| 1 | Part - A ( Material)Following Material Supplied by the Contractor:- |
| 2 | Supplyand Installationof 24 Volt Battery Set |
| 3 | Supplyand Installation of 24 Volt Battery Charger |
| 4 | Supply of 24 Volt Battery Cabinet |
| 5 | 11 KV TPMO with Polymer Insulator with Complete |
| 6 | SUPPLY OF PRE COST OF A& B TYPE PANNEL |
| 7 | 11 kV Fuse Set wit Complete |
| 8 | Connector for LL/BLLA |
| 9 | Copper L-Piece 50x8mm |
| 10 | lug of diiffrent size |
| 11 | PG Clamp for Dog Conductor |
| 12 | Fire Extiagutsher mount type |
| 13 | HDPE Pipe 6\"\" dia with PN-6 Specifiacation |
| 14 | I Hook |
| 15 | Suspension Clamp |
| 16 | Dead end Clamp |
| 17 | Supply of Gland 63 mm |
| 18 | SUPPLY OF 11 KV RMU |
| 19 | Supply of Gland 63mm |
| 20 | Supply of Gland 50 mm |
| 21 | Part A :For 33 kv & 11 KV Line The work of safe carriage of the following material with loading/unloading from store centre Darshan Nagar to site of work. (Approx. Distance 0 to 20 Km.) |
| 22 | 33 KVVCB 800A, 750 MVA |
| 23 | CT OD 33 KV CTR 200/100/1-1A |
| 24 | PT OD 33 KV PTR 33 KV /110 V |
| 25 | 33 KV line Isolator |
| 26 | 5 MVA Power Transformer |
| 27 | 33 KV lighting Arrestor |
| 28 | 11 kV incoming Switchgear 600/300/5A, 350 MVA 630A |
| 29 | 11 kV Outgoing Switchgear 200/100/5A, 250 MVA |
| 30 | 11 KV 3 Core 3x300 mmsq XLPE Cable |
| 31 | panther conductor |
| 32 | 11 KV 3x120 mmsq XLPE Cable |
| 33 | 11 KV Cable Jointing Kit indoor 3x300 sqmm |
| 34 | 11 KV Cable Jointing Kit outdoor 3x300 sqmm |
| 35 | 11 KV Cable Jointing Kit indoor 3x120 sqmm |
| 36 | 11 KV Cable Jointing Kit Straight through 3x120 sqmm |
| 37 | 11 KV Cable Jointing Kit outdoor 3x120 sqmm |
| 38 | S.T. Pole 11 Mtr. Long |
| 39 | 33 kv disc & disc fitting |
| 40 | 33 kv post insulator |
| 41 | 11 kv pin insulator with pin |
| 42 | 11 kv top channel |
| 43 | ACSR Dog Conductor |
| 44 | PCC Pole 8.5 Mtr. Long |
| 45 | AB Cable 3x120 sqmm |
| 46 | Transformer 250 KVA |
| 47 | Transformer 100 KVA |
| 48 | XLPE Cable 1x240 sqmm |
| 49 | L.T. XLPE Cable 1x400 sqmm |
| 50 | earthing |
| 51 | A Type Pannel |
| 52 | BType Pannel |
| 53 | Other Line material i.e. cross arm / conductor / pin insulator / stay / earthing/cable Box etc. except A.B Cable. |
| 54 | Cable stand StructureFabrication & erection of 11 KV Cable Stand made of 02 No. M.S chanel 125x65x6 mm 3 Mtr. Jointed to each other by M.S Channel horizontally and also jointed to each other by means of 05 No. M.S Strip (m.s flat) 50x6 mm of size 200 mm long each by welding at actual distance interval as per norms. And grouting in block of 300x300x700 completely providing 02 no. cable clamps also and eathing by G.I strip 50x6 mm size with the earth mat of switchyard both side of legs and provideing clamps , post/ pin insulator for holding cable. (All the materials will be arranged by the contractor such that clamps nut bolts and civil materials except M.S channel.) |
| 55 | Neutral standFabrication and grouting of M.S Channel 125x65 mm L shape & in proper size and allignment to provide support for the two separate earthing strips for pwer T/F neutral including supply & fixing of two No.Flexible copper bonds for neutral earthing. (All the materials will be arranged by the contractor such that clamps nut bolts and civil materials except M.S channel.) |
| 56 | Supply & Laying of 6x2.5 sq.mm. armoured control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey charger, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. (All the material will be supplied by the contractor) |
| 57 | Supply & Laying of 4x2.5 sq.mm. armoured. control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey charger, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. (All the material will be supplied by the contractor) |
| 58 | Supply & Laying of 2x2.5 sq.mm. armoured control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey charger, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. (All the material will be supplied by the contractor) |
