| 1 | 1.Repairs to the Library Building at Annamangalam Pt. Pointing with cement mortar 1:3 to full depth of tilesusingcrudeoil 10% by weight of cementincluding cost and conveyance of all materials to site and all labour charges etc complete |
| 2 | Earth work in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of50 m, dressing of si |
| 3 | Collection and supply of M.sandand filling in to the basement including cost and including cost and conveyance of all materialsto site andall labours etc., complete |
| 4 | P.C.C 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyance to site and all labour charges etc ., complete. |
| 5 | C.C.1:2:4 mix using 20mm ISS HBG Metal including cost and conveyance of all materialsto site and all labours etc complete.. |
| 6 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x43/8\"x23/4\" and conveyance of all materials to site and all labour charges etc complete |
| 7 | Painting two coats over OLD or NEW Plastered surface using Approved Quality of Exterior EmulsionPaintincluding cost and all Labour charges |
| 8 | Painting two coats forNEW IRON Worksusing ready mixed Enamel Paint over Red Oxide including cost and all Labour charges etc., complete |
| 9 | Painting two coats over Old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., withbest approved best quality of synthetic enamel paint of approved color over the existing priming coat etc., complete complying with standard specifications and as directed by the departmental officers. |
| 10 | Supplying and erection centering for sides and soffits inculding necessary supports and structingfor plain surfaces such as RCC Slab,Lintel,Below ground level |
| 11 | suppluing fitting and placing HYSD bar reinfourcement (Fe 415) in super structure complete as per drawing and technical specification as per clause 1002,1010 and 1202 for MORD |
| 12 | Providing plain reinforced concrete in CM 1:11/2:3 using 20mm HBG metal including cost conveyance of all labour charges etc completed |
| 13 | Towards cost and supply of following PVC pipes & Specials 110mm PVC Pipe |
| 14 | 110mm PVC Elbow |
| 15 | Towards labour charges for repairs to the Steel door and window inculding of all chaerges |
| 16 | Provision for Name Board |
| 17 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |