| 1 | Clearing and grubbing land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness etc complete as per specification and direction of Engineer-in-Charge. |
| 2 | Earth work excavation for foundation in hard soil or gravelly soil within 50mIntial lead and 1.5m Initial lift including rough dressing and breaking clods to maximum 5cm to 7cmand laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-Charge. |
| 3 | K.B brick masonary work in Cement mortar (1:4) using K.B bricks of 25cm x 12cm x 8cm having crushing strength not less than 75kg per sqcm with dimensional tolerance ±8 % including watering, curing and cost, conveyance, royalty of all materials and cost of labour etc complete. |
| 4 | 12mm thick cement plaster 1:3 over K.B. Brick with cement punning for skirting.including cost of labour, material, T&P etc. all complete. |
| 5 | Providing and Laying Reinforce Cement Concrete M-25 grade with 20 mm& down grade black hard granite (Crusherbroken) stone chipss including cost all materials, labours, T & P, curing etc complete (excluding the cost of reinforcement) anddirection of Engineer-in-Charge. |
| 6 | 1st Floor |
| 7 | Rigid & smooth centering and shuttering false, levelled works and dismantling , then after casting including cost of materials complete for plinth band and column footing. |
| 8 | Pile cape, Grade beam & Column |
| 9 | 1st Floor |
| 10 | Slab & Chajja |
| 11 | Staircase |
| 12 | Lintel |
| 13 | Cutting, bending , binding and placing in position of uncoated HYSD bar reniforcement as per drawing for R.C.C work including the cost of binding wire, steel, labour tools and taxes etc. |
| 14 | 1st Floor |
| 15 | F.A. brick masonary work in cement mortar (1:6) using F.A. bricks of 25cm x 12cm x 8cm having crushing strength not less than 75kg per sqcm with dimensional tolerance±2 % including watering, curing and cost, conveyance, royalty of all materials and cost of labour etc complete. |
| 16 | 1st Floor |
| 17 | 16mm Cement Plaster in cement mortar 1:6 including necessary scaffolding curing etc. all complete at all depth height. |
| 18 | 1st Floor |
| 19 | 12mm Cement Plaster in cement mortar 1:6 including necessary scaffolding curing etc. all complete at all depth height for out side portion wall. |
| 20 | 1st Floor |
| 21 | 6 mm thick cement Plaster in cement mortar 1:4to RCC surface finished smooth including closed deep chiping and slury treatment with necessary scaffolding, curing etc all complete |
| 22 | Fillingin foundation and plinth with excavated earth including watering and ramming as direction of E.I.C. |
| 23 | Filling sand in foundation and plinth watering, ramming, consolidating and dressing labours tools,taxes etc all complete as per specification and direction of E.I.C. |
| 24 | Painting two coats of Anti-fugal weather coat water proofing paint including scaffolding and cleaning the surface before application.including cost ofall materials ,labour T& P etc complete. |
| 25 | 1st Floor |
| 26 | Providing and applying priming One coat with any approved primer on new building work to give an even shade including scaffolding and cleaning the surface before application etc. complete. |
| 27 | 1st Floor |
| 28 | Finishing surface of walls with cement based wall putty of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all material, taxes, labour, T&P etc complete. |
| 29 | Wall painting two coats of plastic emulsion paint of approved shade including scaffolding and cleaning the surface before application. |
| 30 | Providing and LayingPlainCement Concrete 1:3:6 ( 1 Cement : 3 Sand : 6 Stone Aggregate 40mmsize ) as levellingcourse infoundation and plinthetc. complete all depth and height. |
| 31 | Supplying, fitting & fixing of Vetrifed Tile in floors of size 600mm x 600mm (colour / printed series)of approved make conforming to IS : 13755 laid on 20 mm thickcement mortar and filling joints with white cement of approved quality including cost of all materials, labour T&P etc required for the works all complete as per direction of Engineer -in- charge. (For new work only) |
| 32 | Supplying, fitting and fixing of Chequre tile in floor skirting dadoon 25mm thick bed of cement mortar 1:1 jointed with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing etc complete including cost of tile, material, labour T & P etc complete. |
