| 1 | Dismantling of cement concrete or brick or granolithic floors including base concrete and including stacking of materials as directed by engg. i/c. within a distance of 60mtr. |
| 2 | Earth work in surface excavation by mechanical means (Hydraulic excavator)/manual means foundation trenches or drain (not exceeding 1.5m in width or 10sqm on plan), excavated soil and disposal of surplus excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m including dressing and sides and ramming of bottoms, lift upto 1.50m including getting out the all kinds of soil. |
| 3 | Providing and laying in position cement cocrete of specified grade excluding the cost of centering and shuttering - All work up to the plinth level in 1:4:8 (1 cement : 4 coarse sand (zone-iii) : 8 graded stone aggregate 40 mm nominal size |
| 4 | Providing, laying and jointing of 300mm dia R.C.C. NP-2 hume pipe with all charges complete. |
| 5 | Brick work with common burnt clay (non modular) bricks of class-150 in foundation and plinth in cement mortar 1:4 (1 cement : 4 coarse sand) |
| 6 | 12mm cement plaster of mix : 1:4 (1 cement : 4 coarse sand) |
| 7 | Construction of granular sub base (GSB) by providingcoarse graded material, spreading in uniform layer with mortor grader on prepared surface, mixing by mixin place method with rotovator at OMC and compacting with viberatory roller to achieve the desired density as per clause 401. |
| 8 | Providing and laying in position cement cocrete of specified grade excluding the cost of centering and shuttering - All work up to the plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand (zone-iii) : 3 graded stone aggregate 200 mm nominal size |
| 9 | Raising manhole by dismantling & refixing of manhole cover & frame including dimantling C.C. and C.C. work in 1:2:4 but excluding brick work which taken separately and all completion of work. |
| 10 | Providing and fixing in position precast R.C.C. Mahole cover and frame of required shape and approved qualityCircular shape 500mm internal diameter |
| 11 | Construction of manhole chamber of 0.60x0.60x0.90m internal size with b/w, plaster, cover, C.I. sheet, labour T&P etc required for proper completion of work. |
| 12 | Construction of gullypit of 0.60x0.60x0.75 m internal size with jali, labour, T&P etc, required for proper completion of work. |
| 13 | Disposal of morrum/building rubbish/malwa/similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading t oapproved municipal dumping ground for lead upto 10.00km distance with all charge complete. |
| 14 | Add 18 % G.S.T. |