Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | JAHANGIR CHOWK MUKHIYA CHOWK PASWAN TOLA |
| 2 | Setting Out Pillars Providing & Fixing of Working benchmark Pillars 2 nos. per km& 6 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I |
| 3 | Clearing and Grubbing Road Land (By manual means)including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees ofgirth upto 300mm, removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification clause 201.1 and direction of E/I |
| 4 | Box CuttingExcavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 |
| 5 | Construction of embankment with approved material deposited from road way cutting and excavation from drain and foundation of other structures and excavated with an average lead of 50 m graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5(Including Royality & Labour Cess). |
| 6 | Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m & 100 m as per Technical Specification Clause 301.5 .(Including Royality & Labour Cess).For 1000 m lead @ 20 % |
| 7 | For 100 m lead @ 80% |
| 8 | Construction of Subgrade and Earthen ShouldersConstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m & 100 m as per Technical Specification Clause 303.1.(Including Royality & Labour Cess). |
| 9 | Granular Sub-base with Well Graded Material (Table 400.1)(By mix in place method) For Grading II MaterialConstruction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401. |
| 10 | Wet Mix MacadamProviding, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing thematerial with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, layingin uniform layers in sub-base/base course on a well prepared sub-base and compacting with smoothwheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. |
| 11 | Cement Concrete Pavement (PQC)Construction of un-reinforced, plain cement concrete pavement (M35 Grade) over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form paver, spread, compacted and finished in a continuous operation including provision of 0.5 x 0.5 panel, joint filler, separation membrane, sealant primer, joint sealant, debonding strip as approved, curing compound, finishing to lines and grades as per drawing. |
| 12 | Hard ShoulderingLaying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing the same with threewheel road roller 80-100 kN as per Technical Specification Clause 412 |
| 13 | Kilometre stone Reinforced cement concrete M15 grade kilometre local stone of standard design asper IRC:8 fixing in position including painting and printing , etc as per drawing and technical specification clause 1703.ii) Km stone |
| 14 | iii) 200 m stone |
| 15 | Retro-reflectorised Traffic SignsProviding and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as perdrawings and Technical Specification Clause 801600 mm equilateral & triangle, (Left Hand, Right Hand Curve & School Board)600 mm equilateral & triangle, |
| 16 | 900 mm side octagon, OR |
| 17 | 600 mm x 450 mm rectangular, |
| 18 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Concrete SurfaceProviding and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. Sealing primer may be applied in advance which is incidentally Included to the work. |
| 19 | (I)Providing and Fixing \"Logo\" of MMGSY AWSHESHProject Providing and fixing of typical MMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges.The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level.The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube.All M.S. will be stove enameled on both sides.Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour.All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 |
| 20 | At Edge in CC Portion |
| 21 | Add L.C. @ 1% |
| 22 | Add Seigniorage Fee @ 10% on Material Cost only |
| 23 | Add GST @ 18% |
| 24 | 1st Year Maintenance |
| 25 | 2nd Year Maintenance |
| 26 | 3rd Year Maintenance |
| 27 | 4th Year Maintenance |
| 28 | 5th Year Maintenance |
| 29 | 6th Year Maintenance |
| 30 | Add L.C. @ 1% |
| 31 | Add Seigniorage Fee @ 10% on Material Cost only |
| 32 | Add GST @ 18% |
| 33 | TARIQ ASALAM HOUSE RAM PRIT MAHTO HOUSE |
| 34 | Setting Out Pillars Providing & Fixing of Working benchmark Pillars 2 nos. per km& 6 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I |
| 35 | Clearing and Grubbing Road Land (By manual means)including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees ofgirth upto 300mm, removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification clause 201.1 and direction of E/I |
| 36 | Box CuttingExcavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 |
| 37 | Construction of embankment with approved material deposited from road way cutting and excavation from drain and foundation of other structures and excavated with an average lead of 50 m graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5(Including Royality & Labour Cess). |
| 38 | Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m & 100 m as per Technical Specification Clause 301.5 .(Including Royality & Labour Cess).For 1000 m lead @ 20 % |
| 39 | For 100 m lead @ 80% |
| 40 | Construction of Subgrade and Earthen ShouldersConstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m & 100 m as per Technical Specification Clause 303.1.(Including Royality & Labour Cess). |
| 41 | Granular Sub-base with Well Graded Material (Table 400.1)(By mix in place method) For Grading II MaterialConstruction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401. |
| 42 | Wet Mix MacadamProviding, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing thematerial with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, layingin uniform layers in sub-base/base course on a well prepared sub-base and compacting with smoothwheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. |
