Part I -Strengthening to the Road From Sethurastha road to sea show road (via) Mariyamman kovil km 0/0 -1/700(R-193) Part II-Strengthening to the Road From Sethuratha - Gandhi nagar (via) resankadai vadamalai puram street Km 0/0-1/200; 1 Part I -Strengthening to the Road From Sethurastha road to sea show road (via) Mariyamman kovil km 0/0 -1/700(R-193) 2 Picking the Existing B.T surface including all labour charges etc complete 3 Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte. 4 km 0/0 -1/700 5 Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete. 6 km 0/0 -1/0 7 km 1/0-1/700 8 Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER 9 km 0/0 -1/0 10 km 1/0 -1/700 11 Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER 12 km 0/0 -1/0 13 km 1/0 -1/700 14 Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. 15 km 0/0 -1/700 16 Providing and laying Tack coat over WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all 17 km 0/0 -1/700 18 BITUMINOUS CONCRETE 25 MMTHICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 19 km 0/0 -1/700 20 Road marking with Hot Applied Thermopalstic compound with reflectorising Glass beads on Bituminous surface 21 Hecta metre stone 22 KM Stone 23 60 cm Equilateral Traingle cautionary Sign board 24 60 Cm Circle (Mandatory ) Sign Board 25 CONSTRUCTION OF 6.00M SPAN CULVERT CH-400M 26 Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B 27 Supplying and filling in foundation and basement with FILLING M-SAND in layers not more 15 cm thick well rammed watered and compacted .complete complying to standard specification 28 Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation 29 Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.(BELOWSILL) 30 Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum (ABOVE SILL) 31 Supplying and erecting centeringshuttering includingnecessary supportsforplanesurface infoundationandbasementandinallfloorsforR C Ccolumn footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, criticalpier etcusing mild steel sheets of size 90 x 60 cm and 10 guagestiffened, weldedwithmildsteel angles ofsize25mmx25mmx3mmforboardinglaidoversilver oak(countrywood) scantlings of size 10cm x 6.5cm spacedof about 90cm centretocentreand officers including conveyance of all materials to site and proper centering etc complete. 32 Supplying and erecting centeringshuttering includingnecessary supportsforplanesurface infoundationandbasementandinallfloorsforR C Ccolumn footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, criticalpier etcusing mild steel sheets of size 90 x 60 cm and 10 guagestiffened, weldedwithmildsteel angles ofsize25mmx25mmx3mmforboardinglaidoversilver oak(countrywood) scantlings of size 10cm x 6.5cm spacedof about 90cm centretocentreand officers including conveyance of all materials to site and proper centering etc complete. 33 Reinforced cement concrete 1:1.5:3 mix using 20mmISS metalincluding cost and conveyance of all materials to site and alllabour charges for mixing, laying, and curing etc complete for 10 cum 34 Reinforced cement concrete 1:1.5:3 mix using 20mmISS metalincluding cost and conveyance of all materials to site and alllabour charges for mixing, laying, and curing etc complete for 10 cum 35 Suppling and fabrication charges for Steel including cost and conveyance of all materialsand labour charges etc complete. 36 Supply and Fixing of PVC or Compressible Fibre Board Expension Joints in between Deck Slab and Dird Wall including all labour charges etc complete.. 37 Supply and Fixing ofKraft Paper for full width of seting of Deck slabincluding all labour charges etc complete.. 38 Providing weepholes in brick masonry stone masnory, plain / reinforced concrete abutment, wing wall,return wall, with 100mm dia AC pipe extending through the full width of the structures with slope of 1(v) 20(h) towards drawing face complete as per drawing and technical specification clauses 614,709,1204,3.7 39 Part II-Strengthening to the Road From Sethuratha - Gandhi nagar (via) resankadai vadamalai puram street Km 0/0-1/200 40 Picking the Existing B.T surface including all labour charges etc complete 41 Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte. 42 km 0/0 -1/0 43 Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete. 44 km 0/0 -1/0 45 Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. 46 km 0/0 -1/0 47 Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. 