| 1 | Clearing the site |
| 2 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 meters beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary backfilling, ramming, watering including shoring and strutting etc. complete. |
| 3 | Providing and laying in suit, cement concrete in M15/1:2:4 of trap/granite/quartzite/gneiss metal for bed blocks, foundationblocks and such other item including bailing out water formwork, compacting, roughening them if special finish to be provided and curing and finishing if required complete. |
| 4 | Providing second class Burnt Brick masonry with conventional/ I.S. type bricks in cement mortar 1:6 in foundations and plinth of inner walls/ in plinth external walls including bailing out water manually , striking joints on unexposed faces, raking out joints on exposed faces and watering etc. Complete. |
| 5 | Providing internal cement plaster 20mm thick in two coats in cement mortar 1:3 without neeru finish, to concrete, brick surface, in all positions including scaffolding and curing complete |
| 6 | Providing and laying in suit, cement concrete in M20 of trap /granite/ quartzite/ gneiss metal for bed blocks, foundationblocks and such other item including bailing out water formwork, compacting, roughening them if special finish to be provided and curing and finishing if required complete. |
| 7 | Providing and fixing in position steel bar reinforcement of various diameters for RCC piles, caps, footings, foundations, slabs, beams, columns, canopies, staircases, newels, chajjas, lintels, pardies, copings, fins, arches, etc. as per detailed designs, drawings and schedules; including cutting, bending, hooking the bars, binding with wires or tack weldi ng and supporting as required, etc. complete (including cost of binding wire). (Bd-F 17/306) |
| 8 | (MJP DSR 2022-23) Item No- 5/B Page -52 +10% Hilley Area Charges Providing, lowering, laying and placing in position, shrouding material for porous pipe gallery / slotted pipe gallery / trench gallery with all leads and lifts involved including transportation of materials to site of works, screening and washing of materials and placing in position with given section, etc. complete as directed by Engineer-in-charge.A)40 MM Metal |
| 9 | B)12 to 20 MM Metal |
| 10 | C)6 to 12 MM Metal |
| 11 | Providing and supplying in standard lengths ISI mark rigid nplasticised PVC pipessuitable for potable water with solvent cement joints cluding cost of couplers, as per IS cification no. 4985 / 1988 excluding GST levied by GOI and GOM in all spect, including transportation, freight charges inspection charges,oading, unloading,conveyance to the departmental stores and stacking the same in closed shed duly protected from sun rays and rains including cost of jointing material i.e. solvent cement,etc. complete (selffit type to be jointed with cement solvent).Note : 1) 10% of cost of pipes b) 160mm dia working Pressure 6 Kg./Sq.cm. |
| 12 | Lowering, laying and jointing with P.V.C. pipes and specials of following class and diameter including cost of conveyance from stores to site of works including cost of all labour, material, except cement solvent, rubber ring, as per IS code, etc. complete (with cement solvent joint / ring fit joint). b) 160mm dia working Pressure 6 to 12.5 Kg./Sq.cm. |
| 13 | Providing and fixing CI manhole cover of size 90cmX60cm with frame over (inspection chember etc complete (35kg) |
| 14 | Providing Plantation for Root Zone as per Direction of Engineer in Charge etc. complete. |
| 15 | Providing rubble soling with selected rubble includig hand packing as per directed by engineer I charges etc. complete. |
| 16 | Sub work no 2. Big Leach pit Excavation for foundation in hard murum including removing the excavated material upto distance of 50 meters beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary backfilling, ramming, watering including shoring and strutting etc. complete. |
| 17 | Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-in charge, normal dewatering, preparing the bed forfoundation and excluding backfilling, etc.complete. (Bd-A-4/259) |
| 18 | Providing and laying in suit, cement concrete in M15/1:2:4 of trap/granite/quartzite/gneiss metal for bed blocks, foundationblocks and such other item including bailing out water formwork, compacting, roughening them if special finish to be provided and curing and finishing if required complete. |
| 19 | Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, excluding excavation, B.B. masonry in CM 1:5proportion precast RCC frame and cover, etc. complete as directed by Engineer-in-chargeAs above of 90 x 90 cm internal size and depth upto 1.2 M with precast R.C.C slab cover |
| 20 | Providing ISI standard R.C.C. pipes in standard lengths of following class and diameter suitable for either collar joints or rubber ring joints, excludingGST lev-ied by GOI & GOM in all respect including inspec- tion charges, transport to departmental stores, c- tion charges, transport to departmentalstores, unloading and stacking etc. complete as per IS-458/1988.Class PII 300mm |