| 1 | I. IN MARINE LOADING AT BD - I Charges for replacement of defective Inboard arm hydraulic cylinder Assembly as detailed in Schedule - A.(Cylinder assembly will be provided by ChPA) |
| 2 | Outboard arm hydraulic cylinder Assembly as detailed in Schedule - A. (Cylinder assembly will be provided by ChPA) |
| 3 | Charges for replacement of defective slew hydraulic cylinder assembly as detailed in Schedule - A. (Cylinder assembly will be provided by ChPA) |
| 4 | QCDC Coupler Hydraulic cylinder assembly as detailed in Schedule - A. (Cylinder assembly will be provided by ChPA) |
| 5 | Charges for replacement of defective Apex swivel joint seal as detailed in Schedule - A. (Seal kit will be provided by ChPA) |
| 6 | Charges for replacement of defective swivel joint seal at the Base/Fulcrum area as detailed in Schedule - A. (Seal kit will be provided by ChPA) |
| 7 | Charges for replacement of defective triple swivel joint seals as detailed in Schedule - A (Seal kit will be provided by ChPA) |
| 8 | Charges for replacement of defective free wheel control valves(F/C valve) as detailed in Schedule - A. (Control valve will be provided by ChPA) |
| 9 | Charges for Repairing/Reconditioning of defective Inboard and outboard arm hydraulic cylinder assembly as detailed in Schedule - A. Reconditioning of the cylinder without piston and cylinder refurbishment work. |
| 10 | Reconditioning of the cylinder with piston and cylinder refurbishment work. |
| 11 | Charges for Repairing/Reconditioning of defective slew & QCDC coupler hydraulic cylinder assembly as detailed in Schedule - A.Reconditioning of the cylinder without piston and cylinder refurbishment work. |
| 12 | Reconditioning of the cylinder with piston and cylinder refurbishment work. |
| 13 | Charges for Repairing/Reconditioning of slew lock Mechanism as detailed in Schedule - A. |
| 14 | II. IN MARINE LOADING AT BD - IIICharges for replacement of defective Inboard arm Double acting Hydraulic cylinder assembly as detailed in Schedule - A.(Cylinder assembly will be provided by ChPA) |
| 15 | Outboard arm Double acting Hydraulic cylinder assembly as detailed in Schedule - A. (Cylinder assembly will be provided by ChPA). |
| 16 | Slew hydraulic Double acting cylinder assembly as detailed in Schedule - A. (Cylinder assembly will be provided by ChPA). |
| 17 | Charges for replacement of defective swivel joint seal at Style 40 (Apex area) as detailed in Schedule - A. (Seal kit will be provided by ChPA). |
| 18 | Charges for replacement of defective swivel joint seal at Style 50 (Base Raiser & Trunnion area) as detailed in Schedule - A. (Seal kit will be provided by ChPA). |
| 19 | Charges for Replacement of defective triple swivel joint seals/swivel joint at Style 80 as detailed in Schedule - A. (Seal kit will be provided by ChPA). |
| 20 | Charges for Replacement of defective Outboard arm wire ropes (Size: 1\" Ø) as detailed in Schedule - A. (Wire rope will be provided by ChPA). |
| 21 | Charges for Replacement of defective Inboard arm wire ropes (size: 1-1/4\" Ø) as detaied in Schedule - A.(Wire rope will be provided by ChPA). |
| 22 | Charges for Repairing/Reconditioning of defective Inboard arm, outboard arm & Slew Double acting hydraulic cylinder assembly as detailed in Schedule - A. Reconditioning of the cylinder without piston and cylinder refurbishment work. |
| 23 | Reconditioning of the cylinder with piston and cylinder refurbishment work. |
| 24 | Charges for Repairing/Reconditioning of Hydraulic distributor block valve assembly at QCDC Area as detailed in Schedule - A. |
| 25 | Charges for supply of New screw shaft for QCDC jaw as per drawing at Annexure-I and instruction MOC:EN8 as detailed in Schedule - A. |
| 26 | Charges for replacement of Additional counter weight guide square channel and adjustment screw as detailed in Schedule - A. |
| 27 | Charges for replacement of Inboard arm locking arrangement as detailed in Schedule - A. |
| 28 | Charges for strengthening the balancing sheave rim and Ribs as detailed in Schedule - A. Top Balancing Sheave. |
| 29 | Bottom Balancing Sheave. |