| 43 | Cement Concrete Pavement (PQC)Construction of un-reinforced, plain cement concrete pavement (M35 Grade) over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form paver, spread, compacted and finished in a continuous operation including provision of 0.5 x 0.5 panel, joint filler, separation membrane, sealant primer, joint sealant, debonding strip as approved, curing compound, finishing to lines and grades as per drawing. |
| 44 | Hard ShoulderingLaying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing the same with threewheel road roller 80-100 kN as per Technical Specification Clause 412 |
| 45 | Kilometre stone Reinforced cement concrete M15 grade kilometre local stone of standard design asper IRC:8 fixing in position including painting and printing , etc as per drawing and technical specification clause 1703.ii) Km stone |
| 46 | iii) 200 m stone |
| 47 | Retro-reflectorised Traffic SignsProviding and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as perdrawings and Technical Specification Clause 801600 mm equilateral & triangle, (Left Hand, Right Hand Curve & School Board)600 mm equilateral & triangle, |
| 48 | 900 mm side octagon, OR |
| 49 | 600 mm x 450 mm rectangular, |
| 50 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Concrete SurfaceProviding and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. Sealing primer may be applied in advance which is incidentally Included to the work. |
| 51 | (I)Providing and Fixing \"Logo\" of MMGSY AWSHESHProject Providing and fixing of typical MMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges.The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level.The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube.All M.S. will be stove enameled on both sides.Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour.All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 |
| 52 | At Edge in CC Portion |
| 53 | HPC 1X1000 MMEarth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104 |
| 54 | Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 |
| 55 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 ( M20 ) |
| 56 | Providing and laying RCC pipe NP-3 for culverts on first class bedding of PCC M10 material in single row including fixing collar with cement mortar 1:2 but excluding excavation,protection works,backfilling concrete and masonary works in head walls and parapets as per clause 1106 |
| 57 | Painting on Parapet Wall (Black & White Strips) Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701 |
| 58 | BOX CULVERT (2.0 X 2.0)Earth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104 |
| 59 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC M-15 Grade |
| 60 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC M-20 Grade |
| 61 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 PCC M-20 Grade |
| 62 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 |
| 63 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 RCC M-25 Grade |
| 64 | Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 |
| 65 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8(With Sandy Materials ) |
| 66 | Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smallersize towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specificationClause 1204.3.8 |
| 67 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 RCC M-25 Grade |
| 68 | Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 |
| 69 | Parapet Construction Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 ( M20 ) |
| 70 | Painting on Parapet Wall Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701 |
| 71 | Drainage spouts complete as per drawing and technical specifications Clause 1209 |
| 72 | BOX CULVERT (3.0 X 3.0)Earth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104 |
| 73 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC M-15 Grade |
| 74 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC M-20 Grade |
| 75 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 PCC M-20 Grade |
| 76 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 |
| 77 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 RCC M-25 Grade |
| 78 | Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 |
| 79 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8(With Sandy Materials ) |
| 80 | Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smallersize towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specificationClause 1204.3.8 |
| 81 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 RCC M-25 Grade |
| 82 | Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 |
| 83 | Parapet Construction Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 ( M20 ) |
| 84 | Painting on Parapet Wall Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701 |
| 85 | Drainage spouts complete as per drawing and technical specifications Clause 1209 |
| 86 | Add L.C. @ 1% |
| 87 | Add Seigniorage Fee @ 10% on Material Cost only |
| 88 | Add GST @ 18% |
| 89 | 1st Year Maintenance |
| 90 | 2nd Year Maintenance |
| 91 | 3rd Year Maintenance |
| 92 | 4th Year Maintenance |
| 93 | 5th Year Maintenance |
| 94 | 6th Year Maintenance |
| 95 | Add L.C. @ 1% |
| 96 | Add Seigniorage Fee @ 10% on Material Cost only |
| 97 | Add GST @ 18% |
| 98 | MANOHAR PASWAN HOUSE MOHAN RAI |
| 99 | Setting Out Pillars Providing & Fixing of Working benchmark Pillars 2 nos. per km& 6 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I |
| 100 | Clearing and Grubbing Road Land (By manual means)including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees ofgirth upto 300mm, removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification clause 201.1 and direction of E/I |
| 101 | Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately |
