|
| 1 | Dismantling of burner assembly of CHS and remvoing of side cover and repairing the same by removing the old burnt fire refractory cement plastering, replastering the same as per existing with fire refractory cement for boiler capacity 3-4 lakh kilo/cal/hr and complete servicing the boiler by removing the complete carbon/oil deposits with suitable coil shine chemical including repair to coil assembly by welding if there is any leakages found or any other repair required at site and reassembling/ testing the same, (4 Months after again service) complete all as specified and directed by Engr-in Charge. |
| 2 | Dismantling of burner assembly of CHS and remvoing of side cover and repairing the same by removing the old burnt fire refractory cement plastering, replastering the same as per existing with fire refractory cement for boiler capacity 1-2 lakh kilo/cal/hr and complete servicing the boiler by removing the complete carbon/oil deposits with suitable coil shine chemical including repir to coil assembly by welding if there is any leakage found or any other repair required at site and reassembling/ testing the same,(4 Months after again service) complete all as specified and directed by Engr-in Charge. |
| 3 | Supply only controller digital TC513A/TC513AX/TC533AX 85 to 270 Volt AC/DC 50/60 Hz 5 VA type/ (DTC 304-2) with sensor suitable for 3-4 lakh kilo/Cal/hr & Oil fired incinator incl burner rod assembly (As per sample), complete all as specified and directed by Engr in Charge. |
| 4 | Supply only photo cell as per existing suitable for 3-4 lakh kilo/Cal/hr burner rod assembly, complete all as specified and directed by Engr in Charge. |
| 5 | Supply only burner nozzle suitable for 3-4 lakh K/Cal/Hr complete all as specified and directed by Engr in charge. |
| 6 | Supply only Electrode suitable for burner of capacity 3-4 lakhK/Cal/Hr complete all as specified and directed by Engr in charge. |
| 7 | Supply only sequence controller suitable for 3-4 lakh kilo/hr with burner rod assembly, complete all as specified and directedby Engr in Charge. |
| 8 | Supply only ignition rod suitable for 3-4lakh kilo/Cal/hr burner rod assembly, complete all as specified and directedby Engr in Charge. |
| 9 | Supply only sequence controller suitable for 1-2 lakh kilo/hr with burner rod assembly, complete all as specified and directedby Engr in Charge. |
| 10 | Supply only ignition rod suitable for 1-2lakh kilo/Cal/hr burner rod assembly, complete all as specified and directedby Engr in Charge. |
| 11 | Supply only ignition Transformer electronic type suitable for 1-2 lakh kilo/Cal/hr burner rod assembly, complete all as specified and directedby Engr in Charge. |
| 12 | Supply only controller digital TC513A/TC513AX/TC533AX 85 to 270 Volt AC/DC 50/60 Hz 5 VAtype DTC 503 with sensor suitable for 1/2 lakh kilo/Cal/hr LAL 2.25 burner rod assembly, complete all as specified and directedby Engr in Charge. |
| 13 | Supply only photo cell as per existing suitable for 1-2 lakh kilo/Cal/hr burner rod assembly, complete all as specified and directedby Engr in Charge. |
| 14 | Supply only burner nozzle suitable for 1-2 lakh K/Cal/Hr complete all as specified and directedby Engr in Charge. |
| 15 | Supply only Electrode suitable for burner of capacity 1-2 lakh K/Cal/Hr complete all as specified and directedby Engr in Charge. |
| 16 | Material and Labour for Servicing of Air Handling Unit capacity 26000 CFMincluding repair to coil assy by welding if there is any leakage found and testing the same, replacement bearings of motor capacity 7.5 HP/10HP, reassembling/ testing the same including painting of AHU with two coats of aluminium paint over a coat of red oxide primer and cleaning of AHU room complete all as specified and directed by Engr-in-Charge. |
| 17 | Labour only for attending of break down/day to day complaint or call on attending any break down or maint work in CHS located in GH OTM,FSH and \"C\" Mess and MTF checking the serviceability of fan coil unit of any capacity for having continuous sreviceabilityof FCU for any number of time as desired by Engr-in-Charge including replacement ofminor spare part like Gasket, Teflon tape, flare nut, tightening of any loose glycol line connections, shifting FCU from one place to another place if required, heating up thefreezed glycol line any where about the premices to have continuous flow of glycol fluid, repairing the insulation ofpipe line of any size by providing shallow tape / GI wire as deemed fit, for fastening the insulation with pipe line, stopping any kind of leakage from any size of pipe line, tightening the loose electrical connections as related with FCU / Heating system, cleaning the air filter including radiator of FCU to the entire satisfaction of Engineer-in- Charge complete all as directed at site. |
| 18 | Supply only pressure gauage 0 to 20 Kg/cm sq as per existing,complete all as specified anddirected by Engineer-in-Charge. |
| 19 | Supply only Bridge rectifier complete all as specified and directed by Engr in Charge. |
| 20 | Supply only hooter round type complete all as specified and directed by Engr in Charge. |
| 21 | Supply only thermostate assembly tail type as per existing suitable for 0 to 30 degree centrigrade temperature, complete all as specified and directed by Engr in Charge. |
| 22 | Supply only exhaust pipe by welding, complete all as specified and directed by Engr-in-Charge. |
| 23 | Supply only auto air pressure valve 3/8\" as per existing, complete all as specified and directedby Engr in Charge. |
| 24 | Supply only high pressure fuel pipe 1.5 mtr as per existing, complete all as specified and directed by Engr in Charge. |
| 25 | Material and labour for taking down and re-fixing the same afterrewinding of electric motor 3 phase 415 volts of capacity 7.5/10 HP with superior quality super enameled copper winding wire of appropriate size and gauge as per existing including varnishing, cotton tape, PVC sleeves etc., complete all as specified and directed by Engr-in-Charge. |
| 26 | Material and labour for taking down and re-fixing the same after rewinding of electric motor 3 phase 415 volts of capacity 5.0 HP with superior quality super enameled copper winding wire of appropriate size and gauge as existing including varnishing, cotton tape, PVC sleeves etc., complete all as specified and directed by Engr-in-Charge. |
| 27 | Material and labour for taking down and re-fixing the same after rewinding of electric motor 3 phase 415 volts of capacity 3.0 HP with superior quality super enameled copper winding wire of appropriate size and gauge as existing including varnishing, cotton tape, PVC sleeves etc, complete all as specified and directed by Engr-in-Charge. |
| 28 | Material and labour for taking down and re-fixing the same afterrewinding of electric motorsingle phase 240 volts of capacity 1-2 HP with superior quality super enameled copper winding wire of appropriate size and gauge as per existing including varnishing, cotton tape, PVC sleeves etc, complete all as specified and directed by Engr-in-Charge. |
| 29 | Supply only bearing of capacity 7.5 HP monoblock motor (as per sample) complete all as specified and directed by Engr-in-charge |
| 30 | Supply only SS impeller of capacity 7.5 HP monoblock motor (as per sample) complete all as specified and directed by Engr-in-charge |
| 31 | Supply only mechanical seal for monoblock motor of capacity 7.5 HP (as per sample) complete all as specified and directed by Engr-in-Charge. |
| 32 | Supply only tail end cooling fan for monoblock motor of capacity 7.5 HP non metalic (as per sample) complete all as specified and directed by Engr-in-Charge. |
| 33 | Supply only base frame for monoblock motor of capacity 7.5 HP (as per sample) complete all as specified and directed by Engr-in-Charge. |
| 34 | Supply only pump sleeve for monoblock motor of capacity 7.5 HP (as per sample) complete all as specified and directed by Engr-in-Charge. |
| 35 | Supply only bearing of capacity 5 HP monoblock motor (as per sample) complete all as specified and directed by Engr-in-charge. |
| 36 | Supply only SS impeller of capacity 5 HP monoblock motor (as per sample) complete all as specified and directed by Engr-in-charge. |
