|
| 1 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.(a) 15 cm diameter |
| 2 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliancesand all tackles.(i) 15 cm diameter |
| 3 | Supplying and fitting, fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site–a)Width of thinner end above 10 Cm. and less than 15 Cm |
| 4 | Coal tarring with 5% pitch including cost of material and labour complete as per direction of the Engineer-in-chargea) Two Coat |
| 5 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). |
| 6 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags, tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. |
| 7 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. |
| 8 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring. |
| 9 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete.A). With earth obtained from excavation opf foundation. |
| 10 | Plain / Reinforced Cement Concrete in Open foundation with or without reinforcements, in any part of foundation of bridges / culverts with graded stone chips of appropriate nominal sizes, including screening and cleaning of coarse aggregates, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, asnecessary, cost of curing with water, including cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge, cost for quality control, sampling, testing etc. including cost of formwork but excluding reinforcement complete as per drawing and technical specifications.D RCC Grade M25I) Using concrete Mixer |
| 11 | Plain / Reinforced Cement Concrete in Substructure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to roper grading zone, both of approved quality, cement and water reducing admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cost of necessary form work and staging complete as per drawing and technical specifications.E RCC Grade M25 (i) Height upto 5mI) Using concrete Mixer |
| 12 | Furnishing and Placing Reinforced / Pre-stressed Cement concrete in Super-structure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement and admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cost of necessary form work and staging complete. as per drawing and technical specifications.1 Construction Wing is to add cost of cement and cost& carriage of coarse aggregates as per requirement vide Table 3.2-1 only to arrive at consolidated rate.2 From durability consideration, the value of minimum cement content and maximum water cement ratio to be considered in the mix design shall be as per the direction of the Engineer-in-Charge.B RCC Grade M25 (i) Height upto 5mI) Using concrete Mixer |
| 13 | Supplying, fitting and placing un-coated HYSD bar reinforcement in Bridge Foundation including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction of Engineer-in-charge.The rate provided is exclusive of cost of steel materials. Construction wing should add cost & carriage of 1.05 MT (considering 5% wastage) of steel materials to arrive at the final consolidated rate |
| 14 | Supplying, fitting and placing HYSD bar reinforcement in Sub-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction of Engineer-in-charge.The rate provided is exclusive of cost of steel materials. Construction wing should add cost & carriage of 1.05 MT (considering 5% wastage) of steel materials to arrive at the final consolidated rate |
| 15 | Supplying, fitting and placing HYSD bar reinforcement in Bridge Super-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications.The rate provided is exclusive of cost of steel materials. Construction wing should add cost & carriage of 1.05 MT (considering 5% wastage) of steel materials to arrive at the final consolidated item rate |
| 16 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.a) Pakur Variety |
| 17 | Providing and laying Cement concrete Wearingcoat M-30 grade with graded stone chips 19mmdown including screening and cleaning approvedstone chips and sand as necessary laying, finishingcomplete to camber and grade, curing with water, including cost and carriage of all materials and hirecharges for form work including reinforcementcomplete as per drawing and TechnicalSpecifications vide clause no. 2702 of MoRT&H’sSpecification for Road & Bridge Works. |
| 18 | Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge.1. Labour rate per m³ is provided; Cost of sand is tobe added to arrive at the complete item rate.2. Compaction factor of dry clean sand is 0.835 |
| 19 | Earthwork in excavation in all kinds of soil for making embankments,repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of,A) Beyond 1.00 km and upto 2.00 km |
| 20 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.NB:- Volume of each earth/ sand filled bags should not be less than 0.028 m3Size of Nylon crate is 1metre X 1metre X 1metre.(a) Where boats are not necessary |
| 21 | Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete. |
| 22 | Removing earth/sand filled poly bags/gunny bags from the channel bed/slope and initially depositing the same near channel bank at a place as directed by the Engineer-in Charge for measurement of Bag.& then disposing off the same at a distance not less than 150 metre from the channel site. |
| 23 | Taking out bullah wailing pieces after removing nuts, bolts and iron nails and stacking the same within 150 metre from the site of work including sorting out and stacking serviceable meterials. |
| 24 | Taking out Jhaw / Eucalyptus piles from river bed or from elsewhere including carrying, stacking materials in the nearest stack yard.(a) Up to 17.5 cm. diamete |
| 25 | Labour charge for dumping / laying of Laterite / Stone Boulders 25 kg & above / Shingles / Brick Bats, from stack of worksite with all leads and lifts in water or spreading the same on the slope of the bank of River/Sea or the slope of the embankment or in the River/ Sea bed to an uniform thickness as per direction of the Engineer-in-charge including cost of all accessories and other incidental charges.(a) Boulder 25kg & above where boats are not necessary |
| 26 | Labour charges for stacking unloaded boulder / shingles to make them convenient for measurement as per direction of the Engineer-in-charge. a) Boulder of size above 20 kg |
| 27 | Supply of stoneboulders atsite including cost of material, loading, unloading and carriage and including all incidental charges like Royalty,complete. (Royalty certificate in original from concerned authority are to be submitted along with the bill otherwise mount due towards Royalty of stone/lateriteoulder will be deducted from the bills of Works) a) Panchami source (Each weighing 25 kg & above) |
| 28 | Bailing or pumping out water from foundation trenches.(This item should be executed on the specific direction of the Engineer-in-charges when he is satisfied in his absolute discretion, that this has not been necessitated due to any fault on the part of the contractor) |
| 29 | (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary:(b)On Plaster surface : With super gloss (hi-gloss)(iv) Two coats (with any shade except white) |
| 30 | Metal beam crash barrier B Type - B, \"THRIE\" : Metal Beam Crash Barrier Providing and erecting a \"Thrie\" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 85 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 2 m high with 1.15 m below ground level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a space of channel section 150 x 75 x 5 mm, 546 mm long complete as per Clause 811.3 of Specifications for Road & Bridge Works of MoRT& (5th Revision) |
| 31 | SupplyingProviding and laying reinforced cement concrete pipe NP3 with spigot socket for culverts on first class bedding of granular material in double row including fixing with cement mortar 1:2 as per Technical Specification Clause 1106 for Rural Roads of MORD. including cost of Pipe and carriage etc all complete,(C) 900 mm dia. |
| 32 | Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 rnm. true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 rnrn. leaving adequate space between vertical post for expansion, complete as per MoRT&H standard drawing no SD/202 and technical specifications. |