}

Replacement Of Pumping Machinery At Bhatakul & Miscelleneous Works At Amarun, Sultanpur And Other Water Supply Schemes Under Central Mechanical Division P.H.E. Dte., purba-West Bengal

Public Health Engineering Department has published Replacement Of Pumping Machinery At Bhatakul & Miscelleneous Works At Amarun, Sultanpur And Other Water Supply Schemes Under Central Mechanical Division P.H.E. Dte.. Submission Date for this Tender is 02-06-2025. Pumping Machiney Tenders in purba West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

49285562
Replacement Of Pumping Machinery At Bhatakul & Miscelleneous Works At Amarun, Sultanpur And Other Water Supply Schemes Under Central Mechanical Division P.H.E. Dte.
Tender
Indian
West Bengal
Purba
02-06-2025

Tender Documents

Tender Details

Replacement of pumping Machinery at Bhatakul & miscelleneous works at Amarun, Sultanpur and other water supply schemes under Central Mechanical Division P.H.E. Dte.- 1 Bhatakul Zone 1 PH 2 2 Thorough checking for finding out the faultin Pumping machinery as per direction of EIC. 3 Carrying charges for carrying 12.5 HP pump motor set from PHE office (purto Bhavan) to Bhatakul water supply scheme including loading & unloaidng complete as per direction of E.I.C. 4 Supply & delivery of thefollowing materials. 5 3 mtr long 80mm dia UPVC standard type column pipe [cream color] with both side threaded and one end side socketed with registered KPMG. 6 80mm. dia. top & bottom adaptor 7 1.1 KV grade 4 sq.mm x 3 Core water proof flat submersible cable for above motor. 8 80mm dia. N.R.V (PN-1.0 rating) as per IS5312, Make: IVI/Jupiter/Cair/approved make. MOC & TC needed for valve. 9 Nylone rope 1 10 5/8 X 3 Nut Bolt with double washer 11 12 x 12 Rubber Sheet 12 Hiring charges of derrick set for withdrawing of pumping machinery as per direction of EIC. 13 Withdrawing of 12.5 HP oldpump-motor setby hired derick arrangement after disconnection of all electircal and pipe line connection completeas per direction of EIC. 14 Installtionof 12.5 HP pumping machinery & above supplied items by hired derick arrangement and making all electrical and pipe line connection complete as per direction of EIC. 15 Bhatakul Zone 2 PH 1 16 Supply & fitting fixing of 25 watt, LED Fixture set for Phillips Model no. BRP 029 LED with 40mm. dia. × 2.5mtr. long G.I pipe bracket fixing on wall of the Pump House with 3nos. M. S. clamp properly grouting including making power connection with supply and drawing 2.5sq.mm. copper flexible cable wire with controlling sub switch and continuous earthing from nearest junction board all complete as per direction of E.I.C. 17 Supply and delivery of following materials- 18 4 long 20 watt LED tube light set white colour (Make -Philips/ Havells) 19 14 watt LED lamp (Make- Philips/ Havells) 20 Labour charges for fitting fixing of above items and testing complete as per direciton of EIC. 21 Amarun zone 1 PH 2 22 Thorough checking for finding out the faultin Pumping machinery as per direction of EIC. 23 Carrying charges for carrying one nos 10 HP pump motor set from PHE office (purto Bhavan) to Amarun water supply scheme including loading & unloaidng complete as per direction of E.I.C. 24 Supply & delivery of thefollowing materials. 25 3 dia. X 5 ft long M.S. (7.1 mm Thick) Column pipe having both side 11 TPI Thread and Socket. 26 1.1 KV grade 4 sq.mm x 3 Core water proof flat submersible cable for above motor. 