| 1 | 1.Periodical renewal BT of Road From MRL21-Veppanapalli Theertham road to Chinna Thammandrapalli (via) Thimmasandiram km 1/770-3/270 -Rs.28.300 Lakhs |
| 2 | Providing andapplying Tack coat over BT Surface (not treated with primer) using 2.50KG of bitumen 60/70 for 10sqm area including cost and conveyance of Bituminous binder including labour charges for preparing the surface and applying the required quantiy of bitumen as tack coat |
| 3 | km 1/77-2/0 |
| 4 | km 2/0-3/0 |
| 5 | km 3/0-3/27 |
| 6 | BITUMINOUS CONCRETE 25, 30/40 MMTHICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 |
| 7 | km 1/77-2/0 |
| 8 | km 2/0-3/0 |
| 9 | km 3/0-3/27 |
| 10 | Provision for HM stone |
| 11 | Provision for KM stone |
| 12 | Road marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on bituminous surface |
| 13 | Provision for Sign Board |
| 14 | Provision for Painting Citizen Information Board |
| 15 | Provision for Painting Informatory Name Board |
| 16 | Maintenance |
| 17 | For 1st year maintenance |
| 18 | For 2nd year maintenance |
| 19 | For 3rd year maintenance |
| 20 | For 4th year maintenance |
| 21 | For 5th year maintenance |
| 22 | 2.Periodical renewal BT of Road From MRL20-Neralagiri to Kasiriganapalli (via) Kottaiyur,Gollapalli km 0/0-1/350 - Rs.25.520 Lakhs |
| 23 | Providing andapplying Tack coat over BT Surface (not treated with primer) using 2.50KG of bitumen 60/70 for 10sqm area including cost and conveyance of Bituminous binder including labour charges for preparing the surface and applying the required quantiy of bitumen as tack coat |
| 24 | km 0/0-1/0 |
| 25 | km 1/0-1/350 |
| 26 | BITUMINOUS CONCRETE 25, 30/40 MMTHICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 |
| 27 | km 0/0-1/0 |
| 28 | km 1/0-1/350 |
| 29 | Provision for HM stone |
| 30 | Provision for KM stone |
| 31 | Road marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on bituminous surface |
| 32 | Provision for Sign Board |
| 33 | Provision for Painting Citizen Information Board |
| 34 | Provision for Painting Informatory Name Board |
| 35 | Maintenance |
| 36 | For 1st year maintenance |
| 37 | For 2nd year maintenance |
| 38 | For 3rd year maintenance |
| 39 | For 4th year maintenance |
| 40 | For 5th year maintenance |
| 41 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |