| 1 | Safe Loading Carriage & Unloading of following material from Central stroes Daliganj to J.E.\"s Store and from J.E.\"s Stores to work at site |
| 2 | (a) STP Pole 9/11/13 Mtr Long. |
| 3 | (b) PCC Pole 8.5 Mtr long. |
| 4 | (c) ABC 3x95/120+1x70+1x16 sqmm |
| 5 | Fabrication and erection of missing/damaged wire mesh fencing 02 Mtr. Height with a gate and with retaining grouting of Fabrication M.S. Angle 65x65x6 mm support (05 Nos. in a Sub- Station). Palinthing of fencing/support with all material as per specification/drawing complete in all respect. |
| 6 | Construction/ repairing of Damaged part of masonry transformer Plinth of size as per required at site to maintain the height of 1.5M with brick cement coarse sand and brick ballast, filling of sand in the hallow space. Plastering of surface in ratio 1:4:5 and top of the plinth 4 thinkness concealing. (All material, Labour And T&P will be provided by the contractor |
| 7 | Repairing of damage/Rusted Steel Tubular Pole by digging of pit up to2 for proper position, Putting 3 Nos. Angle From of size 35x35x6 mm, 3 Long properly welding on 3 circle with pole than Grouting and Plinthing 300 mm Above level with cement concrete and sand and bricks ballast, (All material, labour and T&P will be provided by the Contractor) |
| 8 | Construction of masonry type transformer plinth of size 2x2x1.5 M with brick, Cement, coarse sand , sand & brick ballast, filling of sand in the hallow space plastering outer surface in ratio 1:4;6 top of the plinth 4 thickness grouting of 2 nos. MS Channel of size 100x50x2000mm on the top of the plinth for placement of transformer (All the Material will be arranged by the contractor at his own cost) |
| 9 | Pipe type Earthing of T/F with 60 feet deep borring and providing GI Pipe 1.5\" dia (60 feet GI pipe) and GI strip 25 × 5 mm x 6 mtr long attached with clamps L piece nut & bolts and GI pipe Cap. All material shall be arranged by the contractor. |
| 10 | Supply Of Fixing of Henley type taleless fuse unit on LT distribution pilled box with Clamping of lug required size of side in LT PVC cable |
| 11 | 500Amp / 600 Volts |
| 12 | 300Amp / 600 Volts |
| 13 | Re sagging of L.T, O/H, ABC Line, opening of ABC at service point fromdistribution box and opening of Consumer service cable after Re-sagging ofABC Re Connection of Consumer Service cable on ST Pole/PCC . (All thematerial will be arranged by the Contractor) |
| 14 | Fixing of Cu L Piece of size 300x65x6 mm 400/250 KVA L/T Bushing Rod forproper Connection of LT cable. (All the material will be arranged by thecontractor) |
| 15 | Re sagging of L.T/H.T.including 33 kv lineline along with spare parts and hydra for various spans |
| 16 | Replacement of broken /damaged PCC Pole (As per RESPO Norms) |
| 17 | Installation of D.O. arrangement including mounting of clamps with nuts &bolt, 11 KV Pin insulator with pin (All material will be provided by thecontractor) |
| 18 | Cutting & Chopping tree branches for clearence of HT Line |
| 19 | Proper dressing of LT and 11 KV cable of 11/0.4 S/S with fixing accessories |
| 20 | Cleaning of 11/0.4 KV S/S Removed garbage dump and stacking it out side the fencing area. |
| 21 | Checking of oil in Transformer |
| 22 | Replacement of LT Cable lead wherever (Required Material provided by Department.) |
| 23 | Removing of oil leakage in Transformer |
| 24 | Replacement of burnt jumpers of LT Line. |
| 25 | Replacement of burnt jumpers of HT Line. |
| 26 | Cleaning of switch yard of 33/11 KV Line. |
| 27 | Replacement of Disc insulator & insulator in 11 KV/ 33 kvLine |
| 28 | Attending Breakdown of 33 Kv Line (By opening & Closing of cable at deferentexposures.) |
| 29 | Attending Breakdown of 11 Kv Feeder (By opening & Closing of cable atdifferent exposures.) |
| 30 | Cradle guarding of HT Line by GI span wire. GI wire Supplied by contractor. |
| 31 | Replacement of damage LT cable box 3.5x240sqmm |
| 32 | Lug punching with replacement of damaged Lugs with nut & bolt in LTCompartment of piller box |
| 33 | Lug punching with replacement of damaged Lugs with nut & bolt in LT 11/0.4KV 400 KVA T/F. |
| 34 | Lug punching with replacement of damaged Lugs with nut & bolt in LT 11/0.4KV 250 KVA T/F. |
| 35 | Supply & fixing of CJ kit |
| 36 | 33 KV O/D / I/D 3x300 sq mm |
| 37 | 33 KV ST 3x300 sq mm |
| 38 | 11 KV O/D / I/D 3x70/120/185 sq mm |
| 39 | 11 KV ST 3x70/120/185 sq mm |
| 40 | GST will be paid extra as per rule. |