|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation 5 trenches or drains including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil. All Kinds of soil including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. The rate includes octroi, Malkhana Toll tax, Goods and Service Tax building and other construction worter, welfare cesss royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. |
| 2 | Providing and laying cement concrete 1:4:8 (One cement isto four sand isto eight graded crushed stone aggregate 40mm. (Forty millimetre) nominal size) and curing complete including cost of centring and shuttering work in open foundations complete as per drawing and technical specification including carriage of materials, within all leads lifts and other incidentals as per direction of Engineer-in-Charge. The rate includes, octroi Malkhana, Toll tax, Goods and Service Tax building and other construction worter, welfare cesss royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. |
| 3 | Providing and laying in cement concrete 1:3:6 (one cement isto three sand isto six graded crushed stone agg. 20 mm. (Twenty millimetre) nominal size) curing complete and including cost of centring and shuttering work in retaining walls, breast walls, as per drawing and technical specifications. including carriage of material in all leads lifts other incidentals as per the direction of Engineer-in-Charge. The rate includes, octroi, Malkhana, Toll tax, Goods and Service Tax building and other construction worter, welfare cesss royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. |
| 4 | Providing and laying in cement concrete 1:5:10 (one cement isto five sand isto ten graded crushed 5 stone agg. 40 mm. (Forty millimetre) nominal size) curing complete and including cost of centring and shuttering work in retaining walls, breast walls, as per drawing and technical specifications. including carriage of material in all leads lifts other incidentals as per the direction of Engineer-in-Charge. The rate includes, octroi Malkhana, Toll tax, Goods and Service Tax building and other construction worter, welfare cesss royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. |
| 5 | Providing and laying reinforced cement concrete pipe NP2 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection work, back filling, concrete and masonary work in head walls and parapets clause 1108 in 900 mm (Nine Hundred millimetre) including carriage of materials, within all leads lifts and other incidentals as per direction of Engineer-in-Charge The rate includes, octroi, Malkhana, Toll tax, Goods and Service Tax building and other construction worter, welfare cesss royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. |
| 6 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Granular material including carriage of material in all leads lifts other incidentals as per the direction of Engineer-in-Charge. The rate includes, octroi, Malkhana, Toll tax, Goods and Service Tax building and other construction worter, welfare cesss royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. |
| 7 | Providing weep holes in brick masonary /stone masonary, plain /reinforced concrete abutment wing wall return wall with 100 mm. dia PVC pipe enterding through full of width of the structure with slope of (V): 20(H) towards drawing face complete as per HPPWD specification including carriage of material in all leads lifts other incidentals as per the direction of Engineer-in-Charge. The rate includes, octroi Malkhana, Toll tax, Goods and Service Tax building and other construction worter, welfare cesss royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. |