| 30 | III. COMMON WORKS IN BD - I & BD - IIICharges for replacement of defective SS316L hydraulic pipes of size 12/18 mm Ø in Horizontal and vertical direction with adaptors, clamps, brackets, etc., as detailed in Schedule - A. Horizontal direction. |
| 31 | Vertical direction. |
| 32 | Charges for repairing of defective SS316L hydraulic pipes of size 12/18mm Ø by welding/bracing in Horizontal and vertical direction with adaptors, clamps, brackets, etc., as detailed in Schedule - A. Horizontal direction. |
| 33 | Vertical direction. |
| 34 | Charges for replacement of defective gate valves sizes 12\"/14\"/16\"/20\" with supply of valves as detailed in Schedule - A.12\" gate valve. |
| 35 | 14\" gate valve. |
| 36 | 16\" gate valve. |
| 37 | 20\" gate valve. |
| 38 | Charges for replacement of defective actuator with gate valve sizes 12\"/16\"/20\" with suplly of valves as detailed in Schedule - A.12\" Actuator with gate valve. |
| 39 | 16\" Actuator with gate valve. |
| 40 | 20\" Actuator with gate valve. |
| 41 | Charges for replacement of defective gate valves/Actuator type valves sizes 12\"/14\"/16\"/20\" without supply of valves. (required valves shall be supplied by ChPA) as detailed in Schedule - A.12\" gate valve. |
| 42 | 14\" gate valve. |
| 43 | 16\" gate valve. |
| 44 | 20\" gate valve. |
| 45 | Charges for overhauling and reconditioning of defective Actuator Type Gate valves sizes 12\"/14\"/16\"/20\" as detailed in Schedule - A. |
| 46 | Charges for replacement of defective slop tank pump sets as detailed in Schedule - A. Pump set will be supplied by the ChPA. |
| 47 | Charges for repairing/Replacement of defective pressure gauge fixing pipe line with the main line as detailed in Schedule - A. |
| 48 | Charges for Calibration of pressure gauges in oil/firefighting pipe lines to be carried out once in a year to the required pressure and certificate to be issued from a reputed test Centre.(Qty - 10 Nos.) as detailed in Schedule - A. |
| 49 | Charges for ultrasonic thickness Calibration of 4 (four) oil pipe line wall thickness (42\" crude line, 20/14\" white oil line & 14\" Black oil line) once in a year at every 6 Meters intervals throughout its length from BD-III to IOC FST and detailed report to be submitted as detailed in Schedule - A. |
| 50 | Charges for Hydrostatic pressure testing of oil pipe lines as detailed in Schedule - A. |
| 51 | Charges for cleaning, sludge removal and external painting of slop tank at BD-I and BD-III as detailed in Schedule - A. |
| 52 | Charges for replacement of I\" dia rod of length 800mm, MOC:SS from BD-III to New Pump House in Trestle first tier support below 42\" dia crude oil pipe line as detailed inSchedule - A. |
| 53 | Charges for Re-alignment of dislocated supports in between BD-III to BD-I Trestle second tier support below oil/fire fighting pipe lines (4 Nos. of 14\"/16\" dia pipe) as detailed in Schedule - A. |
| 54 | Charges for Removal and replacement of damaged/corroded pipe support rails in between NPH to BD-III as detailed in Schedule - A.(required Rails will be supplied by ChPA). |
| 55 | Charges for painting of oil dock installations as detailed in Schedule - A. |
| 56 | Charges for replacement of 4\" dia drain pipe line from loading arm to slop tank with all required flanges, gaskets, fasteners, etc., as detailed in Schedule - A. |
| 57 | Charges for replacement of 2\" dia flanged Ball valve in the drain pipe line with all required flanges, gaskets, fasteners, etc., as detailed in Schedule - A. |
| 58 | Charges for replacement of 4\" dia Gate valve in the drain pipe line with all required flanges, gaskets, fasteners, etc., as detailed in Schedule - A. |
| 59 | Charges for Reconditioning of slop gear pump of discharge capacity 250 LPM as detailed in Schedule - A. |
| 60 | Charges for replacement of Analog type Level gauge in BD-I/BD-III slop tank as detailed in Schedule - A(Drawing enclosed at Annexure - III) |
| 61 | Charges for calibration of the given portable type multi gas detector as detailed in Schedule - A. |
| 62 | Charges for attending minor leakages in marine loading arms by applying metal putty, FRP and painting as detailed in Schedule - A.Apex Area (Height 60 to 70 ft) |
| 63 | Centre column Area (Height 15 to 20 ft) |
| 64 | Triple swivel Area |
| 65 | b) Installation |