}

Tender For New Construction Work Of Link Road From Village Palka To Sijhari - Clearing Jungle Including Uprooting Trunk Vegetation Grass,Bush Wood Trees And Saplings Of Girth Upto 30Cm Meassured At A Height Of 1 Mtr. Above Ground Level And Removal Of Rubb, mahoba-Uttar Pradesh

Public Works Department has published Tender For New Construction Work Of Link Road From Village Palka To Sijhari - Clearing Jungle Including Uprooting Trunk Vegetation Grass,Bush Wood Trees And Saplings Of Girth Upto 30Cm Meassured At A Height Of 1 Mtr. Above Ground Level And Removal Of Rubb. Submission Date for this Tender is 28-05-2025. Road Work Tenders in mahoba Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

49283291
Tender For New Construction Work Of Link Road From Village Palka To Sijhari - Clearing Jungle Including Uprooting Trunk Vegetation Grass,Bush Wood Trees And Saplings Of Girth Upto 30Cm Meassured At A Height Of 1 Mtr. Above Ground Level And Removal Of Rubb
Tender
Indian
Uttar Pradesh
Mahoba
28-05-2025

Tender Documents

Tender Details

Tender For New Construction Work Of Link Road From Village Palka To Sijhari - Clearing jungle including uprooting trunk vegetation grass,bush wood trees and saplings of girth upto 30cm meassured at a height of 1 mtr. above ground level and removal of rubbish upto a distance of 50m outside the periphery of area cleared. (S.I. No-259) 2 Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 1000 meter as per MORD technical specification clause 301.5 MORD sepecification 301.5(i) S.No. 3.4(Ordinary soil) 3 Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 1000 meter as per MORD technical specification clause 301.5 MORD sepecification 301.5(i) S.No. 3.4(Carted soil) 4 Construction of subgrade with approved material obtained from borrow pits with all lifts and leads. transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead up to 1000 m as per Technical specification cause 303.1. including Stablization with 2% slaked lime including its mixing with rotabator complete. 5 Cemented Sub Base (GSB+2% CEMENT (OPCBy Mix in Place Method Construction of Granular sub base by providing well graded material, spreading in uniform layer with motor grader on prepared surface mixing by mix in place method with 2% Cement (OPC) with rotavator at OMC and compacting with smooth wheel roller to achive the desired density complete as per clause 401. 6 Cement Treated Base Providing , laying, spreading material on a prepared subgradeadding cement @ 4% by weight of the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined strength and to form a layer of sub base. 7 Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical pecification Clause 503. 8 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.Case - I By Manual Means(I)Bitumen (S-90) 9 Seal CoatProviding and laying seal coat by Manual Means with VG-10 Grade Bitument sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 10 Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 1000 meter as per MORD technical specification clause 301.5 MORD sepecification 301.5(i) S.No. 3.4(Ordinary soil) 11 Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 1000 meter as per MORD technical specification clause 301.5 MORD sepecification 301.5(i) S.No. 3.4(Carted soil) 12 Excavation in foundation in B.C soil including lift up to 15 meterand lead upto 30 m (100 ft) and including filling, watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 Mfrom the foundation trenches.(S.I.No. 251) 13 Sand filling in plinth including supply of necessaryquantityof sandfrom adistance not exceeding 8 Kmfrom the site of work & including watering, dressing etc. Rate to include cost of all materials, labour and tools & plants etc. required for proper completion of the work. (S.I.No. 255) 14 Bedding for Pipe Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) 15 Cement concrete with 4cm (1/2) gauge approved stone ballast, approved coarse sand. cement in the proportion 1:3:6 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. 16 Random course Rubble massonary in 1:4 cement and fine sand mortar in foundation and plinth, including supply of all materials, labour & T&P etc. required for proper completion of the work.(Chpt-8 Add Item (b) 17 Raised pointing with cement and fine sand of 1.25 fineness modulus mortar on brick work in proportion of 1:2 including supply of all materials, labour and tools and plants etc. required for proper completion of the work S.I.No-577 18 Providing and laying of hume pipe NH-3 for culverts with filing of joints in cement and sand mortar in 1:2 includinglabour, T&P etc required for proper completion of work as per of Engineer-in-Charge.1000 mm dia 19 Providing and laying of hume pipe NP-3 for culverts with filing of joints in cement and sand mortar in 1:2 includinglabour, T&P etc required for proper completion of work as per of Engineer-in-Charge.600 mm dia 20 Plastering with cement mortar (1:4), 12 mm thick on R.C.R. work in substructure as per technical specification Clauses 613.4 & 1204 S.I.No-584 21 Cement concrete with 2cm gauge approved stone ballast, approved coarse sand. cement in the proportion 1:2:4 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. 22 Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing etc per drawing and Technical Specification clause 1703 (Km stone) 23 Hectometer stone 24 Poviding & fixing of retro reflective sign board size 1200x900 mm made of 2mm alloy aluminium sheet and 4 mm thick aluminium composite panel sheet fully covered with high intensity retro reflective sheet with MS angle frame of 35x35x5 mm angle iron aluminium sheet painted with 2 coat smoke grey or sky blue paint leg 75x40 mm channel 3 m long complete (size 1200x900mm) (1.08 sq. Mtr.) 25 Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as direction of E.I for the period of five years from the actual completion of workMaintenance cost for 1st year (@0.00 % of total work amount S.No.1-25) 26 Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as direction of E.I for the period of five years from the actual completion of workMaintenance cost for 2st year (@0.75 % of total work amount S.No.1-25) 27 Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as direction of E.I for the period of five years from the actual completion of workMaintenance cost for 3st year (@1.5 % of total work amount S.No.1-25) 28 Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as direction of E.I for the period of five years from the actual completion of workMaintenance cost for 4st year (@2.25 % of total work amount S.No.1-25) 29 Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as direction of E.I for the period of five years from the actual completion of workMaintenance cost for 5st year (@3 % of total work amount S.No.1-25)

Key Value

Document Fees
INR 2720 /-
EMD
INR 592000.0 /-
Tender Value
INR 78.35 Lakhs /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail