Name of Work: Improvement Of Lane By Interlocking Tiles From New Life Church Lane Malin Basti Chhapeda Puliya Ward-86 Under Zone-6
Sl. No.
Item Description
1
Dismantaling of old Interlocking tiles including mat all complete.
2
Earth work in excavation in trenches for foundation pipe cable etc in ordinary soil (Loan clay or sand)including lift up to 1.5 m. lead up to 50m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer i/c within a lead of 50m.
3
Laying of base concrete 1:6:12 with cement C.Sand & 40mm Brick ballast including mat.Lab.T&P,etc all complete.) Providing and laying in cement concrete in 1:6:12 (1 cement: 6 fine sand: 12 graded brick aggregate 40 mm. nominal size) and curing complete, including cost of formwork in foundation and floors.
4
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement in position to the required line, level and curvature jointed with cement mortar 1:3(1 cement: 3 coarse sand) including making joints with or without grooves (thickness of joints except at sharp curve shall not to more them 5 mm )including making drainage opening wherever required complete etc.as per direction of Engineer-in-charge(length of finished kerb enging shall be measured for payment) (Precast C.C kerb stone shall be approved by Engineer-in-charge).
5
R.C.C works with cement approved coarse sand and 2 cm (3/4\") gauge approved stone ballast in the proportion 1:2:4 (1 cement:6 aggregate) in lintels of doors and windows excluding supply of reinforcement and its bending the same with 24 BWG binding wire and necessary centring and shuttering etc. and also including supply of all materials labours and tools and plants etc. required for proper completion of work. stone ballast but for slab including shuttering mat. Lab etc. All complete
6
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not include in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authrized overlapping shall be measured up to floor two level(over all Rate)12 mm to 32 mm. tor etc.all complete.
7
construction of gsb granular sub base by providing well graded material spreding in uniform layers with mortar grader on prepared surface complete as per mort&h etc all complete
8
P/L of 80 mm thick rubber mould interlocking tiles incl mat all complete
9
p/L of cement concrete 1:2:4 cement & c sand incl mat all complete.
10
cartage of earth upto 3km including loading and unloading incl mat all complete.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.