| 37 | Supply only mechanical seal for monoblock motor of capacity 5 HP (as per sample) complete all as specified and directed by Engr-in-Charge. |
| 38 | Supply only tail end cooling fan for monoblock motor of capacity 5 HP non metalic (as per sample) complete all as specified and directed by Engr-in-Charge. |
| 39 | Supply only base frame for monoblock motor of capacity 5 HP (as per sample) complete all as specified and directed by Engr-in-Charge. |
| 40 | Supply only pump sleeve for monoblock motor of capacity 5 HP (as per sample) complete all as specified and directed by Engr-in-Charge. |
| 41 | Supply only bearing of capacity 3 HP monoblock motor (as per sample) complete all as specified and directed by Engr-in-charge by Engr-in-Charge. |
| 42 | Material and Labour for replacement of SS impeller of capacity 3 HP monoblock motor (as per sample) complete all as specified and directed by Engr-in-charge. |
| 43 | Supply only mechanical seal for monoblock motor of capacity 3 HP (as per sample) complete all as specified and directed by Engr-in-Charge. |
| 44 | Supply only tail end cooling fan for monoblock motor of capacity 3 HP non metallic (as per sample) complete all as specified and directed by Engr-in-Charge. |
| 45 | Supply only base frame for monoblock motor of capacity 3 HP (as per sample) complete all as specified and directed by Engr-in-Charge. |
| 46 | Supply only pump sleeve for monoblock motor of capacity 3 HP (as per sample) complete all as specified and directed by Engr-in-Charge. |
| 47 | Material and Labour for servicing to the glycol pump and motor of capacity 3.0 HP, 2870 RPM including replacement of bearings, oil seals or any other spares / work required for smooth functioining of pump, complete all as specified and directedby Engr in Charge. |
| 48 | Material and Labour for servicing to the glycol pump and motor of capacity5.0 HP, 2870 RPM including replacement of bearings, oil seals or any other spares / work required for smooth functioining of pump, complete all as specified and directedby Engr in Charge. |
| 49 | Material and Labour for disconnecting the all connection in existing panel board complete and re-fixing the same after removing the burnt lugs/thimbles complete including replacing the U/S MCCBS, Contactors, relay, bus bar indicator lamps etc., all as specified and as direcrted by Engr-in-Charge.Note- MCCBS, Contactors, relay, indicator lamps, S/Switchs, voltmeter, Ammeter are to be measured and paid seperately. |
| 50 | Supply only diesel flexible pipe of size 25 mm for glycol pump complete all as specified and directed by Engr-in-Charge. |
| 51 | Supply only contactor type 3 TF 33, 415 volts complete all as specified and directed by Engr-in-Charge.Make- Siemens/ L & T/ Havells. |
| 52 | Supply only contactor type ML 1.5, 220 volts, complete all as speified and directed by Engr-in-Charge.Make- Siemens/ L & T/ Havells. |
| 53 | Supply only over load relay 8 to 12.5 Amps for contactor matching ser No 49 series 3 TF 33 complete all as specified and directed by Engr-in-Charge. Make- Siemens/ L & T/ Havells. |
| 54 | Supply only over load relay 1.25 to 2 Amps for contactor matching ser no 49 series 3 TF 33complete all as specified and directed by Engr-in-Charge. Make- Siemens/ L & T/ Havells. |
| 55 | Supply only digital type volt meter0-500 volts,complete all as specified and directed by Engr-in-Charge. |
| 56 | Supply only digital type Amp meter complete with suitable CTs 0-300 Amps, complete all as specified and directed by Engr-in-Charge. |
| 57 | Supply only indicating lamps RYB as per existing complete all as specified and directed by Engr-in-Charge. |
| 58 | Supply only rotary type ON/OFF switches, 22mm dia as per existing, complete all as specified and directed by Engr-in-Charge. |
| 59 | Supply only push button switch in RED or GREEN colours, 22mm dia as per existing, complete all as specified and directed by Engr-in-Charge. |
| 60 | Supply only selector switch for volt meter 3 phase 2-5 KW 10 amp switch as per sample complete all as specified and directed by Engr-in-Charge. |
| 61 | Supply and fix MCCB with current rating160 Amps 415 V 4 Pole 36 KA with thermally adjustable complete all as specified and as directed by Engr-in-Charge. Make L&T/Havells /Standard. |
| 62 | Supply and fix MCCBwith current rating200 Amps 415 V 4 Pole 36 KA with thermally adjustable complete all as specified and as directed by Engr-in-Charge. Make L&T/Havells /Standard. |
| 63 | Supply and fix MCCB with current rating100 Amps fixed type415 V 3 Pole 16 KAcomplete all as specified and as directed by Engr-in-Charge. Make L&T/Havells /Standard. |
| 64 | Supply only PVC flexible copper multistrandwire 3 core of 6 sqmm as per existing, complete all as specified and directed by Engr-in-Charge. |
| 65 | Supply only PVC flexible copper multistrandwire 3 core of 4 sqmm as per existing, complete all as specified and directed by Engr-in-Charge. |
| 66 | Material and Labour for Insulation of M S Pipe with PUF slab 40 mm thick with and including applying bituminuous compound and GI cladding with 26 gauge GI sheet complete of size of 80 mm dia of pipe, complete all as specified and directed by Engr in Charge. |
| 67 | Material and Labour for Insulation of M S Pipe with PUF slab 30 mm thick with and including applying bituminuous compound and GI cladding with 26 gauge GI sheet complete of size of 50 mm dia of pipe, complete all as specified and directed by Engr in Charge. |
| 68 | Material and Labour for welding the leakage portion of MS pipe line including all T&P andmaterials required for welding the pipe line of size 25 mm to 200 mm including testing on full pressure complete all as specified and directed by Engr in Charge. |
| 69 | Supply and fixing in replacement of gun metal butter fly control valves of 65 mm bore as per existing, complete all as specified and directed complete all as specified and directed by Engr in Charge. |
| 70 | Supply and fixing in replacement of gun metal butter fly control valves of 80 mm bore as per existing, complete all as specified and directed complete all as specified and directed by Engr in Charge. |
| 71 | Supply and fixing in replacement of gun metal butter fly control valves of 50 mm bore as per existing, complete all as specified and directed complete all as specified and directed by Engr in Charge. |
| 72 | Supply and fixing in replacement of gun metal butter fly control valves of 40mm bore as per existing, complete all as specified and directed complete all as specified and directed by Engr in Charge. |
| 73 | Supply and replcement of MS pipe (ERW) heavy duty including fittings complete of size 100 mm dia complete all as specified and directed by Engr in Charge.(Note- The rate include cutting to any levels/shapes like elbows,teesbends etc welding joints wherever necessary as per the site requirement) |
| 74 | Supply and replcement of MS pipe (ERW) heavy duty including fittings complete of size 80 mm dia complete all as specified and directed by Engr in Charge.(Note- The rate include cutting to any levels/shapes like elbows, tee bends etc welding joints wherever necessary as per the site requirement) |
| 75 | Supply and replcement of MSpipe (ERW) heavy duty including fittings complete of size 50 mm diacomplete all as specified and directed by Engr in Charge. (Note- The rate include cutting to any levels/shapes like elbows, tee bends etc welding joints wherever necessary as per the site requirement) |
| 76 | Supply and replcement of MSpipe (ERW) heavy duty including fittings complete of size 40 mm diacomplete all as specified and directed by Engr in Charge. (Note- The rate include cutting to any levels/shapes like elbows, tee bends etc welding joints wherever necessary as per the site requirement) |
| 77 | Supply and replcement of MSpipe (ERW) heavy duty including fittings complete of size 25 mm diacomplete all as specified and directed by Engr in Charge. (Note- The rate include cutting to any levels/shapes like elbows, tee bends etc welding joints wherever necessary as per the site requirement) |
