| 1 | Earth work in Excavation in foundation in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of oxcavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30 M form the foundation trenches. (Rate including Royalty of earth also) (4-Chapter S.I.NO.- 251) PWD Shedule |
| 2 | Providing and laying cement concrete in 1:5:10 (1 cement :5 fine sand 10 graded stone aggregate 40mm nominal size)and curing complete, including cost of form work in foundation and floors. (5-Chapter PWD.Si.-01) |
| 3 | Class-150 brick work in 1:4 cement and coarse sand, mortar in foundation and plinth including supply of all materials, laborand tools and plants, etc. Required for proper completion of the work. ( Chapte No. 06 S.I. No. 2) |
| 4 | 12mm thick cement plaster in single coat of fair side of single of half brick wall forinterior plastering up to floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and smooth. No extra for mixing any additive.(c) 1 cement : 4 Coarse sand.(Chapter No. 13 S.I. No.-582(ii))PWD Shedule |
| 5 | Finishing Wall Putty Aproved brand and manufacture and of required shade and undecorated wall surface to give and even shade over and including curing and cost of all material. (15-Chapter Si.No.27 New) |
| 6 | Finishing walls with exterior emulsion paint (Apes) of apprised brand and manufactured and of required shade and undecorated wall surface to give even shade over 1.25 Ltr/10sqm including one cout of primer applied 0.75Ltr/10sqm coat curing and cost of all material, labour. TAP etc recuired for proper completion of work |
| 7 | Providing and laying cement concrete in 1:24 (1 cement 2 coorse sand 4 graded stone aggregate 20 mm nominal size) and curing complete, including con of form work in foundation and floors. (DSit (SN-4.1.3) |
| 8 | Steel work welded in built up sections framed work including cutting, hoisting fising in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings. frames, guard bar, ladder, railings, brackets, gates and similar works |
| 9 | Paint of the two coat over priming ocat including cost of priming coat) new steel gril etc all complete |
| 10 | Providing and fixing of barricading of 100min average ballies with in a distance of 1.50 meter for 3 rows of 30, 3 Nosof cross ballies, tho supporting ballies of 3 meter ballies and 2 Nos perpendicular hallies tie with moonj rope including supply of all material such as hallies rope T&P required for proper completion of work and also including labour component (material will be property of contractor after |
| 11 | dismantline Supply of R.C.C. Slab (900X450X150MM) with loading & unloading for site etc. |
| 12 | fixing of RC.C. Slab (900X450X150MM) with loading & unloading for site etc. |
| 13 | Total(A) |
| 14 | Add amount for Estimate Figure match |
| 15 | Say Amount |