|
| 1 | 01.Periodic Renewal of Black Topping to L - 058 Killukudi Iyyanarkoil street Road KM 0/0-0/950 in Kilvelur block under PMGSY Incentive Fund 2024-25 |
| 2 | Providing and laying Tack coat over BT surface using 3.0 Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat |
| 3 | Km 0/0-0/950 |
| 4 | Advance patch work for making up the undulation in the existing B.Tsurface to an average thickness ofof 50 mm using45 mm IRC size HBG metal with 44 kg of Bitumen for 1 CUM mixed in hot mix plant laying at site including cost and conveyance of metal from approved quarry labour charges for tamping to required level line and grade etc completed complaying with standard specification |
| 5 | Km 0/0-0/950 |
| 6 | BITUMINOUS CONCRETE 25, 30/40 MMTHICK USING cmp (Grade-II)-Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 |
| 7 | Km 0/0-0/950 |
| 8 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS |
| 9 | Km 0/0-0/950 |
| 10 | Provision for Hectametre Stones Size 0.90m x 0.15m x 0.15m |
| 11 | Provision for Refixing/Repainting for Cautionary board |
| 12 | Provision for Refixing/Repainting for Logo board |
| 13 | Provision for Refixing/Repainting forCitizen informationboard |
| 14 | Provision for Refixing/Repainting for Information board/Name board |
| 15 | Provision for Refixing/Repainting for Maintenance board |
| 16 | Provision for Incentive Board |
| 17 | For the First Year from the date of completion of work |
| 18 | For the Second Year from the date of cpmpletion of work |
| 19 | For the Third Year from the date of completion of work |
| 20 | For the Fourth Year from the date of completion of work |
| 21 | For the Fifth Year from the date of completion of work |
| 22 | GST Amount for providing Service to Government Contract Works for the above RENEWAL& Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amountabove this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |