|
| 1 | S/F Desel Filter set |
| 2 | S/F Oil filter |
| 3 | S/F of Air filter |
| 4 | S/F of Seprater filter |
| 5 | S/F Pump Plunger |
| 6 | S/F Element |
| 7 | S/F Delivery Valve |
| 8 | S/F Nozzle |
| 9 | Fuel Pump Overhalling Charges |
| 10 | Nozzle Testing & Setting Charges |
| 11 | S/F Hand Primery |
| 12 | Radiator Cleaning and soldering |
| 13 | Brake Oil |
| 14 | Differntial Oil |
| 15 | Steering Oil |
| 16 | Coolent |
| 17 | Clutch Plate |
| 18 | S/F Clutch housing |
| 19 | Master Cylinder |
| 20 | pressure plate |
| 21 | Clutch Bearing |
| 22 | Power Stearing pump |
| 23 | L/C for power Stearing fitting |
| 24 | L/C Dent of cabin portion of Sewer cleaning machine completein all respect. |
| 25 | L/C for painting of cabin from in side & outside complete. |
| 26 | L/C complete chassis/wheel rim painting with 2 coats of painting with 2 coats of paint of for removing portion. |
| 27 | L/C for Sewer cleaning machine tank painting with 2 coats of paint of Red oxide & 2 coats of paint on the Outer Side Surface as per direction of E/I. |
| 28 | L/C complete Sewer cleaning machine tank inside rubber seal Coatint. |
| 29 | L/c front wind screen fitting |
| 30 | C/o wind screen front |
| 31 | S/F cabin side mirror |
| 32 | L/c cabin door opening & both door repairing & new glass Change. |
| 33 | C/o door class cabin |
| 34 | C/o door channel & rubber channel |
| 35 | S/F front Bumper |
| 36 | S/F rear mudguard |
| 37 | S/F Door lock |
| 38 | L/c making the floor |
| 39 | S/F head light, Indicator light, parking light, Tail light. |
| 40 | L/c for repairing of break pressure leakage & complete repair of Break in all respect. |
| 41 | Repairing of all electrical wiring |
| 42 | Pneumatic Cylinder |
| 43 | P.U. pipe |
| 44 | Throttle |
| 45 | L/C for pneumatic Work |
| 46 | PTO Gear box overhauling with cost ofparts |
| 47 | Jetting pump overhauling charges with piston sleeve, Crank Shaft, Bush & Seal kit. |
| 48 | Vaccum pump overhauling charges with piston sleeve, Crank Shaft, Bush & Seal kit. |
| 49 | Directional Valve |
| 50 | Hydraulic Motor (Make DANFOS) |
| 51 | Hydraulic Pipe |
| 52 | L/C for Hydraulic Work |
| 53 | Greesing Complete Vehicle |
| 54 | All 4 Kamamni Opening, Retension & Fitting with replacement of old & Borken Patta. |
| 55 | Master Cylinder |
| 56 | Booster |
| 57 | Brake Pressure Cylinder |
| 58 | Brake pipe set complete |
| 59 | Water Pump Assly. |
| 60 | R/o Radiator |
| 61 | L/C for Clutch & Brake work |
| 62 | S/F Electrical Wiring Set |
| 63 | S/F Horn set with cutout |
| 64 | S/o Nozzle 3/4\" with Adapter for R-2 Pipe |
| 65 | Self Overhouling complete |
| 66 | S/F pressure guage |
| 67 | S/F of Ball Valve/Gate Valve |
| 68 | 2\" |
| 69 | 1\" |
| 70 | S/F one side end female connector of following size |
| 71 | 1\" |
| 72 | 3/4\" |
| 73 | High Pressure Hydraullic Hoses SAE 100 R-2 AT 3000 PSI |
| 74 | 1\" |
| 75 | 3/4\" |
| 76 | R/O Tractor, Trolly, and Tanker |
| 77 | L/C radiator opening & frame change |
| 78 | S/F timing oil seal and timing cover |
| 79 | S/F Injector pipe set |
| 80 | Fuel Injector pump over hauling with cost of material and complete all respect |
| 81 | Injector opening and repairing the new nozzele and disposal parts with cost of parts |
| 82 | L/C head repairing and sheet ftting guide fittingvalve setting complete |
| 83 | C/o valve guide seal head geskit paking kit etc, with machine job |
| 84 | S/F Radiator assy |
| 85 | S/F silencer manifola Assy. Change opening and fittting |
| 86 | S/F Stearing boster shaft |
| 87 | S/F stearing calum bush, colum bush rod change |
| 88 | S/F stearing bearing set |
| 89 | S/F oil seal coloumn bush and oil |
| 90 | S/F kin pin bush set |
| 91 | S/F kin pin bearing |
| 92 | S/F Front axle centre pin bush set |
| 93 | S/F Hood Assy |
| 94 | S/F Oil filter |
| 95 | S/F Disel Filter |
| 96 | S/F Drive seat Assay. |
| 97 | Gear Oil |
| 98 | Mobil Oil |
| 99 | Brake Oil |
| 100 | Coolent |
| 101 | S/F battery 12 volt 25 plate exide make |
| 102 | S/F main shaft Assy. |
| 103 | S/F lind gear Garari |
| 104 | S/F top gear Assy |
| 105 | Gear box over hauling welding cost of main shaft clutch shaft fork with cost of part |
| 106 | Clutch over hauling with clutch plate, pressure plate and clutch bearing with cost of part |
| 107 | Break overhauling with cost of part |
| 108 | S/F break shoe change with cost of part |
| 109 | L/C for repairing of lifter i/c Cost of material |
| 110 | Self starter over hauling amoucha, field, bush sollow night switch with cost of parts |
| 111 | Self carbon & bush set change with cost of parts |
| 112 | Alternator over hauling cutout, slding armouchar, Carbon, field, bush with cost of parts |
| 113 | L/c hitch pin with spring complete new making fitting with cost of parts |
| 114 | troley painting charges with cost of material |
| 115 | Trolly rubber seal fixing inside of the body and chassis with cost of material |
| 116 | Trolly complete floor M.S. sheet change after cutting and welding with coost of mterial |