| 1 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) |
| 2 | Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete. |
| 3 | ProvidingandlayingCastinsitu/ReadyMixcementconcreteinM-10oftrap/granite/ quartzite/gneissmetalforfoundationandbeddingincludingbailingoutwater,Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided,finishingifrequiredandcuringcomplete,withfullyautomaticmicroprocessor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete.With fine aggregate (Crushed sand VSI Grade) |
| 4 | Providing cast in situ / ready mix M10 grade cement concrete for head walls of CD work / retaining walls etc. including necessary form work, compaction, finishing and curing etc. complete. (with reversible drum type mixer/ concrete batch mix plant (pan mixer)with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc ), cement 4.05 bags/cumt) |
| 5 | Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete. |
| 6 | ProvidingandlayingCastinsitu/ReadyMixcementconcreteM-20oftrap/granite/ quartzite/ gneiss metalforR.C.C. slabsand landings as perdetailed designsand drawingsincludingsteelcentering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic microprocessorbasedPLCwithSCADAenabledreversibleDrum Typemixer/concreteBatchmixplant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) |
| 7 | Providing and laying Cast in situ/Ready Mix cement concrete in M15 of trap/ granite/quartzite/gneissmetalforbedblocks,foundationblocksand suchotheritems includingbailingoutwater, Steelcentering, formwork,laying/pumping,compacting, rougheningthemifspecialfinishistobeprovided,finishingunevenandhoneycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny bag, plastic,tarpaulinetc.(Woodencenteringwillnotbeallowed.),withfullyautomaticmicro processor based PLC with SCADAenabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) |
| 8 | ProvidingandfixingheavydutyinterlockingconcreteGreypavingblocksof80mm thickness of having a strength of 300 Kilogram/Sq.cm. of approvedquality andshape ona bed of crushed sand of 25 to 30 mm thick including skirting joints and cleaningetc. complete. |
| 9 | Providingandfixing90cmx60cmMarbleplateengraving10cm.heightletter,figures including painting the lefters/figures with approved colour and shade complet |
| 10 | Reimburcement of Testing Charges if Contractor Produces Test Results duly certified by Deputy Engineer A. Stone / Rubble |
| 11 | B. Paving Blocks |
| 12 | C. Compressive Strength Of CC Cube |
| 13 | Reimburcement of Royalty Charges if Contractor Produces Original Transport Passes, Supplied by revenue Department. For Sand |
| 14 | Reimburcement of Royalty Charges if Contractor Produces Original Transport Passes, Supplied by revenue Department. For Rubble/Other |
| 15 | Add 18% for GST |
| 16 | Add 0.5% forInsurance |
| 17 | Add 1% for SQM Charges |