| 1 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m andaliftof2minhardstiffclay,stiffblock cotton, hard red earth, shales, murram, gravel, stoneyearthandearthmixedwithsmallsize boulders etc. complete. complying with std. specifications.SS 20 A |
| 2 | Construction of Granular Sub-base by providing closegradedmaterial,mixinginamachanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor graderonpreparedsurfaceandcompacting with vibratory power roller to acheive the desired density,Complete as per clause 401. |
| 3 | Providing,Laying,Spreadingandcompacting gradedstoneaggregatetoWetMixMacadam forrequiredthick specificationincluding premixingthematerialwithwateratOMCin mechanical mix plant carriage of mixed material bytippertositelayinginuniformlayerswith paversinsub base/ basecourse onwell prepared surface and compacting with vibratory roller to achieve the desired density,including all costconveyance ofmaterialsand labour chargesetc.completeasperstandard specificationsandasdirectedby departmental Engineers MORTH 406 |
| 4 | Providingandlaying Primingcoat7Kg/10 Sq.moverWMMsurfaceusingof SSI Emulsion Bitumen for 10 Sq.m and cost EmulsionBitumenwhichwillbesuppliedand procuredbythecontractorhimselfathisown castasperspecialconditionappended including labour charges for preparing the surface for laying the tack coat and for applying therequiredquantityofbituminousby mechanicalsprayerincludinghireandfuelfor alltoolsandplantsemployedetc.,complete. MORTH Specifications 111,112,501,503 and 900. |
| 5 | ProvidingandlayingTackcoat2.50Kg/10 Sq.m over Wet Mix Mecadamsurface using of RS1 Emulsion Bitumen for 10 Sq.m and cost of EmulsionBitumenwhichwill besuppliedand procuredbythecontractorhimselfathisown costasperspecialconditionappended including labour charges for preparing the surface for laying the tack coat and for applying therequiredquantityofbituminousby mechanicalsprayerincludinghireandfuelfor all tools and plants employed etc., completeas perMORTH Specifications 111,112,501,503 and 900. |
| 6 | Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cumof26.50–13.20mmGradedmetaland0.25cumof13.20–2.36mmGrade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heatingthebitumenandaggregatestorequiredtemperatureandmixingthemin required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading themix to uniform thickness of 50 mm with mechanicalpaverstothespecifiedgradesandcrosssectionsandcompactionby Vibratory/Pneumaticrollerstotherequireddensityetc.,includinglabourforloading bitumen into bitumen tank and Metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M,Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5 |
| 7 | Providing and layingBituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm, 0.13cum of 9.50-2.36 mm and 0.26cum of 2.36mm and blow with 45.27kgs of VG 30 /bitumen and shredded plastic waste 5.03 kgforpremixingfor10sqmincluding cost and conveyance of all materials to CMP site, heating the bitumen and aggregate torequiredtemperatureandmixingtheminrequiredtemperatureincentralhotmix plant 20–30 tonnes capacity, conveying the mix by tipper trucks to paver site spreading the mix to uniform thickness of 30 mm with mechanical Paver to the specified grades andcrosssectionsandconsolidatedby vibratory/rollertotherequireddensity etc., including labor for attending to paver site etc., including hire charges and fuel charges for 20 – 30tCMP with bitumen boiler, tipper trucks, paver finisher,/ 9m paver finisher, vibratory/ rollersandallothertoolsandplantrequiredincludingfuleandallother incidental charges etc., complete as per specification using CMP as for clause 507of MORTH Rev-5. |