| 78 | Supply and replcement of MSpipe (ERW) heavy duty including fittings complete of size 20 mm diacomplete all as specified and directed by Engr in Charge. (Note- The rate include cutting to any levels/shapes like elbows, tee bends etc welding joints wherever necessary as per the site requirement) |
| 79 | Supply and fixing inreplacement of FCU connection flexible pipe 20/16 mm as per existing, complete all as specified and directed by Engr in Charge. |
| 80 | Supply and fixing inreplacement of FCU connection copper pipe 20/16 mm with check nut at both side as per reqd length, complete all as specified and directedby Engr in Charge. |
| 81 | Supply and fix switch socket combination of 5 Amp flush type complete all as specified and directed by Engr in Charge. |
| 82 | Supply and fixing in replacement of plug top 3 pin of capacity 5Amp complete all as specified and directed by Engr in Charge. |
| 83 | Material and Labour for Electrical Control Wiring for FCU of any sizeincluding electronic display complete as per sample all as specified and directedby Engr in Charge. |
| 84 | Dismantling the existing radiator unit of capacity from 3000 to 6500 K Cal per hour, taking it to nearest workshop cleaning the complete unit with coil shine chemical, detecting the leakage protion by applying nitrogen gas pressure, brazing the leakage protion, refixing the same unit from dismantled location including testing on load complete all as directed at site by Engineer-in- Charge. |
| 85 | Supply and fixing radiator unit of FCU including connecting with the unit and making it leak proof of consisting of copper coils covered with aluminium finishedas per existing size of capacity 3000K Cal / Hour including dismantling the existing unserviceable. |
| 86 | Supply and fixing radiator unit of FCU including connecting with the unit and making it leak proof of consisting of copper coils covered with aluminium finished as per existing size of capacity 4500 K Cal / Hour including dismantling the existing unserviceable. |
| 87 | Supply and fixing radiator unit of FCU including connecting with the unit and making it leak proof of consisting of copper coils covered with aluminium finsingas per existing size of capacity 6000 K Cal / Hour including dismantling the existing unserviceable. |
| 88 | Supply and fix in replacement of needle valve 3/8 inch BSP as per existing complete all as specified and directedby Engr in Charge. |
| 89 | Supply and fixing in replacement of ring \"O\" Clip of flexible pipe of existing size complete all as specified and directed by Engr in Charge. |
| 90 | Supply and fix Inlet/outlet forged brass ball valve 20 mm with Y stainer for FCU, hot water for 25 to 90 degree temperature as per existing, including supply and fixing of GI nipple of size 3/4 inch including welding work cutting the existing rusty unserviceable MS/GI nipple complete including taking out existing unserviceable valve complete all as specified and directed. |
| 91 | Supply and fix Inlet/outlet forged brass ball valve 15 mm with Y stainer for FCU, hot water for 25 to 90 degree temperature as per existing, including supply and fixing of GI nipple of size 3/4 inch including welding work cutting the existing rusty unserviceable MS/GI nipple complete including taking out existing unserviceable valve complete all as specified and directed. |
| 92 | Supply and fix in replacement of fan Coil unit of capacity 3000 Cal/Hr with mounting arrangement on wall including all connected accessoriescomplete all as specified and directed by Engr-in-charge |
| 93 | Supply and fix in replacement of fan Coil unit of capacity 4500 Cal/Hr with mounting arrangement on wall including all connected accessories complete all as specified and directed by Engr-in-charge |
| 94 | Supply and fixing in replacement of Oil Pressure pump 7276-3D67A Complete all as specified and directed by Engr-in-Charge |
| 95 | Supply and fixing in Repair/Replacement of fan coil unit parts, dual shaft electric motor of capacity 30 Watt 930 RPM, 3 speed as per existing complete all as specified and directed by Engr-in-Charge |
| 96 | Supply and replacement of PP-R pipe with fitting of 40 mm dia complete all as specified and directed by Engr-in-Charge |
