| 1 | Earth work in excavation of foundation in all kinds of soil within 50m. Initial lead and 1.5m. Initial lift including rough dressing and breaking clods to maximum 5cm.to 7cm. and laying in layers not exceeding 0.3 m. in depth asper direction of the Engineer-in-charge. |
| 2 | Earthwork in filling by the excavated earth breaking the clods,laying in layers not exceeding 15cm size as directe by the EIC |
| 3 | Filling foundation and plinth with sand and well watered & rammed etc . Complete including cost of sand . |
| 4 | CementConcrete (1:3:6) by using 4cm. Size B.H.G.Hand boken metal including cost, conveyance etc. complete. |
| 5 | R.R Stone Masonry in CM (1:6) with 30 cm and above size stones including all cost of materials etc complete as directed by the EIC |
| 6 | Fly Ash Brick masonary with Flyash Bricks of 23cm.x 11cm.x 8cm. size having crushing strength not less than 75 Kg/Cm2 in cement mortar (1:4) in superstructure including splays, cuttings, circular moldings, watering & curing for 7 days, cost, conveyance, taxes & royalties of all materials, labour with T&P etc. complete in all respect. |
| 7 | Reinforced Cement concrete work of 1:1.5:3with 12mm & down grade black hard granite ( Crusher broken ) stone chips including hoisting & layingincluding cost, conveyance, taxes & royalty of all materials and labour with T&P etc. complete in all respect. |
| 8 | Rigid smooth centering and shuttering and dismantling them after casting etc complete as directed by the EIC column footing |
| 9 | Rigid smooth centering and shuttering and dismantling them after casting etc complete as directed by the EIC plinth |
| 10 | Rigid smooth centering and shuttering and dismantling them after casting etc complete as directed by the EIC Column and beam |
| 11 | Rigid smooth centering and shuttering and dismantling them after casting etc complete as directed by the EIC Slab |
| 12 | Supplying all materials, labour, T&P and providing 06 mm thick cement plaster (1:4) on brickwork with cement punning for skirting including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the E.I.C |
| 13 | 1\" thick As Flooring with CC 1:2:4 12mm down graded HBG chips including all cost of materials etc complete as directed by the EIC. |
| 14 | Supplying fitting and placing uncolated HYSD bar reinforcement as per drawing and technical specification including cost, conveyance and all texes of steel and blinding wire etc. Complete |
| 15 | 16mm. Thick cement plaster in c.m. (1:6) over Brick masonry including cost conveyance and royality of materials curing etc. Complete |
| 16 | Wall priming one coat with approved wall primer etc including cost of all materials, taxes and labour with T&P etc including all cost of materials etc complete as directed by the EIC. |
| 17 | wall painting two coats with weather coat weather coat o approved shade and approved make to give an even shade etc including cost of all materials taxes and labour etc complete as directed by the EIC. |
| 18 | Provision for internal electrification( Only pipe laying) Payment subject to actal submission of voucher |
| 19 | Photography and displayboard |