Water Supply Work Maintenance And Repair To Mini Power Pump In Ward No 17 To 33 In Theni - Allinagaram Municipality-4 sqm 3 core copper cable 2 10 sqm 3 core copper cable 3 40 mm dia HDPEHose pipe(4Kg/sqm) 4 32 mmdia GI hex nipple 5 32 mm GI pipe 6 32 mmdia GM NRV 7 32 mmdia GI union 8 32mm dia GI Elbow 9 32mm dia GI Tee 10 32mm dia GI Coupling 11 20mm dia CI Tap 12 12 mmdia nylon rope 13 40mm dia PVC pipe 14 40mm dia PVC Coupler 15 40mm dia PVC Elbow 16 40mm dia PVC Bend 17 40mm dia PVC Tee 18 32mm dia GI pipe kitty 19 Bore cover 20 32mm dia GM Gate valve 21 1.0HP Impeller 22 1.5HP Impeller 23 1.0HP Pump bush 24 1.5HP Pump bush 25 1.0HP Body bush 26 1.5HP Body bush 27 1.0HP Shaft 28 1.5HP Shaft 29 150MFD Condensor 30 50MFD Condensor 31 Service charge Submercible motor and lathe work charge including fixing of thrust bearing, fixing of motor body using packing paste with required labour etc complete 1.0HP Submercible motor 32 Service charge Submercible motor and lathe work charge including fixing of thrust bearing, fixing of motor body using packing paste with required labour etc complete 1.5HP Submercible motor 33 Rotary alignment charges for Submercible motor and lathe work charge including checking, labour cost, supporting tools etc compelte 1.0HP Submercible motor 34 Rotary alignment charges for Submercible motor and lathe work charge including checking, labour cost, supporting tools etc compelte 1.5HP Submercible motor 35 Panel board service charges for Submercible motor (single phase ) including checking, labour cost, supporting tools, equipments etc compelte 1.0HP Submercible motor 36 Panel board service charges for Submercible motor (single phase ) including checking, labour cost, supporting tools, equipments etc compelte 1.5HP Submercible motor 37 Labour charges for the Removal of submersible pumpset from borewell/openwell including removing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and removal from panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete 1.0HP Submercible motor 38 Labour charges for the Removal of submersible pumpset from borewell/openwell including removing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and removal from panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete 1.5HP Submercible motor 39 Rewinding the following motors including new coils, deduction of old coils, labour cost, conveyance cost, loading, unloading cost, lathe work, necessary suporting tools, equipments and all other cost and conveyance etc, complete 1.0HP Submercible motor 40 Rewinding the following motors including new coils, deduction of old coils, labour cost, conveyance cost, loading, unloading cost, lathe work, necessary suporting tools, equipments and all other cost and conveyance etc, complete 1.5HP Submercible motor 41 Labour charges for the erection of submersible pumpset in borewell/openwell including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset 1.0HP Submercible motor 42 Labour charges for the erection of submersible pumpset in borewell/openwell including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset 1.5HP Submercible motor