| 1 | okMZ la0 58 [ktwqjh \"kkL=h uxj dkyksuh esa izHkk Hkou ds lkeus dqvk¡ lQkbZ] tkyh yxkus] pcwrjk ejEer o fVu\"ksM fuekZ.k dk dk;ZA |
| 2 | dewatering work from well by diesel or electric pump including hire of pump, fuel, generator, operater etc with all complete. |
| 3 | Cleaning of silt/malba from well with the help of rope, bucket & lavour etc with all complete. |
| 4 | Providing&spreading of bury lime into the well with all complete. |
| 5 | Disposal of silt/malba from site upto 8 km with all complete. |
| 6 | Excavation foundation in ordinary soil including lift up to 1.5 m and lead up to 30m and including all compete work. |
| 7 | P/L Cement concrete in 1:6:12 with cement sand & brick ballast etc all complete (S.O.R. 2020 REF 305 SI NO. 4) |
| 8 | R.C.C workin 1:2:4with cement ,c/sand and 20 mm stonegrit with all complete, SORSI No. 284 |
| 9 | Mild steelwork or iron in plain for R.C.C work etc. allcomplete. SOR SI No.504 |
| 10 | M-150 class brick work in 1:4 cement & f-sand etc all cpmlete.(Rate Tendar-I.N.1.10) |
| 11 | Plaster work in 1:3 cement coase sand etc all compt. Work. |
| 12 | Finishing walls one coat of the water proofing cement paint of approved etc all complete. |
| 13 | Wall painting with plastic emulsion paint of secent qullty approved brand and quallty etc all complete. |
| 14 | P/F mild steel or iron work in heavy sizes such as built up gate S.N. 3 REF 503 2020 |
| 15 | ProvidingcorrugatedG.S.sheetroofing includingvertical/curvedsurfacefixedwith polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or withG.I.limpetwashersfilledwithwhitelead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete(uptoany pitchinhorizontal/vertical or curved surfaces), excluding the cost of purlins, raftersandtrussesandincludingcuttingtosize and shape wherever required.1.00 mm thick with zinc coating not less than 275 gm/m² .DSR 2023-12.1.2 (1257.55X0.735=923.89) |
| 16 | Concrete with 2cm gauge approved stone ballast, approved coarse ssand and cement int proportion of 1:2:4including supply of all materials labour and tools and plants etc. required for proper completion for the work. (UP.S.O.R-2020 Ref no 279b ) |
| 17 | P F of 65 mm thick (+/-2) chunar sand stone flooring over 20mm avarage the. Base of cement mortar 1:5 (1cement : 5Coarse sand) with joimts 3mm th. Side buttered with cement mortoar 1:2 (cement :2 stone Dust) admixed with pigment to match the shade of stone and pointing with same mortar Red sand stone2% area of item no.1 |
| 18 | P/L of Innograution Bord at site all com. |
| 19 | Add GST @ 18% |