}

Tender For Removing Leakage & Chokage In Pipe Lines Undersub Dnlosal Sl. No. Item Description 1 Repairing Of Leakage In Existing Distribution/Rising Main/Transmission Main Ac/Pvc/Hdpe Pipe Line Up To 1.5 Mtr Depth Of Sizes As Given Below By Digging , sikar-Rajasthan

Public Health Engineering Department has published Tender For Removing Leakage & Chokage In Pipe Lines Undersub Dnlosal Sl. No. Item Description 1 Repairing Of Leakage In Existing Distribution/Rising Main/Transmission Main Ac/Pvc/Hdpe Pipe Line Up To 1.5 Mtr Depth Of Sizes As Given Below By Digging . Submission Date for this Tender is 26-05-2025. Pipe Laying Tenders in sikar Rajasthan. Bidders can get complete Tender details and download the document.




Tender Notice

49200997
Tender For Removing Leakage & Chokage In Pipe Lines Undersub Dnlosal Sl. No. Item Description 1 Repairing Of Leakage In Existing Distribution/Rising Main/Transmission Main Ac/Pvc/Hdpe Pipe Line Up To 1.5 Mtr Depth Of Sizes As Given Below By Digging
Tender
Indian
Rajasthan
Sikar
26-05-2025

Tender Details

tender for REMOVING LEAKAGE & CHOKAGE IN PIPE LINES UNDERSUB DNLOSAL Sl. No. Item Description 1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 2 In all type Soil AC/PVC/HDPE pipe 3 50/63/75mm 4 Add on above item no. 1 for B.T. Road 5 Add on above item no. 1 for C.C. Road 6 Add on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 7 Add on above no. 1 item if depth of pipeline is above 3.0 mtr. 8 80/90mm 9 Add on above item no. 1 for B.T. Road 10 Add on above item no. 1 for C.C. Road 11 Add on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 12 Add on above no. 1 item if depth of pipeline is above 3.0 mtr. 13 100/110mm 14 Add on above item no. 1 for B.T. Road 15 Add on above item no. 1 for C.C. Road 16 Add on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 17 Add on above no. 1 item if depth of pipeline is above 3.0 mtr. 18 125/140mm 19 Add on above item no. 1 for B.T. Road 20 Add on above item no. 1 for C.C. Road 21 Add on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 22 Add on above no. 1 item if depth of pipeline is above 3.0 mtr. 23 150/160/180mm 24 Add on above item no. 1 for B.T. Road 25 Add on above item no. 1 for C.C. Road 26 Add on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 27 Add on above no. 1 item if depth of pipeline is above 3.0 mtr. 28 200/225mm 29 Add on above item no. 1 for B.T. Road 30 Add on above item no. 1 for C.C. Road 31 Add on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 32 Add on above no. 1 item if depth of pipeline is above 3.0 mtr. 33 250/280mm 34 Add on above item no. 1 for B.T. Road 35 Add on above item no. 1 for C.C. Road 36 Add on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 37 Add on above no. 1 item if depth of pipeline is above 3.0 mtr. 38 300/315mm 39 Add on above item no. 1 for B.T. Road 40 Add on above item no. 1 for C.C. Road 41 Add on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 42 Add on above no. 1 item if depth of pipeline is above 3.0 mtr. 43 350mm 44 Add on above item no. 1 for B.T. Road 45 Add on above item no. 1 for C.C. Road 46 Add on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 47 Add on above no. 1 item if depth of pipeline is above 3.0 mtr. 48 400mm 49 Add on above item no. 1 for B.T. Road 50 Add on above item no. 1 for C.C. Road 51 Add on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 52 Add on above no. 1 item if depth of pipeline is above 3.0 mtr. 53 Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost) 54 In all type Soil 55 80mm 56 Add on above item no. 2 for B.T. Road 57 Add on above item no. 2 for C.C. Road 58 Add on above no. 2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 59 Add on above no. 2 item if depth of pipeline is above 3.0 mtr. 60 100mm 61 Add on above item no. 2 for B.T. Road 62 Add on above item no. 2 for C.C. Road 63 Add on above no. 2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 64 Add on above no. 2 item if depth of pipeline is above 3.0 mtr. 65 125mm 66 Add on above item no. 2 for B.T. Road 67 Add on above item no. 2 for C.C. Road 68 Add on above no. 2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 69 Add on above no. 2 item if depth of pipeline is above 3.0 mtr. 70 150mm 71 Add on above item no. 2 for B.T. Road 72 Add on above item no. 2 for C.C. Road 73 Add on above no. 2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 74 Add on above no. 2 item if depth of pipeline is above 3.0 mtr. 75 200mm 76 Add on above item no. 2 for B.T. Road 77 Add on above item no. 2 for C.C. Road 78 Add on above no. 2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 79 Add on above no. 2 item if depth of pipeline is above 3.0 mtr. 80 250mm 81 Add on above item no. 2 for B.T. Road 82 Add on above item no. 2 for C.C. Road 83 Add on above no. 2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 84 Add on above no. 2 item if depth of pipeline is above 3.0 mtr. 85 300mm 86 Add on above item no. 2 for B.T. Road 87 Add on above item no. 2 for C.C. Road 88 Add on above no. 2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 89 Add on above no. 2 item if depth of pipeline is above 3.0 mtr. 90 350mm 91 Add on above item no. 2 for B.T. Road 92 Add on above item no. 2 for C.C. Road 93 Add on above no. 2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 94 Add on above no. 2 item if depth of pipeline is above 3.0 mtr. 95 400mm 96 Add on above item no. 2 for B.T. Road 97 Add on above item no. 2 for C.C. Road 98 Add on above no. 2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 99 Add on above no. 2 item if depth of pipeline is above 3.0 mtr. 100 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 101 In all type Soil 102 50/63/75mm 103 Add on above item no. 3 for B.T. Road 104 Add on above item no. 3 for C.C. Road 105 Add on above no. 3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 106 Add on above no. 3 item if depth of pipeline is above 3.0 mtr. 107 80/90mm 108 Add on above item no. 3 for B.T. Road 109 Add on above item no. 3 for C.C. Road 110 Add on above no. 3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 111 Add on above no. 3 item if depth of pipeline is above 3.0 mtr. 112 100/110mm 113 Add on above item no. 3 for B.T. Road 114 Add on above item no. 3 for C.C. Road 115 Add on above no. 3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 116 Add on above no. 3 item if depth of pipeline is above 3.0 mtr. 117 125/140mm 118 Add on above item no. 3 for B.T. Road 119 Add on above item no. 3 for C.C. Road 120 Add on above no. 3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 121 Add on above no. 3 item if depth of pipeline is above 3.0 mtr. 122 150/160/180mm 123 Add on above item no. 3 for B.T. Road 124 Add on above item no. 3 for C.C. Road 125 Add on above no. 3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 126 Add on above no. 3 item if depth of pipeline is above 3.0 mtr. 127 200/225mm 128 Add on above item no. 3 for B.T. Road 129 Add on above item no. 3 for C.C. Road 130 Add on above no. 3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 131 Add on above no. 3 item if depth of pipeline is above 3.0 mtr. 132 250/280mm 133 Add on above item no. 3 for B.T. Road 134 Add on above item no. 3 for C.C. Road 135 Add on above no. 3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 136 Add on above no. 3 item if depth of pipeline is above 3.0 mtr. 137 300/315mm 138 Add on above item no. 3 for B.T. Road 139 Add on above item no. 3 for C.C. Road 140 Add on above no. 3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 141 Add on above no. 3 item if depth of pipeline is above 3.0 mtr. 142 350mm 143 Add on above item no. 3 for B.T. Road 144 Add on above item no. 3 for C.C. Road 145 Add on above no. 3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 146 Add on above no. 3 item if depth of pipeline is above 3.0 mtr. 147 400mm 148 Add on above item no. 3 for B.T. Road 149 Add on above item no. 3 for C.C. Road 150 Add on above no. 3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 151 Add on above no. 3 item if depth of pipeline is above 3.0 mtr. 152 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) 153 In all type Soil 154 80 mm 155 Add on above item no. 4 for B.T. Road 156 Add on above item no. 4 for CC Road 157 Add on above item no. 4 if depth of pipe line is above 1.5 mtr to 3.0 mtr 158 Deduct on above item no. 4 if valve is fixed at plinth level / platform i.e. no excavation is required 159 100 mm 160 Add on above item no. 4 for B.T. Road 161 Add on above item no. 4 for CC Road 162 Add on above item no. 4 if depth of pipe line is above 1.5 mtr to 3.0 mtr 163 Deduct on above item no. 4 if valve is fixed at plinth level / platform i.e. no excavation is required 164 125 mm 165 Add on above item no. 4 for B.T. Road 166 Add on above item no. 4 for CC Road 167 Add on above item no. 4 if depth of pipe line is above 1.5 mtr to 3.0 mtr 168 Deduct on above item no. 4 if valve is fixed at plinth level / platform i.e. no excavation is required 169 150 mm 170 Add on above item no. 4 for B.T. Road 171 Add on above item no. 4 for CC Road 172 Add on above item no. 4 if depth of pipe line is above 1.5 mtr to 3.0 mtr 173 Deduct on above item no. 4 if valve is fixed at plinth level / platform i.e. no excavation is required 174 200 mm 175 Add on above item no. 4 for B.T. Road 176 Add on above item no. 4 for CC Road 177 Add on above item no. 4 if depth of pipe line is above 1.5 mtr to 3.0 mtr 178 Deduct on above item no. 4 if valve is fixed at plinth level / platform i.e. no excavation is required 179 250 mm 180 Add on above item no. 4 for B.T. Road 181 Add on above item no. 4 for CC Road 182 Add on above item no. 4 if depth of pipe line is above 1.5 mtr to 3.0 mtr 183 Deduct on above item no. 4 if valve is fixed at plinth level / platform i.e. no excavation is required 184 300 mm 185 Add on above item no. 4 for B.T. Road 186 Add on above item no. 4 for CC Road 187 Add on above item no. 4 if depth of pipe line is above 1.5 mtr to 3.0 mtr 188 Deduct on above item no. 4 if valve is fixed at plinth level / platform i.e. no excavation is required 189 350 mm 190 Add on above item no. 4 for B.T. Road 191 Add on above item no. 4 for CC Road 192 Add on above