48 km 0/0 -1/0 49 Providing and laying Tack coat over WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all 50 km 0/0 -1/0 51 BITUMINOUS CONCRETE 25 MMTHICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 52 km 0/0 -1/0 53 Road marking with Hot Applied Thermopalstic compound with reflectorising Glass beads on Bituminous surface 54 Hecta metre stone 55 60 cm Equilateral Traingle cautionary Sign board 56 CONSTRUCTION OF 1.50M SPAN CULVERT CH-235M 57 Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B 58 Supplying and filling in foundation and basement with FILLING M-SAND in layers not more 15 cm thick well rammed watered and compacted .complete complying to standard specification 59 Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation 60 Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.(BELOWSILL) 61 Supplying and erecting centeringshuttering includingnecessary supportsforplanesurface infoundationandbasementandinallfloorsforR C Ccolumn footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, criticalpier etcusing mild steel sheets of size 90 x 60 cm and 10 guagestiffened, weldedwithmildsteel angles ofsize25mmx25mmx3mmforboardinglaidoversilver oak(countrywood) scantlings of size 10cm x 6.5cm spacedof about 90cm centretocentreand officers including conveyance of all materials to site and proper centering etc complete. 62 Supplying and erecting centeringshuttering includingnecessary supportsforplanesurface infoundationandbasementandinallfloorsforR C Ccolumn footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, criticalpier etcusing mild steel sheets of size 90 x 60 cm and 10 guagestiffened, weldedwithmildsteel angles ofsize25mmx25mmx3mmforboardinglaidoversilver oak(countrywood) scantlings of size 10cm x 6.5cm spacedof about 90cm centretocentreand officers including conveyance of all materials to site and proper centering etc complete. 63 Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete. 64 Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete. 65 Reinforced cement concrete 1:1.5:3 mix using 20mmISS metalincluding cost and conveyance of all materials to site and alllabour charges for mixing, laying, and curing etc complete for 10 cum 66 Suppling and fabrication charges for Steel including cost and conveyance of all materialsand labour charges etc complete. 67 Provision for Bitumen pad 68 Supply and Fixing ofKraft Paper for full width of seting of Deck slabincluding all labour charges etc complete.. 69 Provision for Abutment PVC Seepage Pipes 70 CONSTRUCTION OF 1.50M SPAN CULVERT CH-350M 71 Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B 72 Supplying and filling in foundation and basement with FILLING M-SAND in layers not more 15 cm thick well rammed watered and compacted .complete complying to standard specification 73 Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation 74 Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.(BELOWSILL) 75 Supplying and erecting centeringshuttering includingnecessary supportsforplanesurface infoundationandbasementandinallfloorsforR C Ccolumn footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, criticalpier etcusing mild steel sheets of size 90 x 60 cm and 10 guagestiffened, weldedwithmildsteel angles ofsize25mmx25mmx3mmforboardinglaidoversilver oak(countrywood) scantlings of size 10cm x 6.5cm spacedof about 90cm centretocentreand officers including conveyance of all materials to site and proper centering etc complete. 76 Supplying and erecting centeringshuttering includingnecessary supportsforplanesurface infoundationandbasementandinallfloorsforR C Ccolumn footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, criticalpier etcusing mild steel sheets of size 90 x 60 cm and 10 guagestiffened, weldedwithmildsteel angles ofsize25mmx25mmx3mmforboardinglaidoversilver oak(countrywood) scantlings of size 10cm x 6.5cm spacedof about 90cm centretocentreand officers including conveyance of all materials to site and proper centering etc complete. 77 Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete. 78 Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete. 79 Reinforced cement concrete 1:1.5:3 mix using 20mmISS metalincluding cost and conveyance of all materials to site and alllabour charges for mixing, laying, and curing etc complete for 10 cum 80 Suppling and fabrication charges for Steel including cost and conveyance of all materialsand labour charges etc complete. 81 Provision for Bitumen pad 82 Supply and Fixing ofKraft Paper for full width of seting of Deck slabincluding all labour charges etc complete.. 83 Provision for Abutment PVC Seepage Pipes 84 CONSTRUCTION OF 1.50M SPAN CULVERT CH-550M 85 Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B 86 Supplying and filling in foundation and basement with FILLING M-SAND in layers not more 15 cm thick well rammed watered and compacted .complete complying to standard specification 87 Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation 88 Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.(BELOWSILL) 89 Supplying and erecting centeringshuttering includingnecessary supportsforplanesurface infoundationandbasementandinallfloorsforR C Ccolumn footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, criticalpier etcusing mild steel sheets of size 90 x 60 cm and 10 guagestiffened, weldedwithmildsteel angles ofsize25mmx25mmx3mmforboardinglaidoversilver oak(countrywood) scantlings of size 10cm x 6.5cm spacedof about 90cm centretocentreand officers including conveyance of all materials to site and proper centering etc complete. 90 Supplying and erecting centeringshuttering includingnecessary supportsforplanesurface infoundationandbasementandinallfloorsforR C Ccolumn footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, criticalpier etcusing mild steel sheets of size 90 x 60 cm and 10 guagestiffened, weldedwithmildsteel angles ofsize25mmx25mmx3mmforboardinglaidoversilver oak(countrywood) scantlings of size 10cm x 6.5cm spacedof about 90cm centretocentreand officers including conveyance of all materials to site and proper centering etc complete. 91 Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete. 92 Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete. 93 Reinforced cement concrete 1:1.5:3 mix using 20mmISS metalincluding cost and conveyance of all materials to site and alllabour charges for mixing, laying, and curing etc complete for 10 cum 94 Suppling and fabrication charges for Steel including cost and conveyance of all materialsand labour charges etc complete. 95 Provision for Bitumen pad 96 Supply and Fixing ofKraft Paper for full width of seting of Deck slabincluding all labour charges etc complete.. 97 Provision for Abutment PVC Seepage Pipes 98 CONSTRUCTION OF 1.50M SPAN CULVERT CH-610M 99 Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B 100 Supplying and filling in foundation and basement with FILLING M-SAND in layers not more 15 cm thick well rammed watered and compacted .complete complying to standard specification 101 Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation 102 Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.(BELOWSILL) 103 Supplying and erecting centeringshuttering includingnecessary supportsforplanesurface infoundationandbasementandinallfloorsforR C Ccolumn footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, criticalpier etcusing mild steel sheets of size 90 x 60 cm and 10 guagestiffened, weldedwithmildsteel angles ofsize25mmx25mmx3mmforboardinglaidoversilver oak(countrywood) scantlings of size 10cm x 6.5cm spacedof about 90cm centretocentreand officers including conveyance of all materials to site and proper centering etc complete. 104 Supplying and erecting centeringshuttering includingnecessary supportsforplanesurface infoundationandbasementandinallfloorsforR C Ccolumn footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, criticalpier etcusing mild steel sheets of size 90 x 60 cm and 10 guagestiffened, weldedwithmildsteel angles ofsize25mmx25mmx3mmforboardinglaidoversilver oak(countrywood) scantlings of size 10cm x 6.5cm spacedof about 90cm centretocentreand officers including conveyance of all materials to site and proper centering etc complete. 105 Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete. 106 Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete. 107 Reinforced cement concrete 1:1.5:3 mix using 20mmISS metalincluding cost and conveyance of all materials to site and alllabour charges for mixing, laying, and curing etc complete for 10 cum 108 Suppling and fabrication charges for Steel including cost and conveyance of all materialsand labour charges etc complete. 109 Provision for Bitumen pad 110 Supply and Fixing ofKraft Paper for full width of seting of Deck slabincluding all labour charges etc complete.. 