| 1 | Part. A (Dismentaling and Boring work) |
| 2 | Transportion of T&P and boring equipage & retun trip after completion of work |
| 3 | Hiring Charges of T&P and boring equipage |
| 4 | Water Arrangement for construction of borewell |
| 5 | Provision of Temporary fencing, baricading around tube well site for the protection of children, animals and human during complition of tube well and dismentalling after complition of work. |
| 6 | Construction of bore hole 300mm dia by Casing method upto following depth |
| 7 | 0-30 mtr BGL |
| 8 | 30-60 mtr BGL |
| 9 | 60-90 mtr BGL |
| 10 | Lowering of PVC Assembly into the Bore |
| 11 | Extraction of M.S Casing Pipe after Lowerring of P.V.C Assembly |
| 12 | Supply and filling of Pea Gravel 1.6mm to 4.8mm as per IS 4097 |
| 13 | Borewell dovelopment and over pumping upto clear tha water all materiaI,Iabour P.0.L etc complete in all respect |
| 14 | PART. B (Supply of Material) |
| 15 | Supply of ISI Marked PVC pipe 225 mm x 8 Kg/cm² including Loading, Unloading and Transport charges |
| 16 | Supply of ISI Marked PVC Coupler (Socket) 225 mm heavy duty |
| 17 | Supply of PVC Strainer 225 mm with Nylon Jali, Doree etc. Complete. |
| 18 | Supply of PVC End cap 225mm with 1 mtr length 225mm dia blind pipe |
| 19 | Supply of 100mm dia Medium class G.I Pipe ISI Marked in 3Mtr. Length with heavy Flenge welded both ends Clumn pipe. |
| 20 | Supply of Solvent Cement |
| 21 | Supply of ISI Marked 100mm Sluice Valve including Nut, Bolt, Washer and packing etc. |
| 22 | Supply of ISI Marked 100mm Reflex/ NR Valve including Nut, Bolt, Washer and packing etc. |
| 23 | Supply of 100mm MS Clamp with Nut and Bolt |
| 24 | Supply of 225 mm M.S. tubewell cap |
| 25 | Supply and Fixing of MS Panel Box with Matiral & Labour etc Complete. |
| 26 | Suppy of 100 MS Bend Flenge type heavy duty |
| 27 | Supply of ISI marked cromptom Greaves/ CRI/KSB 15 HP Submersible Motor Pump Set 03 Phase, (35±5)Mtr. Head and(1200±5%)LPM Discharge suitable for 200mm Borewell size outlet 100mm including. |
| 28 | 3 core 6 mm2coper cableISI |
| 29 | Supply of Submersable Starter panel in sheet enclosure Type MUG 20H fully Automatice Starterstar Delta 415 Volt 50 Hz03 phase. |
| 30 | 25 mm Sq.four core Armoured cable ISI |
| 31 | PART. C (Labour and Job Work) |
| 32 | Installation Charges of Pumping Plant |
| 33 | Supply and Fixing of MS Panel Box with Matiral & Labour etc Complete. |
| 34 | Interconnection of pipe line upto 20 mter MS pipe 100 mm dia from Tubewell column pipe to distribution main including all required material as M.S./G.I. pipe fittings, T&P etc. for complition of work |
| 35 | Installation of Main Switch, Starter and other electrical Connection, wiring etc. |
| 36 | Chemical and Bactrialogical Test of water |
| 37 | Trail and Run of Plant for one month by contractor/ charges of pump operator. |
| 38 | Construction of Borewell Chamber including supply of all labour, material and T&P etc with arrangement of MS Girder. |
| 39 | Fixing of MS Cover /RCC Cover for chamber with 45x45x6.0mm angle and 14 gauge MS sheet |
| 40 | Site clearance and unforseen work |
| 41 | GST |