| 1 | M&L for complete removal and cleaning of Construction/Contraction (Dummy) joints of width 08-12 mm & depth 25 mm by cutting and using mechanical equipment to remove loose dust, dirt or grease & repair to joints by applying suitable primer, inserting the backup rod of dia 12 mm, fixing masking tape of neoprine & sealing the joints with Polyurethane sealent to match with the existing colour and surface to give neat finish properly to obtain aneven and smoth surface complete, including removal the unserviceable materials from site to outside MOD land complete all as specified and as directed by Engineer-in-Charge. |
| 2 | M&L for complete removal and cleaning of Expansion joints of width 25 to 30 mm & depth 50 mm by cutting and using mechanical equipment to remove loose dust, dirt or grease & repair to joints by applying suitable primer, inserting the backup rod of dia 30 mm, fixing masking tape of neoprine & sealing the joint with Polyurethane sealent to match with the existing colour and surface to give neat finish properly to obtain aneven and smooth surface complete including removal of unserviceable materials from site to outside MoD land complete all as specified and as directed. |
| 3 | M&L for providing and laying self leveling elasto-meric concrete in any depth and any width as required for repair to cracks, corner spawling, pot holes, damaged edges of construction/dummy/expansion joints of cement concrete pavement/ slabs of Runway/ Taxi-track as required and finishing by means of trowels and flats alongwith application of a coat of special primer for elastomeric concrete after preparation of surface by removal of all loose material by disc cutter or by chiselling and cleaning by using air blower including all consumable materials, tools, labour etc including removal of all the spoils/ loose materials from site to outside MoD land complete all as specified and directed by Engr-in-Charge. |
| 4 | M&L for preparation of existing concrete surfaces and applying 5mm thick epoxy polyurethane system including cleaning of surface from dust, dirt, moisture & all foreign materials from the floor. All floors to be cleared by means of scrubber.Acid itching shall be done to the floor followed by alkaline wash & then the surface shall be cleaned by potable water wash. After that the floor shall be cleaned by using solvent/degrease cleaner to remove residues for floor cleaning all mechanized equipment shall be used like scrubber, sanders, hot blowers, vaccum cleaners, moisture test machine complete all as specified and as directed by Engr-in-Charge. Note:- Screed, Primer & Top coat shall be measured and paid separately under subsequent items of BOQ. |
| 5 | M&L for epoxy based self leveling screed having a minimum thickness of 3800 microns.The self leveling screed shall consist of a low viscous epoxy-amine cured system and graded aggregates.The epoxy system shall have a volumetric ratio of mixing of resin in (2:1) ratio.The aggregates shall be added in the ratio of (1:3) or (1:3:5).The screed shall have compressive strength of minimum 70 N/Sqmm.The layer shall be desecrated by spike roller to dislodge air pockets complete all as specified and as directed by Engr-in-Charge. |
| 6 | M&L for applying primer of two component, solvent-free, epoxy-polymido amine system having a volumetric ratio of mixing of 2:1.Mixing resin and hardener by weight shall not be allowed.The primer shall be applied @ coverage of 5 Sqm per litre, yielding a DFT of 200 microns complete all as specified and as directed. |
| 7 | M&L for applying EPU based self levelling top coat.The top coat shall be of EPU type where urethane linkages are infused in to epoxy matrix, so as to enhance wear resistance, flexibility and impact resistance.EPU top coat shall have a volumetric ratio of mixing of (2:1).No filler or aggregates are added in the top coat shall have a volumetric ratio of mixing of (2:1). No filler or aggregates shall be added in the top coat at the site, as the addition of fillers will reduce the flexibility. It should yield a thickness of 1000 microns.The volumetric mixing ratio will be (2:1).The compressive strength of the top coat shall be in the range of 60-70 MPa, Tensile strength will be 15-20 MPa, Elongation in the range of 45-50% and flexural strength in the range of 40-50 MPa.Top coat wear resistance (weight loss)/ Abraission Resistance<37 mg complete all as specified and as directed by Engr-in-Charge. |
| 8 | M&L for adequate number of coats painting lines, dashes, letters etc on road, pavements andthelike exceeding 10cm wide with road marking paint white / yellow/ black / red / orange or any colour required at site complete all as specified and as directed. |
| 9 | M&L for PQC/RCC core cutting of 152mm dia and depth upto 200mm for Mooring points and providing 20mm mild steel U-shpe bar including installation, drilling, grouting / filling with use of material RE-500V4 HILTI including tool use with core cutting drill 25mm and 16mm machine to be use for the cutting of PQC/RCC to furnish the cutting pieces, dismantling with HILTI Machine and removing excavated material from the site to outside MoD land complete all as specified and as directed. |
| 10 | M&L for one coat of Reflective road marking paint of superior make with ready mixed material guide line RM 164 paint road marking conforming to IS:164 with a DFT of 100 microns on bituminus surface / concrete by using Air less spray machine with white / yellow / black / red/ orange or any colour required at site by user on Taxiway/ Dispersalmarking exceeding 10 Cm width or girth as per recommended dimensions and line should be straight to give taxi guidance to the aircraft.The existing surfaces shall be cleaned by air compressor and scraping throughly with broom or iron brush for removal of dirt, dust, oil greases etc before application of the paint. Specification of the machine is as under :- Graco line lazer 3900 with 2 guns and the maximum GPM (LPM): 1.60(6.0) , PSI (Bar) :3300(227) , Engine CC (hp): 120cc and maximum tip size :0.029 complete as specified and diectedby Engr-In-Charge. Note for Item No 1 to 4:- (a) Work shall be carried out by the approved applicator of Manufacturer. The manufacturer shall be approved by the GE. (b) Contractor shall produce original purchase voucher to Engineer-in-charge for verification. |
| 11 | De-silting including cleaning of grass, vegetation growth etc including area drainage of any description from drain of size n exc 1 mtr width at top and depth not exc 0.40 mtr including removal of debris from site to outside MoD land complete all as specified and as directed. |