Power Boards / Undertakings / PSU Closing in 0 days TDR #49288815

Tender For Construction Of 132 Kv Amplus Tungbhadra Solar Bay And Modification Of 132 Kv Bus, Shifting Of High Mast At 132 Kv S/S Pasahi Under Etd, Robertsganj.

Issued by Boards / Undertakings / PSU · robertsganj, Uttar Pradesh
Tender Value
8.47 Lakhs
Estimated cost
Bid Submission
28 May 2025
0 days left
EMD
9000
Bank guarantee accepted
Document Fee
590
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
robertsganj → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of 132 Kv Amplus Tungbhadra Solar Bay And Modification Of 132 Kv Bus, Shifting Of High Mast At 132 Kv S/S Pasahi Under Etd, Robertsganj.

BOQ

Name of Work: Construction of 132 KV Amplus Tungbhadra solar bay and modification of 132 KV Bus, shifting of high mast at 132 KV S/S Pasahi under ETD, Robertsganj.
Sl. No. Item Description
1Construction of 01 nos. 132 KV Solar bay, modification of existing bus , shiftingof High mast for Amplus Tungbhadra Solar Generation plant at 132 KV Pashi S/S
2Preparing of earthmat by laying of 40mm dia M.S. round bar 800 mm below ground level insoil including cutting, bending straightening, welding & painting excavation of trench, its back filling& all other associated work to complete the work satisfactorily as per drawing & technical specification excluding the cost of round bar.
3Pecking of 3 mtr. Long electrode vertically inside the ground with top 800 mm below ground level and its welding with main Earthmat and painting as per relevantPaint.
4Safely Shifting of High mast light from existing place to suitable place in switchyard area by dismantling it from the plinth and erect it into the new plinth and make connections with all materials required for proper installation and luminaire.
5Erection of Lattice type main and auxiliarystructures (ATMS, AXM,BTM,ALP,BCT,BBL,BTI etc. at 132 KV Sub Station,Pashi including sorting, shifting, matching of hole and other associated work to complete the job as per technical specification of UPPTCL including shifting of material from store to erection site. All men and T&P required for satisfactory completion of work shall be arranged by the contractor.
6Sl Description Nos. Unit Weight (MT) Total Unit Weight i.132 KV BTM 20.721.44ii. 132 KV PI & LA - ALP 7 0.121 0.847iii. 132 KV Column-ATMS51.231 6.155iv. 132 KV Beam - AXM50.8124.06v. 132 KV Peak- XPM50.084 0.42vi. 132 KV Mast – YMM50.022 0.11vii. 132 KV Isolator- BBL 6 0.5013.006viii. 132 KV CT/PT-BCT180.1793.222ix. 132 KV TI-BTI 2 0.584 1.168
7Erection of following new equipment as per instruction manual of various equipments including its shifting from the store to the site job including other associated works to complete the job satisfatorily.
8132 KV CB
9132 KV BI with insulator
10132 KV LI with insulator
11132 KV TI with insulator
12132 KV CT
13132 KV CT junction box
14132 KV PT
15132 KV PT junction box
16132 KV LA
17132 KV PI
18132 KV control Panel as per technical specification of SAS Simplex type control and relaypanel for 132 KV Feeders .
19Earthing of structure and equipment byMS flat (provided by department) including cutting straightening bending laying 800 mm below inside the ground with main earthmat including painting of joints with non corrosive paint on flat,. painting at the flat on structure with the Bus green paint after one coat of red oxide primer and back filling of excaveted tranch along with proper ramming and all associated work.
20Earthing by 75x10 mm MS Flat.
21Earthing by 25x6 mm MS Flat.
22Earthing by 50x6 mm MS Flat.
23Laying of following size of unarmoured control cable in the cable trench on perforated tray from the control relay panels to the various equipment junction box etc. in switchyard as per cable schedule, its saddling in proper distance with al. saddle of size 25x3 mm including carriage of cable drums from the store to the laying site and other associated work to complete the job satisfactory.
242Cx2.5mm2
254Cx2.5mm2
266Cx2.5mm2
27Termination of following size control Cable as said above as per cable schedule including making necessary holes in gland plate of box wherever required supply and fixing of cables glands ferrul of appropiate size and nos. respectively for each core of cable and its terminationwith crimping type lugs and all associated work to complete the job satisfactory. ( One no. equal to both side termination of one core )
282Cx2.5mm2
294Cx2.5mm2
306Cx2.5mm2
31Stringing of 132 KV extension buses( main bus I,II) of all the three phases (R,Y,B) with ACSR Moose conductor including shifting from store to workingplace. Fitting of all trension clamp, hosting of insulators and proper clamping
32Stringing of 132 KV extension bus( Transfer bus, jack bus) of all the three phases (R,Y,B) with ACSR Panther conductor including shifting from store to workingplace. Fitting of all trension clamp, hosting of insulators and proper clamping
33Baywise Inter-connection of equipment with specifiedconductor (Jumpering with equipments and buses) with PG Clamp, T-Clamp, Isolator Clamp & CTClamp, wherever necessary, and other associated work to complete the job as per technical specification of UPPTCL including shifiting of material/ equipments from store to erection site and including all other associated work to complete the job.
34132 KV solar bay
35Delta earthing of 120 KV LA consisting of 06 nos. electrode ,its placing inside the ground and connecting all three electrodes with m.s. flat and connecting the same with main earthmat at two places required excluding cost of MS strip and MS round bar.
36Shifting of P.T. from existing main bus I & II to extendedbus I & II area by crane and make all connections including earthing for proper operation .
37Installation of 1.5 Ton branded split Air conditionerwith stabilizer in kiosk room with all electrical items for proper connections.
38Lighting Enhancement workincluding erection of pole and installation of LED fittings and other associated works to complete the work satisfactorily at extended switchyard of 132 KV Pashi substation.

AI Tender Summary

OUR REF NO 49288815
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 8.47 Lakhs
LAST DATE 28-05-2025
Authority
Authority Name Uttar Pradesh Power Transmission Corporation Limited
Work Description Construction Of 132 Kv Amplus Tungbhadra Solar Bay And Modification Of 132 Kv Bus, Shifting Of High Mast At 132 Kv S/S Pasahi Under Etd, Robertsganj.
Basic Detail
Tender No 03/2025-26/ETC/Mzp
Bidding Type Tender
Location
City robertsganj
State Uttar Pradesh
Key Dates
Publish Date 22 May 2025
Submission Date 28 May 2025
Open Date 28 May 2025
Finance
Tender Value 8.47 Lakhs
Tender Fee 590
EMD 9000
Exemption Not Available
Document List
f738668f-8926-4051-b4c8-184c2df80988.html
03.pdf
03Corri.pdf
BOQ_1889874.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

May 22, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
May 28, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
May 28, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

f738668f-8926-4051-b4c8-184c2df80988.html

pdf

03.pdf

pdf

03Corri.pdf

xls

BOQ_1889874.xls

pdf

Tendernotice_1.pdf