| 1 | Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15M. lead and disposal of unserviceable materials with all leads all complete as per direction of E/l. |
| 2 | Dismantling plain cement or lime concrete work including stacking servicable material incountable stack with in 15 m. lead and disposal of unservicable material. |
| 3 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M. Including all lifts, levelling, ramming the foudation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/l. |
| 4 | Providing coarse clean sand in filling In foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including\" cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement complacted volume). |
| 5 | Providing designation 75 B one brick flat soling joints filled with local sand Including cost of watering taxes royalty all complete as per building specification and direction of E/I. |
| 6 | Provide and lying in position cement concrete of a specified grade excluding cost of centreing and shuttering - all work upto plinth level.P.C.CM-100 with nominal mix of1:3:6 (1 cement: 3 course sand(zone 3): 6 graded stone of 40mm nominal size |
| 7 | Provide and lying in position cement concrete of a specified grade excluding cost of centreing and shuttering - all work upto plinth level.P.C.CM-100 with nominal mix of1:1.5:3 (1 cement: 1.5 course sand(zone 3): 3 graded stone of 20 mm nominal size |
| 8 | P/v and lying in position 1:1.5:3 grade of reinforced cement concrete cement ,excluding the cost of centering,shuttering, finishing the reinforcement all work up to plinth level. |
| 9 | Providing 12mm cement plaster (1:3) with 1.5 MM Cement punning clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. |
| 10 | Providing tor steel reinforcement of 8 mm.10 mm diabars as per as per approved design and drawing TMT Fe 500 (only valid for tata tiscon,SAIL,JSPL Electrosteel steels Ltd Bokaro and VUAG (RINL)8mm Dia bar |
| 11 | 10mm dia bar |
| 12 | Centering shuttering Including strutting, propping and removal for foundation, footing, basess of column, etc for mass concrete. |
| 13 | Stone metal (lead 30 km ) |
| 14 | Cement +steel (lead3km ) |
| 15 | Sand( lead 5 km ) |
| 16 | Stone chips (lead 30 km ) |
| 17 | Bricks(lead 8 km) |
| 18 | Signboard and photography |
| 19 | ADD GST 18% |
| 20 | ADD 1% LABOUR CESS |