| 1 | Safe carriage loading unloading with proper stacking of following materialfrom ESC Daliganj to JE dump store. |
| 2 | 11KV3X70/120 SQ MM XLPE CABLE |
| 3 | LT XLPE Cable 1x240 sqmm |
| 4 | LT ABC (3x95+1x70+1x16) Sqmm |
| 5 | 11 KV Jointing Kit |
| 6 | 11/0.4 KV 250 KVA T/F |
| 7 | 3 Phase DO Fuse Set |
| 8 | Other material 100 KG aprox |
| 9 | Safe carriage loading unloading with proper stacking of following materialfrom JE dump store to work site. |
| 10 | 11KV3X70/120 SQ MM XLPE CABLE |
| 11 | LT XLPE Cable 1x240 sqmm |
| 12 | LT ABC (3x95+1x70+1x16) Sqmm |
| 13 | 11 KV Jointing Kit |
| 14 | 11/0.4 KV 250 KVA T/F |
| 15 | 3 Phase DO Fuse Set |
| 16 | Other material 100 KG aprox |
| 17 | Removal of existing 25 KVA T/F, HT connections, jimper, leads, fencing, etc |
| 18 | Laying of LT PVC Cable 1x240/3.5x400 Sqmm |
| 19 | Laying of 11 KV XLPE cable 3x185 mm2 in single circuit underground as per digging of eatth pit of size 0.60x0.90 with provision of sand filling and cover with side bric ans top with stone pad (11 KV XLPE cable will be provided by deprt) |
| 20 | Construction of plinth for 250 KVA as per apvoved drawing (All material will be provided by contractor) |
| 21 | Erection and commissioning of Aerial Bunched Conductor (3x120+1x95+1x16) Sq. mm including mounting of clamps and connectors required for completion of work (Only ABC will be provided by the department). |
| 22 | Supply, installation, testing & commissioning of LT fuse unit set of distribution T/F (11/0.4 KV) of rating 500 amp, 650 volt for LT laod bifercation |
| 23 | Supply, installation, testing & commission of copper busbar (750x50x6mm) for LT fuse unit set of distribution T/F (11/0.4 KV) of rating 500 amp, 650 volt for LT laod bifercation |
| 24 | Supply & fixing of iron angle frame with heavy grouting/plinth for installation of LT fuse unit set of DT (11/0.4 KV) |
| 25 | Construction of pipe earthing with GI pipe calss 40mm diameter 60 ft long proper jointing each pipe and welding with dressing of LT service cable and properly connected with SMC box |
| 26 | Earthing strip |
| 27 | Nit bolt |
| 28 | Borewell |
| 29 | Welding work |
| 30 | Other accessories |
| 31 | Hoisting of 11KVXLPE cable3x185 sq mm |
| 32 | Erection and commissioning of 11/0.4 KV 250 KVA T/F von constructed plinth and connecting with system including completion of termination/jointing kits testing of its and etc complete in all respect, crimping of lugs l-piece and connection copper bus bar 750x50x6mm (All material will be arrange by contractor at their own cost) |
| 33 | Making and installation on fuse unit 500 amp 650 volt completer set and connection will |
| 34 | Removed 25 KVA T/F and loading, unloading and carriage from site dump store center daliganj |
| 35 | Construction of T/F plinth of size 2x2x1.5 m on a padding 0.25M deep in ground 1:5:10 cemend sand and brick ballast on the top of padding brick work Ist class brick of 0.95 mtr hight & 0.35 mtr wall will be constructed. Rest wall should be 0.23 mtr thick. brick work in ratio 1:4 cement & cores Sand in the hollow portion the sand should be fiilled from the ground level up to 15 centimeter below from the top of wall, Cement, sand & brick Ballasts should be filled up to 15 centimeter. Two no. of channel 100x50 in length 1500mm will be grouded.0.35 CM.RCC will be done with cores sand, cement and stone ballast in the ratio of 1:2:4.The t/fs plinth should be plastered on all sides 12mm thick in ratio 1:6 by cement and cores sand. (All the material will be arranged by the contractor .) |
| 36 | Making/construction fencing complete with material |
| 37 | Making/construction fuse unit complete with material |
| 38 | Stringing,Sagging,winding and jumpering of LT line with AB Cable (3x120+1x95+1x16) conductor as per RESSPO Norms. (AB Cable provided by deptt and balance material like holding clamp, eye hook, suspension clamp and dead end clamp arranged by contractor .) |
| 39 | Fixing of 11 KV DO set on 11 mt ST pole structure (except DO set, other all material and clamp will be provided by the contractor) |
| 40 | Fixing clamp and tightening nut and bolt |
| 41 | Boring type earthing of 11/0.4 KV 250 KVA Distribution T/F by boring and lowering of 20 M deep or upto water level 1.5” dia B Class Jindal make GI Pipe its connection in between transformer and boring with G.I. Strip of size 50x6 mm(All the material, labour and T&P will be arranged by the contractor) |
| 42 | All taxess as applicable shall be paid time to time extra |