item no. 4 if depth of pipe line is above 1.5 mtr to 3.0 mtr 193 Deduct on above item no. 4 if valve is fixed at plinth level / platform i.e. no excavation is required 194 400 mm 195 Add on above item no. 4 for B.T. Road 196 Add on above item no. 4 for CC Road 197 Add on above item no. 4 if depth of pipe line is above 1.5 mtr to 3.0 mtr 198 Deduct on above item no. 4 if valve is fixed at plinth level / platform i.e. no excavation is required 199 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 200 In all type Soil 201 75 mm 202 Add on above item no. 5 for B.T. Road 203 Add on above item no. 5 for CC Road 204 Add on above item no. 5 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 205 Add on above item no. 5 if depth of pipe line is above3.0 mtr. 206 90/80 mm 207 Add on above item no. 5 for B.T. Road 208 Add on above item no. 5 for CC Road 209 Add on above item no. 5 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 210 Add on above item no. 5 if depth of pipe line is above3.0 mtr. 211 110/100 mm 212 Add on above item no. 5 for B.T. Road 213 Add on above item no. 5 for CC Road 214 Add on above item no. 5 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 215 Add on above item no. 5 if depth of pipe line is above3.0 mtr. 216 140/125 mm 217 Add on above item no. 5 for B.T. Road 218 Add on above item no. 5 for CC Road 219 Add on above item no. 5 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 220 Add on above item no. 5 if depth of pipe line is above3.0 mtr. 221 180/160/150 mm 222 Add on above item no. 5 for B.T. Road 223 Add on above item no. 5 for CC Road 224 Add on above item no. 5 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 225 Add on above item no. 5 if depth of pipe line is above3.0 mtr. 226 225/200 mm 227 Add on above item no. 5 for B.T. Road 228 Add on above item no. 5 for CC Road 229 Add on above item no. 5 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 230 Add on above item no. 5 if depth of pipe line is above3.0 mtr. 231 250 mm 232 Add on above item no. 5 for B.T. Road 233 Add on above item no. 5 for CC Road 234 Add on above item no. 5 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 235 Add on above item no. 5 if depth of pipe line is above3.0 mtr. 236 300 mm 237 Add on above item no. 5 for B.T. Road 238 Add on above item no. 5 for CC Road 239 Add on above item no. 5 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 240 Add on above item no. 5 if depth of pipe line is above3.0 mtr. 241 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 242 In all type Soil 243 80 mm 244 Add on above item no. 6 for B.T. Road 245 Add on above item no. 6 for CC Road 246 Add on above item no. 6 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. 247 Add on above item no. 6 if depth of pipe line is above 3.0 mtr 248 100 mm 249 Add on above item no. 6 for B.T. Road 250 Add on above item no. 6 for CC Road 251 Add on above item no. 6 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. 252 Add on above item no. 6 if depth of pipe line is above 3.0 mtr 253 125 mm 254 Add on above item no. 6 for B.T. Road 255 Add on above item no. 6 for CC Road 256 Add on above item no. 6 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. 257 Add on above item no. 6 if depth of pipe line is above 3.0 mtr 258 150 mm 259 Add on above item no. 6 for B.T. Road 260 Add on above item no. 6 for CC Road 261 Add on above item no. 6 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. 262 Add on above item no. 6 if depth of pipe line is above 3.0 mtr 263 225/200 mm 264 Add on above item no. 6 for B.T. Road 265 Add on above item no. 6 for CC Road 266 Add on above item no. 6 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. 267 Add on above item no. 6 if depth of pipe line is above 3.0 mtr 268 250 mm 269 Add on above item no. 6 for B.T. Road 270 Add on above item no. 6 for CC Road 271 Add on above item no. 6 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. 272 Add on above item no. 6 if depth of pipe line is above 3.0 mtr 273 300 mm 274 Add on above item no. 6 for B.T. Road 275 Add on above item no. 6 for CC Road 276 Add on above item no. 6 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. 277 Add on above item no. 6 if depth of pipe line is above 3.0 mtr 278 Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it & upto ground level for entire job contractor will use his own T&P & labour. 279 Add on above item no. 7 for B.T. Road 280 Add on above item no. 7 for CC Road 281 Add on above item no. 7 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 282 Removal of sluice valve in existing pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material tomake repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost) 283 In all type Soil 284 80 mm dia pipe to 100mm 285 Add on above item no. 8 for B.T. Road 286 Add on above item no. 8 for CC Road 287 Add on above item no. 8 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 288 125 mm dia pipe to 150mm 289 Add on above item no. 8 for B.T. Road 290 Add on above item no. 8 for CC Road 291 Add on above item no. 8 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 292 200 mm dia pipe to 250mm 293 Add on above item no. 8 for B.T. Road 294 Add on above item no. 8 for CC Road 295 Add on above item no. 8 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 296 300 mm dia pipe to 350mm 297 Add on above item no. 8 for B.T. Road 298 Add on above item no. 8 for CC Road 299 Add on above item no. 8 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 300 400mm 301 Add on above item no. 8 for B.T. Road 302 Add on above item no. 8 for CC Road 303 Add on above item no. 8 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 304 Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). 305 In all type Soil 306 80 mm to 110 mm 307 Add on above item no. 9 for B.T. Road 308 Add on above item no. 9 for CC Road 309 Add on above item no.9 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 310 125 mm to 165 mm 311 Add on above item no. 9 for B.T. Road 312 Add on above item no. 9 for CC Road 313 Add on above item no.9 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 314 200 mm to 300 mm 315 Add on above item no. 9 for B.T. Road 316 Add on above item no. 9 for CC Road 317 Add on above item no.9 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 318 Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). 319 In all type Soil 320 80 mm to 100 mm 321 Add on above item no.10 for B.T. Road 322 Add on above item no.10 for CC Road 323 Add on above item no.10 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 324 125 mm to 150 mm 325 Add on above item no.10 for B.T. Road 326 Add on above item no.10 for CC Road 327 Add on above item no.10 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 328 200 mm to 300 mm 329 Add on above item no.10 for B.T. Road 330 Add on above item no.10 for CC Road 331 Add on above item no.10 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 332 350 mm to 450 mm 333 Add on above item no.10 for B.T. Road 334 Add on above item no.10 for CC Road 335 Add on above item no.10 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 336 500 mm to 600 mm 337 Add on above item no.10 for B.T. Road 338 Add on above item no.10 for CC Road 339 Add on above item no.10 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 340 Labour charges for removal of complaint of polluted water supply to the consumers 341 Survey of the locality of polluted water supply for preliminary assessment of source of pollution during supply hours 342 Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe lineby fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size 343 In all type Soil 344 50 to 75 mm 345 Add on above item no.11.2 for B.T. Road 346 Add on above item no.11.2 for CC Road 347 Add on above item no. 11.2 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 348 80-110 mm 349 Add on above item no.11.2 for B.T. Road 350 Add on above item no.11.2 for CC Road 351 Add on above item no. 11.2 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 352 125 to 165 mm 353 Add on above item no.11.2 for B.T. Road 354 Add on above item no.11.2 for CC Road 355 Add on above item no. 11.2 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 356 200 to 300 mm 357 Add on above item no.11.2 for B.T. Road 358 Add on above item no.11.2 for CC Road 359 Add on above item no. 11.2 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 360 350 to 400 mm 361 Add on above item no.11.2 for B.T. Road 362 Add on above item no.11.2 for CC Road 363 Add on above item no. 11.2 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 364 Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution CI/DI/MS pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size 365 In all type Soil 366 80-100 mm 367 Add on above item 11.3 for B.T. Road 368 Add on above item no. 11.3 for CC Road 369 Add on above item no.11.3 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 370 125 to 150 mm 371 Add on above item 11.3 for B.T. Road 372 Add on above item no. 11.3 for CC Road 373 Add on above item no.11.3 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 374 200 to 300 mm 375 Add on above item 11.3 for B.T. Road 376 Add on above item no. 11.3 for CC Road 377 Add on above item no.11.3 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 378 350 to 400 mm 379 Add on above item 11.3 for B.T. Road 380 Add on above item no. 11.3 for CC Road 381 Add on above item no.11.3 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 382 Restoration of bitumen road by patch work of WBM using crushed / broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material , cleaning of surface of WBM and providing of seal & tack coat as per site condition by using ready cold mix up to the satisfaction of engineer in charge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job. 383 Restoration of cement concrete road including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compacting cement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction of engineer incharge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job.

Key Value

Document Fees
INR 500 /-
EMD
INR 16000.0 /-
Tender Value
INR 8 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail