. 5of PWD Building Schedule (2017)Panel shutters of door and window, as per design (each panel consisting of singleplank without joint), including fitting and fixing the same in position butexcluding the cost of hinge and other fittings.In ground floor.(iii) 35mm thick shutters with 19mm thick panel of size 30 to 45 cm.(a) Ordinary Teak WoodIN GROUND FLOOR 9 (Item No. 1(b), Page No. 200 of PWD Building Schedule (2017)Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.IN GROUND FLOOR 10 ( Page No. 200 ,Item No. 1(a) of PWD Building Schedule (2017)(a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.IN GROUND FLOOR 11 (Page No. 200,Item No. 2(A)IV,of PWD Building Schedule (2017)Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(a) On timber or plastered surface :(iv) Two coats (with any shade except white)IN GROUND FLOOR 12 (Page No. 201 Item No. 3B(b) of PWD Building Schedule (2017)Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (b) On steel or other metal surface :(iv) Two coats (with any shade except white)IN GROUND FLOOR 13 (Page No. 235 No. 1 (II)(A)(l) of PWD Building Schedule (2017)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized (with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding & casement windows, partitions, formed of basic sections of any ISI embossed / certified make and brand as per direction of Engineer - InCharge. (Payment will be made on finished length of the work).I) Natural whitea) 2- track sliding window 14 ii) Top frameSide frame 15 (Page No. 235 No. 1(A)(II)(d)of PWD Building Schedule (2017)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized (with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding & casement windows, partitions, formed of basic sections of any ISIembossed / certified make and brand as per direction of Engineer - InCharge. (Payment will be made on finished length of the work).d) Shutter for all track sliding windowI) Natural whitei) Bottom & Top member 16 ii) Style side member 17 iii) Interlock member. 18 (Page No. 243 No. 9 (of PWD Building Schedule (2017)Supplying bubble free float glass of approved make and brandconforming to IS: 2835-1987.v) 6mm thick clear glass 19 (Page No. 242,Item No. 8 (i)(a) of PWD Building Schedule (2017)Supplying EPDM gusket of approved make and brand as per direction ofEngineer in charge.i) For sliding windows a) T shaped EPDM gasket for frames. 20 (Page No. 239 , Item No. 2,of PWD Building Schedule (2017)Labour charge for fabrication and installation of composite door, window, partitions made from annodized extruded alloy aluminium sections for the following units:-i ) 2 track sliding window. 21 (Page No. 242,Item No. 7of PWD Building Schedule (2017)Supplying maruti lock (100mm) 22 Suplying and Installation of Alloy Steel Study Chair With Cushion & Writing Pad Dimension 20D x 10W x 10Hcentimeter (Payment will made as per quotation) 23 Supply Fitting Fixing CC TV 8 Chennel (Payment will made as per quotation) 24 Monitor Set (Payment will made as per quotation) 25 Broadband installation (Payment will made as per quotation) 26 Add Electrification work 27 Add:- GST @ 18% 28 Add:- Cess @ 1%