| 59 | Instalation of Lightening Arrestor with StructureFabrication of Lightening Arrestor per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x 0.3 x0.3 Mtr providing stone pad at the bottom of the pit and grouting of two legs of the above structure in CC ( cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of 1.075 Mtr X 0.3 Mtr x 0.3 Mtr including supply of all T&P complete in all respect. The work includes dragging, Shifting upto 40 Mtr. Raising and erecting the two legs with Top frame above structure\"s in properallingment level and plumb. Both plinths of the structure shall be properly finished with champering of edges etc.(All material will be supplied by the contractor ). |
| 60 | Installation of Line Isolators with StructureAssembling and installation of line/Bus isolator on the Isolator structure , adjusting of opening mechanism in proper alignment so as to ensured smooth operation of the same. In case of line Isolator proper operation of earth links shall also be ensured. The work includes fabrication for proper fixing if required. |
| 61 | Installation of Post Insulator with StructureFabrication of Post Insulator per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x 0.3 x0.3 Mtr providing stone pad at the bottom of the pit and grouting of two legs of the above structure in CC ( cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of 1.075 Mtr X 0.3 Mtr x 0.3 Mtr including supply of all T&P complete in all respect. The work includes dragging, Shifting upto 40 Mtr. Raising and erecting the two legs with Top frame above structure\"s in properallingment level and plumb. Both plinths of the structure shall be properly finished with champering of edges etc.(All material will be supplied by the contractor Except steel). |
| 62 | Installation of 33 KV VCB 800 A, 750 MVA |
| 63 | installation of control pannel for double transformer |
| 64 | Installation of CT OD 33 KV CTR 200/100/1-1A |
| 65 | Installation of PT OD 33 KV PTR 33 KV /110 V |
| 66 | Installation of 11 kV incoming Switchgear 600/300/5A, 350 MVA 630A |
| 67 | Installation of 11 kV Outgoing Switchgear 200/100/5A, 250 MVA |
| 68 | Installation of CT with Structure |
| 69 | Installation ofPT with Structure |
| 70 | 90 lbs Rail PCS for Transformer Plinth (44.64 kg/m |
| 71 | Dragging of ST/PCC Pole as per RESPO Norms. |
| 72 | Fabrication and Erection of Double Pole Support on ST Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPoNorms.(Cost of clamps borne by contractor) |
| 73 | Fabrication and Erection of Single Pole Support on PCC Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPoNorms.(Cost of clamps borne by contractor) |
| 74 | Earthing of Poles by Ms Earthing rod of 20x2500 mm and 6 swg earthing wire etc.as per RESPO Norms |
| 75 | Construction of plinth for 11kv RMU with iron fencing(all the material will be supplied by the contractor.) |
| 76 | Installation of 11 KV RMU with all fitting |
| 77 | Plinth of 5 MVA, 33/11 KV T/FsMajor Repairing of Plinth of size 3.46x3.46 Mtr for5 MVA T/F having not less than 0.4 Mtr above ground level. The work includes Excavation of foundation, Base concreting in C.C. 1:6:12 ratio ( cement,fine sand and Brick ballast) 1ST Class bricks work in cement mortar of ratio 1:4 foundation, C.C. in 1:4:8 ratio( cement, fine sand and brick ballast) and RCC working ratio 1:2:4 ( cement, coarse sand and stone grit of 20 mm gauge) using MS Bars of 10 mm Dia (Tor) in reinforcement including its cutting, bending and binding in required shape. The work also includes laying of 2 Nos. 3.46 mts long each rail pieces complete with cutting, welding and proper fitting etc. The plinth will be made as per Drawing and shall be plastered/ finished on Top and Side of the plinth. (All the material will be supplied by the Contractor except rail Piece) |
| 78 | Construction of Plinth Foundation of VCB (all the material will be supplied by the contractor.) |
| 79 | Construction of Plinth for DT |
| 80 | construction of trunch for control cable (155mm x250 mm |
| 81 | fencing of dt |
| 82 | Chemical Earthing for A Pannel (all the material will be supplied by the contractor.) |
| 83 | Sign. Board anr other Sunderyitems of Sub-Station |
| 84 | Painting of Sub-Station Struture |
| 85 | Single line Diagram Board, Notice Board, Max Min load board Complete |
| 86 | Commissioning of 5 MVA Transformer |
| 87 | Earthing by way of boring and lowering of \"B\" class G.I. pipe 50 mm dia 20 mtr. Long from ground upto the water lavel it will be connected to the G.S. Strip for T/F nutral connection the earth strip will be welded to the G.I. pipe the work also included top cap and clamps for pouring water the cost of all material will all labour and T n P etc. complete in all respect . (all the material will be supplied by the contractor.) |
| 88 | Delta type Earthing of Power T/F Neutral Earthing of Power T/F Neutral by providing 03 No. of \"B\" class G.I. pipe 50 mm Dia 20 feet longfrom ground upto the water level The work also includes Cap & Clamps for pouring water, the cost of all material with all labour & T&P etc. Complete in all respect and arrangement of G.I Pipe like delta it will be connected to eachother and Providing and laying G.S. strip 50 x 6 mm including cutting, welding, bending etc. complete in all respect.(All the material will be supplied by the contractor) |
| 89 | Erection and Installation of 33/11 KV 05 MVA TransformerDragging of 33/11KV 05 MVA T/F from Dump site to road site and shifting of the T/F from road site to new constructed plinth distance about 150mtr ,along with loading, unloading and carriage, fixing and fitting of all the accessiories and filling of T/F oil to the desired level and insuring that there is no leakage. Erection and installation of 33/11 Kv, 05 MVA Transformer in a leveled position on the plinth. |
| 90 | Road Restroration Charge and Permission of NHI |
| 91 | Control Board with fitting all equipament |
| 92 | Mounting of 250 KVA Transformer as per RESSPO Norms. |
| 93 | Mounting of 100 KVA Transformer as per RESSPO Norms. |
| 94 | Water Shoking Chambers with Covers of size (0.75x0.75x1.0) Mtr. In switch yard corners for rain water harvesting & for earthing |
| 95 | Trench Cover (200mmx600 mm) |
| 96 | Stringing, Sagging, binding and jumpering of ACSR Dog Conductor as per RESSPO Norms |
| 97 | Stringing, Sagging, binding and jumpering of AB Cable 3x120 sqmm as per RESSPO Norms |
| 98 | Laying of 11 KV XLPE cable 3X300 sq.mm (Single circuit/ DC ). XLPE cable as per ISS 1255/1983 of amendment there of by trench iess Technology method by Deep Drilling System. The jop includes the cost of excavation of Earth, laying of cable inside it. The work is to be carried out as per Govt. approved Drg.. |
| 99 | Hosting and Looping of Cable |
| 100 | Laying of 11 KV XLPE Cable 3x120 sqmm in Duct |
| 101 | Laying of HDPE Pipe with Cable |
| 102 | Laying of 11 kv cable without hdpe pipe |
| 103 | Installation of Heat Shrinkable Type cable jointing kits indoor end Termination suitable for 11 KV XLPEcable 3x300 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.) |
| 104 | Installation of Heat Shrinkable Type cable jointing kits outdoor end Termination suitable for 11 KV XLPEcable 3x300 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.) |
| 105 | Installation of Heat Shrinkable Type cable jointing kits indoor end Termination suitable for 11 KV XLPEcable 3x120 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.) |
| 106 | Installation of Heat Shrinkable Type cable jointing kits outdoor end Termination suitable for 11 KV XLPEcable 3x120 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.) |
| 107 | Installation of Heat Shrinkable Type cable jointing kits Staight Through end Termination suitable for 11 KV XLPEcable 3x120 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.) |
| 108 | Laying of LT XLPE Cable Alluminum 1x400 sqmm as per RESSPO Norms. |
| 109 | installation of main bus bar complete with structure bracing top channel etc as per respo norms |
| 110 | Laying ofXLPE Cable 1x240 sqmm as per RESSPO Norms. |
| 111 | Installation of Distribution Pannel (A- Type) |
| 112 | Laying of ABC with all fitting |
| 113 | Grouting of pole ( pcc 8.5,11 mtr ) |
| 114 | Installation of Distribution Pannel (B- Type) |
| 115 | Making of 11 KV Cable along with fixing of G.I. Pipe and Clamp. |
| 116 | Fixing and Inderloacling Bricks in Switchyard & Approch Road |
| 117 | Extention of Control Room SIZE |