| 1 | Detail of Work |
| 2 | Safe cartage of PCC/ ST poles(up to13 Mtr.) from ESC, SRE/JE store to site of work at various sites including loading & unloading at both ends (Dist. Up to 40Km.). |
| 3 | Safely cartage of other complete line material11 KV XLPE cable / LT ABC cable(Except PCC /ST Poles) from ESC, SRE/ JE store to site of work at various sitesincluding loading, unloading at both ends (Dist. Up to 40Km.).. |
| 4 | Safe cartage of 25/63/ 100 KVA T/F from ESC,SRE, to the site of work including loading & unloading at both ends.(Dist. Up to 40Km.). |
| 5 | Safe cartage of11 KV Line CT/PT Unit from ESC,SRE, to the site of work including loading & unloading at both ends (Dist. Up to 40Km.).. |
| 6 | Safe cartage of11 KV Line Metering cubicalfrom ESC,SRE, to the site of work including loading & unloading at both ends (Dist. Up to 40Km.).. |
| 7 | Safely carriage of250 KVA T/Ffrom ESC, SRE to site of work including loading & unloading at both ends.. |
| 8 | Constriction of plinth for installation of 250 KVA T/F of size 1.5x1.5x1.5 mtr made of 9”inch thick wall in all four sides with 6”inch thick RCC Top duly filled with sand and plastered 12mm thick in ratio 1:4 with cement and sand on outer surface of brick wall. |
| 9 | Safely installation ofNew 250 KVA T/F on the plinth by private crain with proper alignment and Complete fitting including making HT connection and commissioning |
| 10 | Providing & Making of Wiremesh fencing size 2.5x2.5x2.5 mtr with grouting making frame of MS angle 35x35x4 mm and fixing four no MS strip size 25x4 mm at equal distance in between the frame and fixing square mesh of 50 mm squre in each frame the fencing should cover all side of T/F with providing 1 no door size 6\"x3\" with sitakni & dandala with green paints (British/Asian/enamel paints) |
| 11 | Earthing of 250 KVA T/F (1 No body & 1 No. neutral earthing) by boring & fixing ofG.I pipe 1½ Dia (Jindal Class B) and connecting with G.I. Strip of size 40x5 mm and G.I wire at bottom of G.I pipe to the T/F providing of required charcoal & salt in the pipe. |
| 12 | Erection of single support on PCC/ ST poles(up to 13 Mtr.)Long with complete fitting of all accessories of11 KV/LT line. complete. |
| 13 | Erection of double Pole on PCC/ ST poles (up to 13 Mtr.) Longwith complete fitting with all accessories . |
| 14 | Fixingof 11 KV stay rods by digging of pits in block of 600X600X300 mm. &with new brick and nozzling of stay wire 7/10 SWG and fitting the same on the pole |
| 15 | Concreting of stay rod inratio 1:4:8 with Ist class with brick ballst with cement, sand |
| 16 | Providing and fixingof stone ped 300x300x75 |
| 17 | Earthing of poles by earthing rod. |
| 18 | Providing All TypeMS Clamp for ST/PCC Poles with nuts bolts made of new MS flat 50x5 mm best quality. |
| 19 | Providing of LT shekel insulator of size 100x115mm |
| 20 | Providing ofnuts & bolts of size. |
| 21 | Providing of Dead end clamp with I-Hook |
| 22 | Providing of Suspention clamp with I-Hook |
| 23 | Providing ofPiercing connector Diff.size |
| 24 | Providing of PG Clamp Diff. size |
| 25 | Providing of of 1x16 sq mm Cable for connection of Distribution box. |
| 26 | Providing of 11 KV cable terminations Kit out door & indoor of size 3x35/3x70/3x120/3x185/3x300 sq mm. |
| 27 | Providing of G.I Pipe 100mm 4\" dia Class B |
| 28 | Removel of old weasel/ Rabbit condutor from the Existing 11 KV/LT lines with making roll of condutor and shifting the same to ESC, SRE/JE store including loading and unloading at both ends. |
| 29 | Laying, lifting, Stringing, sagging jumpring & binding ofACSR Weasel Conductor for 11KV/LT Lineincluding complete. |
| 30 | Laying, lifting, Stringing, sagging jumpring & binding ofACSR Rabbit Conductor for 11KV/LT Line including complete. |
| 31 | Laying, lifting, Stringing, sagging jumpring & binding ofACSR Dog Conductor for11KV/LT Line including complete. |
| 32 | Removel of25/63 KVA T/F from the existing D/P after opening HT & LT connection and with shifting the T/F from the site to ESC, SRE/JE store including loading and unloading at both ends. |
| 33 | Safe installation of25/63/100 KVA T/F on the double pole with complete fittings including making connections and commissioning. |
| 34 | Safe installation of 11 KV Line CT/PT Unit on the double pole with complete fittings including making connections and commissioning. |
| 35 | Safe installation of11 KV Line Metering cubical in the room with complete fittings including making connections and commissioning. |
| 36 | Chemical Earthing of Metering cubical/CT/PT Unit and connecting with G.I Stirp of size 35x4 mm to the Metering cubical/CT/PT Unit Complete Properly. |
| 37 | Laying, lifting, Stringing, proper sagging ABC cable of size 3x50+1x35+1x16/ 3x95+1x70+1x16/ 3x120+1x95+1x16 sq.mm. including fixing ofall accessories. |
| 38 | Laying, lifting, stringing proper sagging of33 KV/11 KV XLPE cable 3X35/3x70/ 3X120/3x185 sq mm of includingcomplete etc. |
| 39 | making of 11 KV cable terminations Kit out door & indoor of size 3x35/3x70/3z120/3x185/3x300 sq mm. |
| 40 | Laying and making connections of LT PVC/AL.XLPE cable 4x16/4x25/4x35/3.5x70/3.5x150/ sq.mm. from T/F to double pole (approx to 20 Mtr). |
| 41 | Fabrication Charges of Angel & Channal. |
| 42 | Fixing ofDistribution box with clamp 01 & 03 Phase |
| 43 | Fixingof G.I. Pipe 100 mm 4\" dia 3.5 mtr. Long at the both side of double pole. |
| 44 | Concreting ofSTPole SP-55, 11/13 Mtr. with cement concreting in block of 600x600x1500 mm in ration 1:4:8 with cement sand and Brick ballast size 1x1.5 sq mm. |
| 45 | Dismantling of exiting PCC/ST Pole after opening of comlete accessories |
| 46 | Cutting of Chopping of tree branches touching the 11 KV/LT line. |