| 1 | Transportation of Rig Machine and its T&P from one site to other site of T.W. through departmental truck & Erection of rig machine leveling and dressing of site and Erection of camp equipage and installation of rig machine at pin point & Dismantling of rig machine |
| 2 | Transport of 250 PSI Air Compressor and its T&P from previous site to this site of T.W. & Installation of compressor including leveling & dressing of site and camp equipage & Dismantling of compressor after completion of work |
| 3 | Drilling of 200 mm dia bore from G.I. to 100m BGL |
| 4 | Reaming of 500 mm dia bore from 65Mbgl to 65mbgl |
| 5 | Reaming of 450 mm dia bore from 65Mbgl to 100mbgl |
| 6 | 200 mm dia MS ERW pipe from GL to 65 m BLG |
| 7 | 150 mm dia MS ERW plain/slotted pipe from 65 m BGL to 100 m BGL. |
| 8 | 200 mm dia size M.S. E.R.W. housing pipe 7.1 mm thick & Shifting of Tube Assembly from store to site. |
| 9 | 150 mm dia size M.S. E.R.W. Slotted pipe 7.1 mm thick & Shifting of Tube Assembly from store to site. |
| 10 | Supply of bentonite powder |
| 11 | Supply of sodium Hexamete phosphate |
| 12 | 2.00 mm to 4.75 mm size pen gravel of Lal Kuan Querry duly screend and washed |
| 13 | Development of tube well by compressor |
| 14 | Transportation, erection, dismantling of 1 cusee op unit & yield test |
| 15 | Development of tube well by heavy duty discharge submersible pumping plant. |
| 16 | Chemical and Bacteriological test. |
| 17 | Electrical logging of bore & yield test |
| 18 | Supply & installation of KSB make Clear water submersible pump set with electric motor capable to operate on 380/420 volts 3 phase, 50 c/s A.C. With submersible cable of suitable size of 250 LPM discharge at 45 Mtr. Head, 5.0 H.P. includingcontrol panel with starter, submersible cable, Complete in all respect. |
| 19 | SITC of main pulping & Valves with 24 mtr Column pipe, Electronic type Chlorinating plant power wiring, earthing, printing, tool s set, wiring of pump house (internal & external) chain pulley block and gauges complete in all respect material, T&P labour. : 80 mm Dia size |
| 20 | 3 mtr. Long heavy duty column pipe same as above 80 mm Dia size |
| 21 | Excavation of trench for laying cutting and supply laying & jointing of 90 mm dia HDPE water pipe line & inter commotion including all labour and jointing material etc complete and after laying of pipe line filling of earth complete. Complete in all respect including all material, T&P labour etc. |
| 22 | Construction of tube well room & water harvesting (Soak pit) 2.5 Mtr. Dia Mtr. 3.0 Mtr. Deep with 45 X 45 Cm Dia Brick Honey comb shaft with bricks |
| 23 | SITC of Stabilizer-10KVA |
| 24 | Construction of single tap pillar type stand post as per type design..Jal nigam sor 49.00 |
| 25 | supply and fixing plastic 4 layer impact water tank 10000 ltr ,storage capacity 10000 ltr ,for water storage . |