| 97 | Supply and replacement of PP-R pipe with fitting of 32 mm dia complete all as specified and directed by Engr-in-Charge |
| 98 | Supply and replacement of PP-R pipe with fitting of 25 mm dia complete all as specified and directed by Engr-in-Charge |
| 99 | Supply and replacement of PP-R pipe with fitting of 20 mm dia complete all as specified and directed by Engr-in-Charge |
| 100 | Excavating in trenches not exceeding 1.5 m wide and not exceeding 1.5min depth for foundation , laying of pipes , cables etc. or for manholes pier holes poles not exceeding 10 sqm on plan and not exceeding 1.5 m in depth and getting out in hard /dense soil complete all as specified and directed by engr in Charge.Note: Excavation for rectifying the Leakage for CHS Pipe of any dia . |
| 101 | Returning filling in soilincluding spreading levelling watering and well ramming in layers not exc. 25 cm thick complete all as specified and directed by Engr in Charge. |
| 102 | Removing excavated soil to a distance not exceeding50 m and depositing where directed at a level not exceeding 1.5 above the starting point including spreading and levelling complete all as specified and directed by Engr in Charge. |
| 103 | Supply and fixing in replacement Temp controller regulator type complete (as per sample) all as specified and directed by Engr-in-Charge |
| 104 | Supply and fixing in replacement of lagging all around with 150mm thick sections bonded material wool of density 144 Kg/cum conforming to IS 9842 for heating circulation pipe lines 150 MM over chicken wire mess complete all as specified and directed by Engr-in-Charge Note: Retrived glass wool to be disposed off by the contractor |
| 105 | Supply and fixing in replacement of lagging all around with 100mm thick sections bonded material wool of density 144 Kg/cum conforming to IS 9842 for heating circulation pipe lines 100 MM over chicken wire mess complete all as specified and directed by Engr-in-Charge Note: Retrived glass wool to be disposed off by the contractor |
| 106 | Supply and fixing in replacement of lagging all around with 80mm thick sections bonded material wool of density 144 Kg/cum conforming to IS 9842 for heating circulation pipe lines 80 MM over chicken wire mess complete all as specified and directed by Engr-in-Charge Note: Retrived glass wool to be disposed off by the contractor |
| 107 | Supply and fixing in replacement of lagging all around with 65 mm thick sections bonded material wool of density 144 Kg/cum conforming to IS 9842 for heating circulation pipe lines 65 MM over chicken wire mess complete all as specified and directed by Engr-in-Charge Note: Retrived glass wool to be disposed off by the contractor. |
| 108 | Supply and fixing in replacement of lagging all around with 50/40 mm thick sections bonded material wool of density 144 Kg/cum conforming to IS 9842 for heating circulation pipe lines 50/40 MM over chicken wire mess complete all as specified and directed by Engr-in-Charge Note: Retrived glass wool to be disposed off by the contractor |
| 109 | Material and Labour for Galvanised IronPipe Medium grade of size 50 mm dia complete with all fitting and fixed complete to walls and ceillings or laid in floors complete all as specified and directed by engr in Charge. |
| 110 | Material and Labour for Galvanised IronPipe Medium grade of size 40 mm dia complete with all fitting and fixed complete to walls and ceillings or laid in floors complete all as specified and directed by engr in Charge. |
| 111 | Material and Labour for Galvanised IronPipe Medium grade of size 25 mm dia complete with all fitting and fixed complete to walls and ceillings or laid in floors complete all as specified and directed by engr in Charge. |
| 112 | Material and Labour for Galvanised IronPipe Medium grade of size 20 mm dia complete with all fitting and fixed complete to walls and ceillings or laid in floors complete all as specified and directed by engr in Charge. |
| 113 | Supply and fixing in replacement of complete burner assembly including all connected accessories suitable for 1-2 lakh kilo/Cal/hr including installation,testing & commissioning (as per Sample) complete all as specified and directedby Engr in Charge. |
