| 1 | Provision for Geo Physical Survey charges for identifying the bore point etc., complete. |
| 2 | Drilling150 mmDiaBorewellinallurialsoilorsegmentarystarateusingnotbyrigby firstdrillingapilotboreof115 mmdiadirectrotarymudcirculationmethod,usingcontractorsrigtoolsfuel labourfordrilling,bentoniteLabourdrillingatthesiteshownbythedepartment officers. |
| 3 | Supply, Delivery and Fixing of 180mm Dia PVC casing Pipe for in position including cost of all materials and labour charges etc., complete. |
| 4 | Earth Work Excavation for foundation in all types of soils and sub soils to full depth (such as Soils in Rock / Silt / Light Black Cotton Soil / Ordinary Soil ) except in rock requiring blasting but inclusive of shoring, shuttering and bailing out water wherever necessary and refilling the sides of foundation with excavated earth other than sand in layers of 150 mm thick well rammed and consolidated, depositing the surplus earth in places shown by the Departmental Officers with initial lead of 10 m and initial lift of 2 m. Complete as per TNSS23 & 24, V, VI (S2), VII, 9,10 |
| 5 | Plain Cement Concrete of mix 1 : 4 : 8 (One Cement four sand eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including formwork and centering labour charges, transporting and placing in position including shoring, strutting, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. |
| 6 | Random Rubble Masonary in Cement Mortor 1:5 Mix (one cement, five sand)usingoldbest rough and bond stones from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. laying and curing etc. complete. Complying with std.Specifications. |
| 7 | BrickworkinCementMortor1 : 5(One Cement and five Sand)usingbest quality of countrybricksof size 83/4\"x41/4x23/4 includingall costof materialsand Labour Charges including Curing charges etc., Complete as per standard specification. |
| 8 | PlasteringinC.M. 1 : 5(onecement fivesand)to12 mmthickincludingallcostandconveyanceofallmaterials tositeincludingcostofcementwhichwillbepurcharedlocallybythecontractor and conveyanceofthesametotheactualworksiteandcostformworkincludingwatering curingandallleadsofgoodpotablewaterandallother. |
| 9 | Supplying and Painting thewalls with TwoCoatsWeather sealedExterior emulsion Paint as instructed by the departmrntal officers includingPreparation of surface curing, etc complete in all floorscomplying with standard specification. ( The Colour and shade of the paint shall be got approved by the departmental officers.) |
| 10 | Supply and Delivery ofFollowing PVCand G.I. Medium Class pipes and Specials as per ISI Specifications for Pumpset errection including Cutting and Threading of G.I. pipe, MS push for plunger rod, Interconnection work etcComplete for Borewell only. |
| 11 | Submersible Pumpset 2 HP |
| 12 | Panel Board |
| 13 | 4 Sqmm Copper Cable |
| 14 | 40mm UPVC Pipe |
| 15 | 40mm UPVC Adopter |
| 16 | 32mm GI Pipe \"B\" Class |
| 17 | 32mm GI Elbow |
| 18 | 32mm GI Coupling |
| 19 | 32mm GI Non Return Valve |
| 20 | 32mm GM Gate Value |
| 21 | 32mm GI Union |
| 22 | 20mm GI Tape |
| 23 | 20mm GI Pipe \"B\" Class |
| 24 | HDPE Tank 2000 Lit |
| 25 | Bore Cover |
| 26 | Bore Clampset |
| 27 | 40mm PVC Pipe |
| 28 | 16 Amps Main Switch |
| 29 | 7/20 Wire |
| 30 | Earthwork Excavation and Depositing on Bank with initial lead and lift of soil, such as hard red earth, stiff clay, black cotton soil,including Refilling charges as SS 20 B including all labour charges etc. as per standard specification. |
| 31 | LoweringPVC rigid/ HDPE pipes and specials to trench and laying to proper grade and alignment jointing with PVC couplers with cement paste and testing to the required pressure including conveyance of water for filling during testing. |
| 32 | Supply and Fixing of 50mm thick Precast Slab including cost and conveyance of all materials and all labor charges etc, |
| 33 | Labour Charges forErection of Submersible pumpset and errection ofPanel Board in Position etc,CompleteComplyingwithStandardSpecifications. |
| 34 | Supply and Fixing of TNEB meter Board suitable for 32A Single Phase Service connection with 32A Fuse unit (500V) 32A neutral link and earth link (1\" x 1/8\" Copper Flat) on TW Plank of Size 375mm x 300mm x 19mm with Supporting TW Reepers of 1\" thick an either side with Painting with Suitable bolt and nuts for fixing the TW Plank on wall with earth connection and inter connection with 7/20 PVC insulated copper wire from EB Meter to Fuse Unit (SD No :125) |
| 35 | Supply and Fixing of Panel Board Cover including cost and conveyance of all materials and all labor charges etc, |