| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:4:8 or leaner mix (i/c equivalentdesign mix) DSR 15.2.2 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)DSR 4.2.5 |
| 3 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqmincluding grouting the joints with white cement and matching pigments etc., complete Size of Tile 500x500 mm DSR 11.41.1 |
| 4 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. DSR 13.91 |
| 5 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level inall shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand)DSR 6.4.1 |
| 6 | CEMENT PLASTER (IN FINE SAND)12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand)DSR 13.1.1 |
| 7 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. DSR 13.80 |
| 8 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications : Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr/10 sqm DSR 13.48.1 |
| 9 | Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gram/litre, of approved manufacturer and of required shade and colour all complete to achieve even shade and colour :13.41.1 New work (two or more coats) over and including water thinnable priming coat with cement primer having VOC content less than 50 gram/litre sqm 185.65(DSR 13.41) |
| 10 | Finishing walls with textured exterior paint of required shade : New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and including priming coat of exterior primer applied @ 2.20kg/10 sqm DSR 13.45.1 |
| 11 | Providing and fixing factory made uPVC glazed/wire mesh windows/doors comprising of lead free uPVC multi-chambered frame, sash and mullion/coupler (where ever required) extruded profiles having minimum wall thickness of 1.70 mm for Series R1 and R2 profiles and 2.10 mm for Series R3 and R4 profiles conforming to EN: 12608 in any shape, color and design duly reinforced with galvanized mild steel section made of required shape & size as per CPWD Specification, uPVC extruded glazing beads, interlocks and Inline sash adaptor (where ever required) of appropriate dimension, EPDM gasket, hardware, SS 304 grade fasteners of minimum 8 mm dia with countersunk head, comprising of matching polyamide PA6 grade sleeve for fixing frame to finished wall as per IS 1367: Part 1 to 14, plastic packers, plastic caps and necessary stainless steel screws etc. Profile of frame, sash & mullion ( if required) shall be mired cut and fusion welded/mechanically jointed duly sealed at all corners, including drilling of holes for fixing hardware and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of approved size and quality, all complete as per approved drawing conforming to CPWD specification & direction of Engineer-in-Charge. Section of steel reinforcement and cross sections of uPVC profiles to be as per design approved by Engineer-in-Charge. |
| 12 | Providing and fixing false ceiling at all height including providing and fixing of frame work made of special sections, power pressed fromM.S. sheets and galvanized with zinc coating of 120 gms/sqm (both side inclusive) as per IS : 277 and consisting of angle cleats of size25 mm wide x 1.6 mm thick with flanges of 27 mm and 37mm, at 1200 mm centre to centre, one flange fixed to the ceiling with dashfastener 12.5 mm dia x 50mm long with 6mm dia bolts, other flange of cleat fixed to the angle hangers of 25x10x0.50 mm of requiredlength with nuts & bolts of required size and other end of angle hanger fixed with intermediate G.I. channels 45x15x0.9 mm running at the spacing of 1200 mm centre to centre, to which the ceiling section 0.5 mm thick bottom wedge of 80 mm with tapered flanges of 26 mm each having lips of 10.5 mm, at 450 mm centre to centre,shall be fixed in a direction perpendicular to G.I. intermediate channel with connecting clips made out of 2.64 mm dia x 230 mm long G.I.wire at every junction, including fixing perimeter channels 0.5 mm thick 27 mm high having flanges of 20 mm and 30 mm long, |
| 13 | Supply of LED ceiling Lights |
| 14 | Installation charge of LED Ceiling light Market Rate |
| 15 | Supply & Installation of split direct expansion 2.0 Ton air-conditioners suitable for operation on A/C supply single phase 50 HZ 230 volts with hermetically sealed compressor with air cooled condenser with DC iinverter technology motor capacitor and start run capacitor, relay and over load protector internal unit, with one indoor and one outdoor unit. The condenser unit wiill be placed outside the room on the terrace to avoid noise including standard length of suitable size copper tubing covered with insulation tube. (High Wall Chored / Cordless) suitable capacity 3 core sheathed / PVC copper cable and a battery operated wireless remote unit.BEE star rated : 5 star, EER 3.4TS:-69 CE(E/M)-17EM/19-20 Dated:-17.02.2020[BOQ Ref.-F/01] |
| 16 | Supply of 5 KVA StablizerTS:-69 CE(E/M)-17EM/19-20 Dated:-17.02.2020[BOQ Ref.-F/02] |
| 17 | Labour Charges for Installion ofsplit units of 2TR Nominal Capacity.TS:-69 CE(E/M)-17EM/19-20 Dated:-17.02.2020[BOQ Ref.-F/03] |
| 18 | Charges for installion of copper piping for above units alongs with insulation.TS:-69 CE(E/M)-17EM/19-20 Dated:-17.02.2020[BOQ Ref.-F/04] |
| 19 | S/I of drain water piping 20mm dia insulated.TS:-69 CE(E/M)-17EM/19-20 Dated:-17.02.2020[BOQ Ref.-F/05] |
| 20 | S/F of bracket for out door unit of ac complete in all respects.TS:-69 CE(E/M)-17EM/19-20 Dated:-17.02.2020[BOQ Ref.-F/06] |