| 1 | Loading, carriage & unloading of following materials from centre store Daliganj to work site/ je dump storeand je store to work siteits stacking and vise versa Distance approx (0-35) |
| 2 | (a) Line Material |
| 3 | (b) PCC pole8.5/9 Mtr long/STP Pole 9 Mtr. Long |
| 4 | (c) 11/13 Mtr long Pole |
| 5 | (d) 25/63 KVA T/f/100 KVA T/f |
| 6 | (e) 250/400/630 KVA T/f |
| 7 | (f) ACSR Rabit/Dog/Racoon/Weasel/Conductor |
| 8 | (g) LT PVC Cable 1×400/3.5×240/1×70 SQMM |
| 9 | (h) ABC (3×120/95/70/25/16) SQMM |
| 10 | (i) 11/33 KV XPLE Cable (3×35/70/120/170/185/300) |
| 11 | (j) 11 KV Piller resistant metering cubical |
| 12 | (k) 11 KV Pole mounted CT/PT |
| 13 | (l) DP Box 3 Phase |
| 14 | Fabrication, erection of sub-station type double pole on 8.5 mtr long PCC/11 mtr. Long ST Pole along with fixing of necessary clamps. Accessories required including supply & fixing of straight MS 100×50 mm top channel (2240 mm long) one no. dropper channel/Angle 100×50 mm 2 nos. with arrangement of fixing 3 nos. pin insulator as per RESPO specification and direction of E/I. Only pole & insulator supplied by the deppt. |
| 15 | Dragging of ST/PCC pole to pit site. Digging of pit erection and grouting (As per RESPO norms) of 11KV 9/11 /8.5 mtr long ST /PCC/9 mtr long pole with fixing of necessary items, such as V-type X-arm, F-bracket. 11 KV Pin/Disc insulator, guarding angle(1.8 mm 65×65×6) with nut & bolts its ramming as per RESSPO Specification. Only pole & insulator shall be supplied by the department |
| 16 | Dragging of ST/PCC pole to pit site. Digging of pit erection and grouting (As per RESPO norms) of 33 KV 9/11/13/8.5 mtr long ST /PCC/9 mtr long pole with fixing of necessary items, such as V-type X-arm, F-bracket. 33 KV Pin/Disc insulator, guarding angle(1.8 mm 65×65×6) with nut & bolts its ramming as per RESSPO Specification. Only pole & insulator shall be supplied by the department |
| 17 | Dragging of ST/PCC Pole from dump store to pit site, digging of pit erection & grouting (As per RESPO norms) of LT support suitable for laying of ABC line on 8.5 mtr. Long PCC pole by providing of necessary eye hook/LT shackle insulator with clamps and its accessories etc. as per RESPO specification. Only Pole will be provided by the department. |
| 18 | Construction of T/F plinth of size 2×2×1.2 meters with help of 1st class bricks and massonary in the ratio 1:4 cement & sand coarse, filling the structure completely as per norms with RCC top 1:2:2cement sand coarse, stone grit with MS bar and MS channel for resting T/F. All material shall be arranged by the contractor. |
| 19 | Wiremess fencing of 11/0.4 KV S/S shall be made of rectangular of size as per site requirement not exceeding 3 meter facrication 45×45×5 mm angle the frame is also have 1 no. Horizontal runner of MS flat 40×5 welded in middle to support of wire mess. Rectangular welded type wire mess of size 50×25 made of 12 S.W.G wire mess shall be welded all along the periphery of the frame as well as on horizontal runner to give extra strength of welding to wire mess welded on the frame. Diagonal bracing of all the frame panel will be welded with MS flat of size 25×3mm to support as per RESPO specification & direction of E/I. |
| 20 | Construction of masonry type Distribution Pillar box with first class brick ballast cement. Coarse sand, local sand , brick ballast and MS Round bar of 10 mm dia including supply and mounting of 02 nos. Straight MS Angle 50 ×50×6×750 mm . Henely type tailless fuse units 500 Amps 650 Volts one no for incoming and other for outgoing. Copper bus bar 4 nos 1000×50×6 mm with locking arrangement made of 18 SWG BP Sheet |
| 21 | Providing and fixing of 11 KV DO fuse set along with clamps & nut bolts on existing of double pole |
| 22 | Providing and fixing of 11 KV TPMO along with clamps & nut bolts on existing of double pole |
