|
| 1 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed. III) 15 cm av. diameterNote: Diameter of pile to be measured at a distance of 1.5m from the thicker end. |
| 2 | Labour for driving Sal-bullah / Eucalyptus bullah piles by monkey in sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.1) Payment to be made on the length driven into the ground. Diameter to be measured at 1.5m. from the thicker end. 3) For driving done by pile engine set (without satging ) under specific instruction of Engineer incharge, the rate will be enhanced by Rs. 4.00 per meter. iii) 15 cm av. diameter |
| 3 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site. (a) Width of thinner end above 10 cm. and less than 15 cm.(i) Jhaw / Eucalyptus |
| 4 | Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete. |
| 5 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.NB:- Volume of each earth/ sand filled bags should not be less than 0.028 m3.Size of Nylon crate is 1metre X 1metre X 1metre. (a) Where boats are not necessary. |
| 6 | Supplying at site High Density Polyethylene (HDPE) bag of size 0.84 m x 0.38 m conforming to BIS : 14252 : 2015 for bank protective works including all cost of cost of transportation on road by all eans,including other incidental charges complete.Note: Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally. Paragraphs 2.8 including the sub-paragraphs, i.e. 2.8.1 and 2.8.2 under the Chapter of “Specification for Works” in the USoR shall be reproduced and included in the tender document as “Specification and Special Terms & Conditions for High Density Polyethylene (HDPE) Bags” in case of use of this item in the estimate.”(Department supply) |
| 7 | Labour charges for filling HDPE bags with filler materials (earth/sand),machine stitching the open end of the bag with thread as per design and placing the same on slope or dumping from bank within initial lead of 30m and all lifts including carriage and hire charges of all materials and equipments but excluding the cost of filler materials as directed by Engineer-in-Charge (Volume of earth/sand filled bag should not be less than 0.0328 cum). |
| 8 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing reaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading,transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking.E) Beyond 4.00 km and upto 5.00 kmNote of Royalty: This rate is includes compensation for earth for land owned/arranged by the contractor @ Rs 25.00 per cum and royalty charges on earth @ Rs 29.00 per cum and cesses charges @ Rs. 5.30 per cum.. The royalty and cess will be paid to the agency on production of necessary documents in support of payment made towards the royalty and cess. |
| 9 | Supplying, spreading and compacting sand to required thickness in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compcation, including lighting, guarding, barricading and making adequate earthen budh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. |
| 10 | Plain / Reinforced Cement Concrete in Substructure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality, cement and water reducing admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cost ofnecessary form work and staging complete as per drawing and technical specificationsE) RCC Grade M25 (i) Height upto 5m |
| 11 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns,lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)(c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work. |
| 12 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. |
| 13 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.a) In ground floor including roof. |