| 114 | Supply and fixing in replacement of complete burner assembly including all connected accessories suitable for 3-4 lakh kilo/Cal/hr including installation,testing & commissioning (as per Sample) complete all as specified and directedby Engr in Charge. |
| 115 | Supply and fixing in replacement of ignition transformer electronic type suitable for 3-4 lakh kilo/Cal/hr burner rod assembly, complete all as specified and directedby Engr in Charge. |
| 116 | Supply and fixing and replacement of chilled/hot water fan coil unit (FCU) vertical type floor mounting 2.5 TR capacity complete all as specfied and directed by Engr-in-charge. Make: Carrier/Zeco or equivalent ISI marked |
| 117 | Supply and fixing and replacement of chilled/hot water fan coil unit (FCU) wall mounting 2.0 TR capacity complete all as specfied and directed by Engr-in-charge. Make: Carrier/Zeco or equivalent ISI marked |
| 118 | Supply and fixing and replacement of wall mounted (ECO Panel) convector heater 2.5 KW/Hrs two heat out put set up with auto control and LED temperture display. Dimension - width 1200 mm, height 450 mm ,depth 90mm with complete fixing accessories. (Note : Old U/S converter heater to be deposited in MES store Yard |
| 119 | Supply and laying cable XLPE Insulated screened PVC bedded galvanized steel strip or wire armored, electric power cables (heavy duty) 11000 Volts grade with standed aluminium conductor of following sizes 95 sqmm3.5 Core laid in trenches or passing through pipes ducts or fixed to walls/polesincluding taking down old cable complete all as specified and directed.Make : Cable corporation of India/Havells India Ltd/Universal Cables Ltd/ Polycab/RPG Cables/Gloster/KEI |
| 120 | Supply and laying cable XLPE Insulated screened PVC bedded galvanized steel strip or wire armored, electric power cables (heavy duty) 11000 Volts grade with standed aluminium conductor of following sizes 120 sqmm3.5 Core laid in trenches or passing through pipes ducts or fixed to walls/polesincluding taking down old cable complete all as specified and directed.Make : Cable corporation of India/Havells India Ltd/Universal Cables Ltd/ Polycab/RPG Cables/Gloster/KEI |
| 121 | Supply, connection and testing of thermal heater wires on water supply pipe lines (GI/MS/PPR) for heating of water through minimum 25 Watt per meter in spiral/ straight line shape above outer diameter of pipe with aluminium tape insulation to preserve heat, fiber glass layer, second layer of aluminium tap to hold fiber glass by glass wool minimum 40mm thick with essential tapes, complete all as specified and directed by Engr-in-Charge. |
| 122 | Material and Labour for Cleaning of MS diesel storage tanks (day to day tank) of capacity up to1000 ltrs by removing of sludge from tanks and scrapping the side walls by means of wire brush or emery paper and wash the same with castic soda and clear water and painting the internal wall with two coats of black rubber emulsion paint and painting the complete tankwith two coats of synthetic enamel paint, complete all as specified and directed by Engr-in-Charge. |
| 123 | Material and Labour for Cleaning of MS diesel storage tanks of capacity up to10000 ltrs by removing of sludge from tanks and scrapping the side walls by means of wire brush or emery paper and wash the same with castic soda and clear water and painting the internal wall with two coats of black rubber emulsion paint and painting the complete tankwith two coats of synthetic enamel paint, complete all as specified and directed by Engr-in-Charge. |
| 124 | Material and Labour for Cleaning of MS over head circulation tank of capacity 1000 ltrs of all type of T&P and chemical reqd the same , including welding work to lekage surface including opeaning and refixing the existing insulating material to the externalal surface including painting the complete tank from out side with two coats of synthetic enamel paint, complete all as specified and directed by Engr-in-Charge. |