| 102 | Construction of embankment with approved material deposited from road way cutting and excavation from drain and foundation of other structures and excavated with an average lead of 50 m graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5(Including Royality & Labour Cess). |
| 103 | Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m & 100 m as per Technical Specification Clause 301.5 .(Including Royality & Labour Cess).For 1000 m lead @ 20 % |
| 104 | For 100 m lead @ 80% |
| 105 | Construction of Subgrade and Earthen ShouldersConstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m & 100 m as per Technical Specification Clause 303.1.(Including Royality & Labour Cess). |
| 106 | Granular Sub-base with Well Graded Material (Table 400.1)(By mix in place method) For Grading II MaterialConstruction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401. |
| 107 | Wet Mix MacadamProviding, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing thematerial with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, layingin uniform layers in sub-base/base course on a well prepared sub-base and compacting with smoothwheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. |
| 108 | Cement Concrete Pavement (PQC)Construction of un-reinforced, plain cement concrete pavement (M35 Grade) over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form paver, spread, compacted and finished in a continuous operation including provision of 0.5 x 0.5 panel, joint filler, separation membrane, sealant primer, joint sealant, debonding strip as approved, curing compound, finishing to lines and grades as per drawing. |
| 109 | Hard ShoulderingLaying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing the same with threewheel road roller 80-100 kN as per Technical Specification Clause 412 |
| 110 | Cable Duct Across the Road Providing and laying of a reinforced cement concrete pipe duct,300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills,constructing head walls at both ends, providing a minimum fill ofgranular material over top and sides of RCC pipe as per IRC:981997,bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. |
| 111 | Kilometre stone Reinforced cement concrete M15 grade kilometre local stone of standard design asper IRC:8 fixing in position including painting and printing , etc as per drawing and technical specification clause 1703.ii) Km stone |
| 112 | iii) 200 m stone |
| 113 | Retro-reflectorised Traffic SignsProviding and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as perdrawings and Technical Specification Clause 801600 mm equilateral & triangle, (Left Hand, Right Hand Curve & School Board)600 mm equilateral & triangle, |
| 114 | 900 mm side octagon, OR |
| 115 | 600 mm x 450 mm rectangular, |
| 116 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Concrete SurfaceProviding and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. Sealing primer may be applied in advance which is incidentally Included to the work. |
| 117 | (I)Providing and Fixing \"Logo\" of MMGSY AWSHESHProject Providing and fixing of typical MMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges.The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level.The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube.All M.S. will be stove enameled on both sides.Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour.All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 |
| 118 | At Edge in CC Portion |
| 119 | HPC 1X1000 MMEarth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104 |
| 120 | Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 |
| 121 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 ( M20 ) |
| 122 | Providing and laying RCC pipe NP-3 for culverts on first class bedding of PCC M10 material in single row including fixing collar with cement mortar 1:2 but excluding excavation,protection works,backfilling concrete and masonary works in head walls and parapets as per clause 1106 |
| 123 | Painting on Parapet Wall (Black & White Strips) Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701 |
| 124 | BOX CULVERT (3.0 X 3.0)Earth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104 |
| 125 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC M-15 Grade |
| 126 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC M-20 Grade |
| 127 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 PCC M-20 Grade |
| 128 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 |
| 129 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 RCC M-25 Grade |
| 130 | Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 |
| 131 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8(With Sandy Materials ) |
| 132 | Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smallersize towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specificationClause 1204.3.8 |
| 133 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 RCC M-25 Grade |
| 134 | Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 |
| 135 | Parapet Construction Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 ( M20 ) |
| 136 | Painting on Parapet Wall Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701 |
| 137 | Drainage spouts complete as per drawing and technical specifications Clause 1209 |
| 138 | Add L.C. @ 1% |
| 139 | Add Seigniorage Fee @ 10% on Material Cost only |
| 140 | Add GST @ 18% |
| 141 | 1st Year Maintenance |
| 142 | 2nd Year Maintenance |
| 143 | 3rd Year Maintenance |
| 144 | 4th Year Maintenance |
| 145 | 5th Year Maintenance |
| 146 | 6th Year Maintenance |
| 147 | Add L.C. @ 1% |
| 148 | Add Seigniorage Fee @ 10% on Material Cost only |
| 149 | Add GST @ 18% |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail