Power Boards / Undertakings / PSU Closing in 0 days TDR #49211488

Installation Of Gem (Maintenance Free) Earthing For Distribution Transformers And 33/11 K.V. Sub-Stations In The Area Of E.U.D.D.-Uptron/Rajajipuram/Aishbagh, Central Zone, Lesa, Luckow Against Bussiness Plan Scheme 2025-26

Issued by Boards / Undertakings / PSU · rajajipuram, Uttar Pradesh
Tender Value
9 Lakhs
Estimated cost
Bid Submission
30 May 2025
0 days left
EMD
9000
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
rajajipuram → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Installation of GEM (Maintenance free) earthing for Distribution Transformers and 33/11 K.V. Sub-Stations in the area of E.U.D.D.-UPTRON/Rajajipuram/Aishbagh, Central Zone, LESA, Luckow against Bussiness Plan Scheme 2025-26

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 23-May-2025 Revised BOQ Other 30-May-2025
2 23-May-2025 Technical Specification Other 30-May-2025
3 23-May-2025 Date extension Date 30-May-2025

BOQ

Name of Work: BOQ for \"Installation of GEM (Maintenance free) earthing for Distribution Transformers and 33/11 K.V. Sub-Stations in the area of E.U.D.D.-UPTRON/Rajajipuram/Aishbagh, Central Zone, LESA, Luckow against Bussiness Plan Scheme 2025-26\"
Sl. No. Item Description
1Supply and installation of Maintenance free earthing with GEM (Ground Enhancement Material) for distribution transformers in the area of E.U.D.D.-UPTRON by installation of 4.2 mm dia, 3 meter long steel rod of 250 micron molecular copper bonding along with 2 bags of GEM (11.3 kg each) by interconnection with 50x6 ms flat including all labour, T&P and materials to achieve earth resistance less the 2 Ohm. and taking the earth resistivity after completion of work and submitting the earth resistance report to concerning Executive Engineer.
2Supply and installation of Maintenance free earthing with GEM (ground enhancement material) for Rajajipuram New Pal Tiraha Sub Station by installation of 4.2 mm dia, 3 meter long steel rod of 250 micron molecular copper bonding along with 2 bags of GEM(11.3 kg each) by interconnection with 50X6 M.S. flat including all labour, T&P and materials to achieve earth resistance less the 02 Ohm (05 Nos. earthing)and taking the earth resistivity after completion of work and submitting the earth resistance report to concerning Executive Engineer. (M.S. Strip 50X6 mm. will be provided by department)
3Supply and installation of Maintenance free earthing with GEM (ground enhancement material) for Talkatora Sub Station by installation of 4.2 mm dia, 3 meter long steel rod of 250 micron molecular copper bonding along with 2 bags of GEM(11.3 kg each) by interconnection with 50X6 M.S. flat including all labour, T&P and materials to achieve earth resistance less the 02 Ohm (05 Nos. earthing)and taking the earth resistivity after completion of work and submitting the earth resistance report to concerning Executive Engineer. (M.S. Strip 50X6 mm. will be provided by department)
4Supply and installation of Maintenance free earthing with GEM (ground enhancement material) for Aishbagh Sub Station by installation of 4.2 mm dia, 3 meter long steel rod of 250 micron molecular copper bonding along with 2 bags of GEM(11.3 kg each) by interconnection with 50X6 M.S. flat including all labour, T&P and materials to achieve earth resistance less the 02 Ohm (05 Nos. earthing)and taking the earth resistivity after completion of work and submitting the earth resistance report to concerning Executive Engineer.(M.S. Strip 50X6 mm. will be provided by department)
5Supply and installation of Maintenance free earthing with GEM (ground enhancement material) for Vaid Steel Sub Station by installation of 4.2 mm dia, 3 meter long steel rod of 250 micron molecular copper bonding along with 2 bags of GEM(11.3 kg each) by interconnection with 50X6 M.S. flat including all labour, T&P and materials to achieve earth resistance less the 02 Ohm (05 Nos. earthing)and taking the earth resistivity after completion of work and submitting the earth resistance report to concerning Executive Engineer. (M.S. Strip 50X6 mm. will be provided by department)
6Note :-1- All the material provided by contractor shall be as per norms of UPPCL/RESPO.2- One carriage including loading/unloading from dump site to pit site is included in scope of work.3- During execution of work all risk will be of the contractor.4- Contractor will provide all T & P, vehicle and man power.5- All the old and used material should be taken on book.6- The quantity may be vary ±10%.7- GST will be paid extra as legally applicable.8-The work should be carried out under Business Plan 2025-26. 9-The work will be done as per norms of UPPCL/RESPO.

AI Tender Summary

OUR REF NO 49211488
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 9 Lakhs
LAST DATE 30-05-2025
Authority
Authority Name Madhyanchal Vidut Vitran Nigam Limited
Work Description Installation of GEM (Maintenance free) earthing for Distribution Transformers and 33/11 K.V. Sub-Stations in the area of E.U.D.D.-UPTRON/Rajajipuram/Aishbagh, Central Zone, LESA, Luckow against Bussiness Plan Scheme 2025-26
Basic Detail
Tender No 03/E.U.D.C.-Talkatora/2025-26
Bidding Type Tender
Location
City rajajipuram
State Uttar Pradesh
Key Dates
Publish Date 23 May 2025
Submission Date 30 May 2025
Open Date 31 May 2025
Finance
Tender Value 9 Lakhs
Tender Fee 1180
EMD 9000
Exemption Not Available
Document List
69534613-955d-48d3-8ef0-12d14478b919.html
BOQ_1885531.xls
formAfinal.pdf
TenderDoc03.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

May 23, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
May 30, 2025
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 30, 2025
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 30, 2025
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 30, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
May 31, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

69534613-955d-48d3-8ef0-12d14478b919.html

xls

BOQ_1885531.xls

pdf

formAfinal.pdf

pdf

TenderDoc03.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders