| 1 | Supply Of Material by the Contractor |
| 2 | Stone Pad 300x300x75 mm |
| 3 | M.S. Top Channel 100x50x2240 Sqmm |
| 4 | M.S. Dropper Channel 100x50x2240 Sqmm |
| 5 | M.S. TF Base angle 75x75x6x2028 mm |
| 6 | M.S. T-off Channel with clamp |
| 7 | Danger board with clamp |
| 8 | Barbed Wire |
| 9 | Nut, Bolt & washer |
| 10 | Number Plate |
| 11 | F-Bracket CLAMP FOR STP |
| 12 | Red oxide Paint |
| 13 | Aluminium Paint |
| 14 | MS Iron Cross Bracing of size 65x65x6 2700 mm Long with 4 Clamp For Section Pole |
| 15 | LT PVC 3.5x150 Sqmm |
| 16 | I TYPE Hook |
| 17 | Suspension Clamp |
| 18 | Dead EndClamp |
| 19 | STP Pole/PCC Pole clamp with nut & bolt |
| 20 | 3 Phase LT Distribution Box |
| 21 | Clamp for Distribution box 3 Phase |
| 22 | LT Insulator & piearcing connector (120-50 Sqmm) |
| 23 | SINGLE CORE PVC CABLE 16 Sqmm (FOR CONNECTION) |
| 24 | MS Guarding Angle with clamp |
| 25 | CLAMP with nut & Bolt for Guarding Angle |
| 26 | STAY WIRE |
| 27 | I RAG BOLTS |
| 28 | GI Wire10 SWG |
| 29 | GI Wire6 SWG |
| 30 | Safe Carriage of following/ any other material from Electricity Store Center Soron/Etah/Aligarh to pit site of work from the Kaccha & Pakka Road including loading & unloading at the respective ends including the cost of arrangement of labour, T&P etc. which required for Topper completion of work. |
| 31 | ACSR DOG Conductor |
| 32 | LT ABC (3x120+1x95+1x16 Sqmm.) |
| 33 | ST Pole 11 Metre |
| 34 | ST Pole 9 Metre |
| 35 | Earthingcomplete |
| 36 | Stay Set Complete |
| 37 | 11 KV Disc Insulator |
| 38 | 11 KV Disc Fiffting |
| 39 | 11 KV Pin Insulator |
| 40 | 11 KV Pin with nut |
| 41 | 11 KV V Type Cross Arm with Clamp |
| 42 | Erection of Material |
| 43 | Erection of single support including complete H.T/L.T fittings S.T. Pole 11 Mtr. SP-55 including Earthing, Grouting & Muffing of pole. |
| 44 | Erection ofDouble support including complete H.T/L.T fittings S.T. Pole 11 Mtr. SP-55 including Earthing, Grouting & Muffing of pole. |
| 45 | Erection of single support including complete H.T/L.T fittings S.T. Pole 9 Mtr. SP-55 including Earthing, Grouting & Muffing of pole. |
| 46 | Erection of Section Pole support including complete H.T/L.T fittings ST Pole 11 Mtr. including Earthing, Grouting & Muffing of pole. |
| 47 | Fixing Of Danger board with clamp |
| 48 | Erection of stay set complete including the work of nuzzling etc. |
| 49 | Laying sagging stringing, binding and jumpering ACSR Dog onductor |
| 50 | Fixing ofBarbed Wire |
| 51 | Painting of ST Pole with red oxide & ailunimum paintas per RESPO norms |
| 52 | Laying & fixing of G.I. Wire 06 SWG |
| 53 | Laying & fixing of G.I. Wire 10 SWG |
| 54 | Fixing of Dropper Channel |
| 55 | Fixing of 3 Phase Distribution Box in all respect. |
| 56 | Laying of LT PVC 3.5x150 Sqmm |
| 57 | Laying ofSINGLE CORE PVC CABLE 16 Sqmm (FOR CONNECTION) XLPE CABLE 1X240 Sqmm |
| 58 | Laying of LT ABC (3x120+1x95+1x16 Sqmm.) |
| 59 | Installation of M.S. TF Base angle 75x75x6x 2028 mm as per respo norms. |
| 60 | Shifting of 100 KVA T/F with all safety Precautions as per std. |
| 61 | Fixinig of M.S. Top Channel 100x50x2240 Sqmm |
| 62 | Fixing of Number Plate |
| 63 | Fixing of MS Iron Cross Bracing of size 65x65x6 2700 mm Long with 4 Clamp For Section Pole |
| 64 | Charges for Dismantling Work:- Work includes dismantling from recieved back material on site carriage and cartage of same materails from site/location tostore centre place as per instruction of JE/SDO/EE concerned. |
| 65 | X ARM AND T CHANNEL CLMAP SCRAP |
| 66 | ACSR DOG Conductor SCRAP |
| 67 | ST POLE SCRAP |
| 68 | LT ABC Scrap |