| 33 | Providing , Fitting &FixingAnti-SkidCeramicFloor Tilesinflooring using special plain / printedseriesAnti-SkidCeramicFloor Tileofpremium grade ( having minimum thickness 7 mm to 8 mm & size 300 m.m x 300 m.m OR 400 m.m x400 m.m) confirming to I.S 13755 of approved quality and shadein floors, treads on steps and landings in all floors at all height on 25 m.m thick bed of cement mortar of mix (1:1) laid in proper slope and gradient with screened & washed sharp riversand for mortar andgrouted with neat white cement slurry, joining the Anti-SkidCeramicFloorTileswith neat white cement slurry,mixed with required (Tiles are to be immersed in the water for required timebefore use) quantities of pigments of approved marks to match the shades of the Anti-SkidCeramicFloorTilesif requiredincluding cost, conveyance, loading, unloading, stacking, royalties and taxes of all Materials, cost of all Labour, Sundries, T&P required for the work, Watering , Curing for requireddays , cleaningthe flooring space manually etc.complete in all respect as directed by the Engineer-in-charge. |
| 34 | Supplying, fitting, fixing up window (sliding type) made up aluminium section 151-154, 151-155, as window rame section No. 151-155, 151-153 and 151-167 as shutter frame with 5mm thick Toughned glass as panel fitted with rubber bending including lucking arangement including all fittings, cost of mataerials, alltaxes, labour, T&P etc. complete as per direction ofEngineer-in-charge. |
| 35 | Providing, fixing, fitting of Al. door with OEL anodized Al. door section of 9202 as vertical member, 9201 as top member and 9200 as bottom and middle member and12mm thick pre-laminated board fixed on door frame by means of tapered clip No. 4660 and the frame to be completed by means of jointing angle No. 1855 including all cost of labour,T&P,hire charges of drilling machine,labour charges etc.complete. |
| 36 | Supplying, fitting and fixing of Stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with balustrade of size 32mm X 32mm X 2mm @ 0.90mtr. C/C stainless square pipe bracing of size 32mm X 32mm X 2mm in 3 rows in staircase as per approved design and specification, buffing, polishing etc with cost, conveyance, taxes of all materials, labour, T&P etc. required for the complete in all respect. |
| 37 | Providing, fixing, fitting of Al. door with OEL anodized Al. door section of 9202 as vertical member, 9201 as top member and 9200 as bottom and middle member and6mm black glass in top portion with 12mm thick pre-laminated board at bottom portion fixed on door frame by means of tapered clip No. 4660 and the frame to be completed by means of jointing angle No. 1855 including all cost of labour,T&P,hire charges of drilling machine,labour charges etc.complete. |
| 38 | Providing & fixing 6mm thick black glass pan inG.I. grated Ventilator and Staircaseopening inluding cost of materials, labour, T&P etc. complete as per direction of EIC. |
| 39 | Painting one coat of primer of approved shade on iron work two coats to give an even shade andfinished smooth and even surface to receive painting including cost of scaffolding staging charge, conveyance, taxes of all materials and cost of all labour with T & P etc complete as per specification and direction of Engineer-in-Charge. |
| 40 | Painting two coats with a coat of approved synthetic enamel paint over a coat of primer to iron work including sand papering, polishing the surface, cost, conveyances of materials and cost of all labour TandP etc complete as per specification and direction of Engineer in charge |
| 41 | 2.5 cm thick grading concrete (1:2:2) on roof slab with 6 mm size hard granite chips on new work including cost of labour, material, T&P etc. all complete. |
| 42 | Drip course mould plaster 1:4 including necessary scaffolding curing etc complete at all depth and height as per direction of site in charge. |
| 43 | Closed deep chipping and cleaning to R.C.C. surface for receiveing cement plaster. |
| 44 | Supplying, fitting and fixing of G.I.grated doors, windows, ventilaters etc. including cost of labour materials transportation etc. |
| 45 | Supplying, fitting & fixing of 4\" dia U.P.V.C rain water pipe with necessary fittings and all complete. |
| 46 | The item rates indicated aove work inclusive of cost of all labour, materials,conveyence,taxes and royality(with EMF,DMF and additional charges) of materials,labour cess,here and running charges of all machineries and equipments and other incidental charges so as to complete the item in all respect as per specification and direction of Engineer-In-Charge.Accordingly the bidder has to quote the rates.The rate are exclusive of GST as applicable. |