111 Provision for Abutment PVC Seepage Pipes 112 CONSTRUCTION OF 1.50M SPAN CULVERT CH-735M 113 Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B 114 Supplying and filling in foundation and basement with FILLING M-SAND in layers not more 15 cm thick well rammed watered and compacted .complete complying to standard specification 115 Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation 116 Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.(BELOWSILL) 117 Supplying and erecting centeringshuttering includingnecessary supportsforplanesurface infoundationandbasementandinallfloorsforR C Ccolumn footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, criticalpier etcusing mild steel sheets of size 90 x 60 cm and 10 guagestiffened, weldedwithmildsteel angles ofsize25mmx25mmx3mmforboardinglaidoversilver oak(countrywood) scantlings of size 10cm x 6.5cm spacedof about 90cm centretocentreand officers including conveyance of all materials to site and proper centering etc complete. 118 Supplying and erecting centeringshuttering includingnecessary supportsforplanesurface infoundationandbasementandinallfloorsforR C Ccolumn footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, criticalpier etcusing mild steel sheets of size 90 x 60 cm and 10 guagestiffened, weldedwithmildsteel angles ofsize25mmx25mmx3mmforboardinglaidoversilver oak(countrywood) scantlings of size 10cm x 6.5cm spacedof about 90cm centretocentreand officers including conveyance of all materials to site and proper centering etc complete. 119 Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete. 120 Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete. 121 Reinforced cement concrete 1:1.5:3 mix using 20mmISS metalincluding cost and conveyance of all materials to site and alllabour charges for mixing, laying, and curing etc complete for 10 cum 122 Suppling and fabrication charges for Steel including cost and conveyance of all materialsand labour charges etc complete. 123 Provision for Bitumen pad 124 Supply and Fixing ofKraft Paper for full width of seting of Deck slabincluding all labour charges etc complete.. 125 Provision for Abutment PVC Seepage Pipes 126 CONSTRUCTION OF 1.50M SPAN CULVERT CH-850M 127 Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B 128 Supplying and filling in foundation and basement with FILLING M-SAND in layers not more 15 cm thick well rammed watered and compacted .complete complying to standard specification 129 Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation 130 Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.(BELOWSILL) 131 Supplying and erecting centeringshuttering includingnecessary supportsforplanesurface infoundationandbasementandinallfloorsforR C Ccolumn footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, criticalpier etcusing mild steel sheets of size 90 x 60 cm and 10 guagestiffened, weldedwithmildsteel angles ofsize25mmx25mmx3mmforboardinglaidoversilver oak(countrywood) scantlings of size 10cm x 6.5cm spacedof about 90cm centretocentreand officers including conveyance of all materials to site and proper centering etc complete. 132 Supplying and erecting centeringshuttering includingnecessary supportsforplanesurface infoundationandbasementandinallfloorsforR C Ccolumn footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, criticalpier etcusing mild steel sheets of size 90 x 60 cm and 10 guagestiffened, weldedwithmildsteel angles ofsize25mmx25mmx3mmforboardinglaidoversilver oak(countrywood) scantlings of size 10cm x 6.5cm spacedof about 90cm centretocentreand officers including conveyance of all materials to site and proper centering etc complete. 133 Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete. 134 Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete. 135 Reinforced cement concrete 1:1.5:3 mix using 20mmISS metalincluding cost and conveyance of all materials to site and alllabour charges for mixing, laying, and curing etc complete for 10 cum 136 Suppling and fabrication charges for Steel including cost and conveyance of all materialsand labour charges etc complete. 137 Provision for Bitumen pad 138 Supply and Fixing ofKraft Paper for full width of seting of Deck slabincluding all labour charges etc complete.. 139 Provision for Abutment PVC Seepage Pipes 140 GST 141 GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column BB for all works in this package}