27 3 mtr long 80mm dia UPVC standard type column pipe [cream color] with both side threaded and one end side socketed with registered KPMG. 28 80mm. dia. top & bottom adaptor 29 Nylone rope 1 30 5/8 X 3 Nut Bolt with double washer 31 12 x 12 Rubber Sheet 32 Hiring charges of derrick set for withdrawing of pumping machinery as per direction of EIC. 33 Withdrawing of 10 HP oldpump-motor setby hired derick arrangement after disconnection of all electircal and pipe line connection completeas per direction of EIC. 34 Installtionof 10 HP pumping machinery & above supplied items by hired derick arrangement and making all electrical and pipe line connection complete as per direction of EIC. 35 Amarun zone 1 PH 1 36 Thorough checking for finding out the faultin Auto panel as per direction of EIC. 37 Supply & delivery of thefollowing material for repairing of auto panel. 38 Motor protection relay BOCRDS3 as per sample,5-60 amp.make-BCH 39 16 amp TP MCB.make-ABB 40 6 amp SP MCB.make-ABB 41 Amarun zone 2 PH 1 42 Thorough checking for finding out the faultin Pumping machinery as per direction of EIC. 43 Supply & delivery of thefollowing materials. 44 1.1 KV grade 4 sq.mm x 3 Core water proof flat submersible cable for above motor. 45 Service charges for fitting fixing of above cableand testing complete as per direciton of EIC. 46 Supply & fitting fixing of 45 watt, LED Fixture set for Phillips Model no. BRP 031 LED with 40mm. dia. × 2.5mtr. long G.I pipe bracket fixing on wall of the Pump House with 3nos. M. S. clamp properly grouting including making power connection with supply and drawing 2.5sq.mm. copper flexible cable wire with controlling sub switch and continuous earthing from nearest junction board all complete as per direction of E.I.C. 47 Sultanpur PH 1 48 Thorough checking for finding out the fault as per direction of EIC. 49 Supply & delivery of thefollowing Items. 50 Change over switch 100 Amps 415V,50 Hz,4p offload. Make: Havells/ standard/Approve make of P.H.E. Dte.) 51 Service charges for dismantling of damage item andfitting fixing of above itemsand testing complete as per direciton of EIC. 52 Supply & delivery of thefollowing Items. 53 4ft long 20 watt LED tube light set.make-Phillips/approved make 54 14 watt Led lamp.(make-Phillips/approve make) 55 Labour charges for fitting fixing of above items and testing complete as per direciton of EIC. 56 Supply and fitting fixing of 45 watt. LED light fixture set[Make: Philips (Type- BRP)/ Havells/ PHED approved make] with 40 mm dia x 2.5 mtr. long G.I pipe bracket fixed on the roof of the pump house with M.S clamp properly grouting including making power connection with supply & drawing 2.5 sq. mm FR grade flexible copper wire through PVC casing/conduit with drawing earth conductor (1.0 sq mm copper flexible wire), S&F of 15 amp switch with pvc board including electrical connection & testing complete as per direction of EIC. 57 Kaigram PH 2 58 Thorough checking for finding out the faultin electrical system as per direction of EIC. 59 Supply & delivery of thefollowing materials of best quality. 60 FASD MUG-10 starter 415 v,3 Ph with overload relay (relay range: 9-14 Amp)protection.make :LT/Approved Make. 61 Service charges for dismantling of damage item andfitting fixing of above itemsand testing complete as per direciton of EIC. 62 Dirghapara PH 2 63 Thorough checking for finding out the faultin electrical system as per direction of EIC. 64 Supply & delivery of thefollowing materials of best quality. 65 FASD Three Phase415 v ,Submersible Pump starter with Single Phase Preventer(15 HP).(relay range 10-16 amp).make- siemens/approved make 66 Service charges for dismantling of damage item andfitting fixing of above itemsand testing complete as per direciton of EIC. 67 Add GST @ 18% 68 Add Cess @ 1%

Key Value

Document Fees
Refer document
EMD
INR 6400.0 /-
Tender Value
INR 3.06 Lakhs /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail