| 1 | :DEPOSIT WORKFOR SHIFTING HT/LINE ALONG KOTOOR RAMAMANGALAM ROAD IN FAVOUR OF THE EE,PIU,PMGSY,EKM |
| 2 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). |
| 3 | Providing Transformer fencing , using 50x50x6mm Angle iron, 40 x 6 mm MS flat and 8 mm MS rod as specified, incl cost of transportation & foundation |
| 4 | Mounting the cable ends of all sizes upto and incl. 3x300 sq mm with special type cable clamps incl. cost of extra materials if needed and giving necessary connections. |
| 5 | Erecting one 25kVA Transformer to existing DP and giving connections, incl. loading & unloading, excluding transportation. |
| 6 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. |
| 7 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. |
| 8 | Fitting one set (3No.) 11kV LA and giving connections excluding earthing. |
| 9 | Additional rate for providing one disc set on any type of HT pole for making cut point. |
| 10 | Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. |
| 11 | Fitting and erecting one HT DP using A type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. |
| 12 | Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit. |
| 13 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits. |
| 14 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary. |
| 15 | Fitting and erecting one HT PSC DP, fitting all accessories (2 stays, 8 cross arms, AB, DO, LA etc.), mounting of 100kVA Transformer, fixing DB, DTR box and giving all HT & LT connections. |
| 16 | Dismantling and re-fitting (without damage) existing Transformer fencing , incl cost of foundation |
| 17 | Dismantling earthing from transformer station in DP structure |
| 18 | Providing one Driven Earth using GI earth pipe at standard distance away from the pole/structure in loose soil. |
| 19 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. |
| 20 | Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 21 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 22 | Fitting one Additional V cross arm in existing single pole incl. conveyance of materials. |
| 23 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. |
| 24 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. |
| 25 | Fitting one LT 4 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line. |
| 26 | Fitting one set AB switch and giving connection |
| 27 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 28 | Dismantling (without damage) LT stay incl. digging pit in all classes of soil and backfilling |
| 29 | Dismantling one damaged LT TW/RSJ/Rail Strut pole incl. removal of clamps and stacking. |
| 30 | Dismantling (without damage) one LT PSC/RCC Strut pole incl. removal of clamps and stacking. |
| 31 | Dismantling one LT 4 line cross arm from existing pole. |
| 32 | Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
| 33 | Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
| 34 | Dismantling one section fuse |
| 35 | Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
| 36 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. |
| 37 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. |
| 38 | Erecting one LT PSC Pole in position incl. digging & back filling pit. |
| 39 | Providing Stay for LT poles incl. digging & back filling pit. |
| 40 | Providing Strut using LT PSC pole incl. digging & back filling pit. |
| 41 | Providing Fly stay for LT pole using LT PSC pole incl. digging & back filling pit. |
| 42 | Stringing one km LT Sph 2 wire line (Rabbit) incl. fitting cross arm etc. removing touchings and conveyance of materials. |
| 43 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc. |
| 44 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting. |
| 45 | Stringing one km LT 3ph 4 wire line (Rabbit for Ph, Weasel for N) incl. fitting cross arm etc. removing touchings and conveyance of materials. |
| 46 | Excavation of cable trench for maintenance of cable in all classes of soil and backfilling after laying of cable (excluding laying of cable) |
| 47 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 48 | Dismantling (without damage) one 11kV A type pole after disconnecting stays, strut etc. and stacking the same. |
| 49 | Dismantling (without damage) one HT PSC/RCC Strut pole incl. removal of clamps and stacking. |
| 50 | Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking. |
| 51 | Dismantling (without damage) one HT stay incl. back filling, and bringing back to section store. |
| 52 | Dismantling one V cross arm/Channel cross arm from existing Pole, and bringing back to section store. |
| 53 | Dismantling one Channel cross arm from existing DP structure, and bringing back to section store. |
| 54 | Dismantling transformer station in DP structure excluding the rate of dismantling earthing |
| 55 | Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 56 | Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 57 | Fitting one set (3No.) 11kV DO Fuse and giving connection. |
| 58 | Dismantling (without damage) one AB switch from existing structure and bringing back to section store. |