| 23 | jumphering of 11 kv ht side from top chanel upto transformer withpvc cable with the help of pg clamp /alu lug |
| 24 | Ordinary earthing by MS earth Rod 2500 mm long as per RESPO Schedule Only GI wire & Earth rod shall be supplied by the department |
| 25 | Grouting and Nuzzling of stay set complete including fixing of necessary camps. Accessories required including its grounting by civil material (Sand brick ballast cement) nly stay wire shall be supplied by the Department |
| 26 | Laying and Sagging of 3 phase 3 wrie 11 KV line on ACSR weasel/rabbit/Raccoon/Dog conductor as per RESPO specification and direction of E/I |
| 27 | Cradle guarding of HT line y GI wire. GI wire shall be supplied by the department |
| 28 | Erection & commisioning of (3×120/5/70/25/16 Sq mm) Aerial Bunched Conductor/ABC. |
| 29 | Laying of cable 11 KV XLPE cable (3×35/70/120/170/185) sqmm in pakka road by boring method laying cableAs per RESPO secification & direction of E/I |
| 30 | Laying of cable 33 KV XLPE cable (3×35/70/120/170/185/300) sqmm in pakka road by boring method laying cableAs per RESPO secification & direction of E/I |
| 31 | Climbing of 11 kv xlpe cable from base to pole top chanel / cable laying by clamp into wall / from pole to pole via clamp with proper stacking arrangement of 11 kv xlpe cable . |
| 32 | Hoisting of 11 KV XPLE Cable will be passed thourh MS pipe of reuired size duly clamped with pole at the bottom. Middle and top of the pole |
| 33 | Laying of LT PVC Cable 1×400/3.5×240 sqmm as RESPO specification & direction of E/I. |
| 34 | Supply and fixing of 11 KV Cable joining kit O/D and I/D |
| 35 | Installation of 11 KV CT/PT on double pole connected with metering unit along with providing and fixing of all accessories such as S/S base. MS flat. Clamps nut and bolts its jumpering and commissioning |
| 36 | Construction of brick masonry plinth suitable for installation of 11 KV ilfer metering cubical along with plastering |
| 37 | Dragging of 11 KV Pilfer metering cubical inside the metering room. Its installation and commissiioning |
| 38 | Fixing of 3 phase distribution box/kiosk on the LT poles including all clamps and material required for mounting connections and sealing |
| 39 | Boaring 60 feet of size 2 inch for pipe type earthing of transformer |
| 40 | Supplying and fixing ofGI pipe 1.5\"\" dia (60 fit GI pipe) and GI strip 35×5mm×6 meter long attached with clamps, L piece, nut & bolts and GI Pipe Cap and complition of earthingAll material shall be supplied by the contractor |
| 41 | Safe Installation of 63/100 KVA T/F on double pole by providing and fixing of all accessories along with making HT/LT connection and its commissioning |
| 42 | Safe Installation of 250/400/630 KVA T/F on double pole by providing and fixing of all accessories along with making HT/LT connection and its commissioning |
| 43 | Cutting and chopping of tree branches for clearance of HT/LT Line After clearance line throunghout pieces of tree branches of site |
| 44 | Dismantling and carriageof 250/400 KVA T/F from site to store center. |
| 45 | Dismantling and carriageof 25/63/100 KVA T/F from site to store center. |
| 46 | Strengthening double pole by replacement of top channel sub station base angle suitable for 100KVA T/F |
| 47 | Dismantling of PCC/LT pole its cartage up to JE dump store. After shifting line on new erected pole |
| 48 | Muffing of STP/PCC pole |
| 49 | Grouting of PCC & STP Pole |
| 50 | Dismantling of LT/Ht line including rolling back its conductor. Wire including stacking & transpiration of these materials form site of to JE dump store/Central Store Daliganj Lucknow |
| 51 | Painting of Pole with 2 coat red oxide paint upto top portion and silver paint from bottom portion of pole |
| 52 | Painting of Fencing |
| 53 | GST will be paid extra as per rule. |