| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrockrequiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum |
| 2 | Supplying and filling in foundation andbasement with filling stone dust in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification. |
| 3 | Plain cement concrete of mix 1 : 4 : 8 ( one cement , Four sand and Eight aggregates ) using 40 mm ISS HBG metal for foundation and flooring, including , dewatering, if found necessary, and laid in layers of not more than 15 cm thick, well rammed and consolidated, including cost and conveyance of all materials and labour charges for mixing, laying, compacting and curing etc. completed as per standard specification and as directed by departmental officials |
| 4 | Supplying and erecting for drain centering Using mild steel sheets of size 90 cm X 60 cm and 10 gauge, stiffened withmild steel angle of size 25 mm X 25 mm X 3 mm for boarding, supported by silver oak joists of size 10 X 6.5 cm, spaced at about 90 cm centre to centre and supported by casuarinas props of 10 cm to 13 cm dia spaced at 75 cm centre to centre complete, complying with standard specifications and as directed. |
| 5 | Culvertslab |
| 6 | Plain cement concrete of mix 1:2:4 ( One cement , Two M-sand and Four aregates ) using 20 mm ISS HBG metal for foundation and flooring, including , dewatering, if found necessary, and laid in layers of not more than 15 cm thick, well rammed and consolidated, including cost and conveyance of all materials and labour charges for mixing, laying, compacting and curing etc. completed as per standard specification and as directed by departmental officials |
| 7 | Providing granolithic floor finish of 25mm thickness with plain cement concrete 1:2:4 (One Cement, Two crushed sand (M-Sand) and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panellingwherever necessary and as directed by the departmental officers) |
| 8 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - |
| 9 | Suppling and fabricating and placing in position MS(or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost ofsteel and binding wire also in all floors. |
| 10 | Manufacturing, supplying and fixing in position plain cement concrete precast kerb slab of sizein Cement Concrete M20 using 20mm HBG stone jelly excluding reinforcement including cost of moulding charges, casting of slab, finishing, curing, fixing and pointing the slab with CM 1:3 (One Cement and Three Sand) to full depth of slab etc., complete complying with standard specification and as directed (100mm thick) |
| 11 | Goods and Service Tax @ 18% |