| 1 | Safe loading Carriage & unloading of following material from store centre to pit site/JE dump store. |
| 2 | PCC Pole of size 8.5 mtr long |
| 3 | ST pole 11 mtr. Long. |
| 4 | Stay Set Complete |
| 5 | 11 & 33 KV Pin with Net |
| 6 | Disc insulator With fitting (B&S) 70KN |
| 7 | MS Earthing Rod(2540x20 mm) With Fitting |
| 8 | ACSR Weasel Conductuctor |
| 9 | GI Wire |
| 10 | LT XLPE Cable Aluminum 3.5×240mm2 |
| 11 | LT XLPE Cable Aluminum 3.5×400mm2 |
| 12 | LT XLPE Cable Aluminum 1×240mm2 |
| 13 | LT XLPE Cable Aluminum 1×400mm2 |
| 14 | Dog/Rabbit conductor |
| 15 | ABC (1X16+1X25)Sqmm |
| 16 | ABC (3X50+1X35+1X16)Sqmm |
| 17 | ABC (3X95+1X70+1X16 Sqmm) |
| 18 | ABC (3X120+1X95+1X16 Sqmm) |
| 19 | Work |
| 20 | Replacement of Broken PCC single Pole and Errection of PCC Pole 8.5 mtr long with all accessories |
| 21 | Replacement of Broken PCC double Pole and Errection of PCC Pole 8.5 mtr longwith all accessories |
| 22 | Replacement of Broken ST single Pole and Errection of ST Pole 11 mtr longwith all accessories |
| 23 | Replacement of Broken ST double Pole and Errection of ST Pole 11 mtr longwith all accessories |
| 24 | Straightening tillted double Pole |
| 25 | Re-Stringing of three phase ACSR Weasel Conductor for 11 KV line. |
| 26 | Re-Stringing & Sagging ABC (1X16+1X25)Sqmm |
| 27 | Re-Stringing & Sagging ABC (3X50+1X35+1X16)Sqmm |
| 28 | Re-Stringing & Sagging ABC (3X95+1X70+1X16 Sqmm) |
| 29 | Re-Stringing & Sagging ABC (3X120+1X95+1X16 Sqmm) |
| 30 | Straightening Tillted of PCC/ ST Pole. |
| 31 | Rebinding of Stay Set. |
| 32 | Stringing & Sagging of LT XLPE Cable Aluminum 1×400mm2 |
| 33 | Stringing & Sagging of LT XLPE Cable Aluminum 3.5×400mm2 |
| 34 | Stringing & Sagging of LT XLPE cable (1×240)sq.mm. |
| 35 | Stringing & Sagging of LT XLPE cable (3.5×240)sq.mm. |
| 36 | Stringing & Sagging ABC (1X16+1X25)Sqmm |
| 37 | Stringing & Sagging ABC (3X50+1X35+1X16)Sqmm |
| 38 | Stringing & Sagging ABC (3X95+1X70+1X16 Sqmm) |
| 39 | Stringing & Sagging ABC (3X120+1X95+1X16 Sqmm) |
| 40 | Fabrication erection and commissioning of 25/16/10 KVA T/F on double/single pole with all accessories. All material except 25/16/10 KVA T/F shall be supplied by the contractor. |
| 41 | Fabrication erection and commissioning of 63/100 KVA T/F on double pole with all accessories. All material except 25/16/10 KVA T/F shall be supplied by the contractor. |
| 42 | Erection of Stay Set Complete. |
| 43 | Fixing of Ordinary earthing by 11 KV MS earth Rod 2500 mm long as per RESPO schedule. |
| 44 | Stringing ofACSR Weasel Conductor for 11 KV line |
| 45 | Stringing ofDog/Rabbit conductor for 33 KV line |
| 46 | Guarding of 33 KV Line |
| 47 | Looping & chopping of tree branches for clearance of HT/LT line after clearance of line throughout pieces of tree branches of site (Approx 3 Km). |