| 1 | Earth work in excavation for foundation of structurecompletewith all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305in ordinary soil Depth upto 3 metre |
| 2 | Providing and laying mechanically mixed and vibrated Cement Concrete in foundation upto a depth of 1.5 metres below ground level and 1.50 metres above Ground/Bed level as per MoRTH Specification : Clause 1000 & 1700 P.C.C. 1:3:6 mix with stone aggragate 40 mm hand broken |
| 3 | Stone masonry work in cement mortarwith mechanical mixer for foundation (any level) complete including all scaffolding etc. but excluding pointing and plastering as per drawing and technical specification as per MoRTH Specification : Section 1000,1400in CM 1:3(a)Coarsed rubble masonry |
| 4 | Providing and laying cement concrete coping 1:2:4 mix, complete as per specifications 75 mm thick |
| 5 | Raised and cut pointing on stone work in CM 1:2 (1 cement : 2 sand) |
| 6 | Providing, laying, spreadingand compactingstone aggregate of specific size as per table400-6 &400-7 to Water Bound Macadam specification including spreading in uniform thickness, hand packing, rolling with power roller 8-10 tonnes, in stages to proper grade and camber, applying and brooming requisite type of Stone screeningto fill-up the interstices of coarse aggregates, watering (with water browser) and rolling, making necessary earthenbund toprotect edegs,lighting, guarding,barricading and maintenance of diversion etc. [MoRTH specification:Clause 404] (bymanualmeans) with all leads (compacted thickness as specified to be measured) Grading no.3 (53-22.4 mm) crusher broken |
| 7 | Construction of un-reinforced, without dowel bar, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 M30 (Grade), Coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholves, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14 days, using curing compound and water finishing to lines and grade as per drawing and MoRD specification clause 1501 including vaccum dewatering process with all required equipments.Cement concrete M-30 grade |
| 8 | Supplyofcautionary / warningsignboard90cm equilateral triangle made out of 2.0 mm thickaluminumsheetfacetobe fully covered by white/blue high intensity grade retro reflective sheeting with Red / white symbol,cut out or screen printed background with epoxy paint complete confirming to MoRTH specificationsclause. 801 with angle iron post 65 x 65 x 6 mm. 3 mtr. long |
| 9 | Installation of sign boards having the posts like mandantory, cautionary and informatory boards including excavation, fixing of posts in 300 mm dia. RCC hume pipe (IS marked) 1.20 m long, 75 cm embedded in ground, the in side of pipe shall be filled with cement concrete 1 : 4 : 8 with semi-circular hump at top, the pipe shall be painted white with enamel paint including transportation etc. complete.For double post |
| 10 | Supply of flood gauge (water Gauge) as per I.R.C. 67 standard 200 cm long fixed on angle iron posts 50x50x6 mm, 2.6 M. long. |
| 11 | Fixing of flood guage (water gauge) in cement concrete M -15 mix size 300 x 300 x 600 mm includingtransportation,excavationetc. complete. |