| 1 | Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. |
| 2 | Earth work In excavation of foundation trenches or drains, in all sorts of soll (including mixed soil but excluding laterite orsandstone) Including removing, ading or stacking the spoils within a lead of 75 m. as directed . The tem includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom. baling out water as required complete. (a) Depth of excavation not exceeding 1500 mm a) In ground floor including roof. |
| 3 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof. |
| 4 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches |
| 5 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground flooras per relevant IS codes.a) Pakur Variety. |
| 6 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)(f) 25 mm to 30 mm shuttering without staging in foundation |
| 7 | Brick work With 1st class bricks in cement mortar (1:4)a) In foundation and plinth |
| 8 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (ii) With 1:4 cement mortar(b) 15 mm thick plaster |
| 9 | Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per 100 sq.m. |
| 10 | Dismantling of damaged embeded part like guide channel/bottom seal beam/top seal beam of gates of canal/river from civil structure as directed by the Engineer-in- charge.The cost of man power employed for dismantling and hire charges of Tools and plant, scaffolding charges etc.Payment will be made on actual length of Guide Channel. |
| 11 | Taking out old existing unservicable damaged gate shutter of canal/river completely after disengaging from hoisting system completely for installation of new gate shutter. the work includes cutting of gates intosuitable pieces by gas cutting removing the same by mechanical means or suitable crane, stacking all the pieces at the suitable place or as directed by the Engineer in charge upto a lead of 1000 m. The cost includes cost of man power employed for dismantling and cost of consumables like oxygen,accetylene gas, welding rod, hirecharges of machineries, like chain pulley block, gas set, grinding machine, welding set, tools & tackle, scaffolding and safety equipment etc including carriage loading & unloading. The cost of complete dismantling of hoisting system & cost of old unservicable materials handed over to departmental godown including loading & unloading will be provided extra.a) Gate shutter size upto 4.00 sq.m |
| 12 | Fabrication , supply, erection and commissioning of embeded parts consisting of seal beam, Guide channel with all accessories for vertical gate of distributories/branch canal/minor canal/channel made of MS material consisting of angle, channel, beam, plate, flat,etc.conforming to IS : 2062 -2011/latest revision manufactured as per approved drawing and direction of Engineer in charge. The Cost includes cost of Materials, hire charges of Machinaries , Manpower,cutting ,alinging,anchoring,welding,finishing,consumables, Carriage and all overheads with all leads and lifts complete as per specification (without painting). |
| 13 | Fabrication , Supply, erection and commissioning of new Slide type vertical lift regulator service gates of Distriburories/Branch canal/Minor Canal/Channel as per IS: 5620 - 2000/Latest Revision consisting of skin plate, vertical and horizontal grider, stiffener etc. made of MS material consisting of angle , channel, beam, plate,flat, etc. confirming to IS:2026-2011/latest revision manufactured as per approved drawing and direction of Engineer in charge. The cost includes cost of Materials, Machinaries,Manpower,Cutting,Aligning,drilling,welding,Finishing,Consumables,Carriages and all overheads with all leads and lifts complete as per specification(without painting). |
| 14 | Supplying, fitting, & fixing of top runner by supplying, fitting and fixing of new Mild Steel Channel confirming to IS:2062-2011/latest revision with necessary Mild Steel lugs of required length and size by making hole into top of the civil structure and fixing with necessary masonry work with maintaining proper line and level as directed by the Engineer-in-charge. The cost includes cost of materials, manpower employed, cost of M.S materials, cost of civil works along with two coats of epoxy paint over two coats of zinc rich primer. |
| 15 | Supplying, fitting, & fixing of screw hoisting arrangementmade of MS bottom plate, top plate,coller with necessary holes on base plate and top plate to accomodate thrust bearing of suitable size as per approved drawing& design and as per direction of Engineerin charge. The cost includes cost of ms plate as per IS : 2062 -2011/ Latest revision, manpower employed for dismantling and fitting, fixing, consumables like cutting tools, bolts & nuts of required size hire charges of machineries, like lathe/shaping machine, grinding machine, drilling machine, tools & tackles etc including carriage, loading & unloading but excluding the cost of lifting Nut/Bush, thrust bearing & wheel supplied seperately. |
| 16 | Supply of bearings (j) Bearing no 51217 (SKF ) (Thrust Bearing). |
| 17 | Supplying, fitting, & fixing M.S.fabricated wheel in the screw hoisting system for lifting or lowering the draw shutter. The wheel consisting of suitable size ms hub to accomodate any size of G.M/C.I nut. The rim and four nos arm of wheel are made of 25 mm. to 36 mm. dia m.s rod complete as per direction of the Engineer-in-charge. The cost includes cost of materials, man power employed for dismantling and fitting, fixing, consumables like cutting tools, welding rod, hire charges of machineries, like bending machine, lathe machine, grinding machine,welding set,tools & tackles etc including carriage loading & unloading(a) Upto 60 cm dia MS wheel. |
| 18 | Supply, installation, testing and commisioning of following items for hoisting system and gear box as mentioned below as per direction including cost of Materials, Machinaries, Manpower, Cutting, Machining,Aligning,Anchoring,Welding, Finishing, Consumables Carriage and all overheads with all leads and lifts complete as per specification (Without painting)(XVI) Bush (GM) |
| 19 | Supplying, fitting, & fixing of Screw rod having square thread of 1.5/2 T.P.I,Material bright steel [EN-8/EN-9/forged CI-4(45C8) as per IS:1875 1992/latest Revision]. dia and thread length as required and providing with a drilled hole of required dia on the other end after flattened and supplying with one no. bolt and nut of required size and all other components as required as per direction of Engineer-in- Charge. The cost includes cost of material, man power employed, consumables like cutting tools, emery paper, cloths,hire charges of machineries, tools & tackles, grease, mobil etc including carriage loading & unloading as per direction of Engineer-in charge. |
| 20 | Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc |
| 21 | Painting with ready mixed Black Japan of approved make and brand including smoothening surface(b)Two coat. |
| 22 | Earthwork in excavation in the canals / drainage) channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 ¢m. for making banks as per profile or to depesit the same in any other place within an initial lead of 30 metre and intial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge. a) Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil |
| 23 | Supply of labours for clearance of chocked pipe of sluice gate . Unskilled labours (Male or Female) |