|
| 1 | To carryout complete water wash |
| 2 | To carryout four wheel grease packingand inner outer oil seal change |
| 3 | Grease 2 Kg |
| 4 | Axle Packing 2 no\"s |
| 5 | To replace brake lining front & rear |
| 6 | To servicefour wheel racher |
| 7 | To recamber spring plate assembly |
| 8 | Front rear centre bolt 4 no\"s |
| 9 | To replace spring plate bush change 8 no |
| 10 | To service radiator |
| 11 | To carryout clutch plate cover asssembly RC, release bearing & pilot bearing |
| 12 | To service air drier |
| 13 | To service E 2 Valve |
| 14 | To replace Tierod end ball joint kit change |
| 15 | To replace pull push rod end assembly change |
| 16 | To replace UJ cross 2 no\"s change |
| 17 | To repalce centre bed bearing rubber change |
| 18 | To service turbo charger |
| 19 | To service nozzle only |
| 20 | To repalce diesel filter, oil filter change and oil service |
| 21 | To repalce 4\" suction tank output valve 1 no\"s |
| 22 | To replace suction hose 4\" camlock set 2 set |
| 23 | To repalce tank back door rubber 50mm x 50mm 6 meter |
| 24 | To replace suctionheavyduty 4\" hose 7mm thickness 15 meter |
| 25 | To replace theromo set velve change |
| 26 | To replace suction pump belt 3 no\"s |
| 27 | To replace air tank release valve |
| 28 | To replace PTO UJ cross 1 no |
| 29 | To carryout bumper to bumper tinkering work |
| 30 | To carryout complete painting work |
| 31 | To carryoutartist work |
| 32 | To complete electrical checkup & bulb change |
| 33 | To carryout driver seat, cleaner seat liner work |
| 34 | To replace relfecting sticker, mudguard flop & side mirror |
| 35 | To carryout speed governer fitment & reneval |
| 36 | F.C Work & Pollution checkup certificate |
| 37 | Add GST 18% |