|
| 1 | Clearing the Scrub Jungle including all labour charges for burrying and burning etc., |
| 2 | Earth work excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, black cotton, Red earth, stony earth hard gravelly soiletc, complete. as per SS20 A |
| 3 | Advance Patch work for making up the undulation in the existing B.T surface to an average thickness of 50mm using 13.20mm IRC size HBG metal with 44kg of Bitumen - for 1 cum of metal mixed in hot mix plant laying |
| 4 | Ch 0/00-1/00 |
| 5 | Ch 1/00-2/100 |
| 6 | Ch 2/00-2/360 |
| 7 | Advance Patch work for making up the undulation in the existing B.T surface to an average thickness of 25mm using 13.20mm IRC size HBG metal with 44kg of Bitumen - for 1 cum of metal mixed in hot mix plant laying |
| 8 | Ch 0/00-1/00 |
| 9 | Ch 1/00-2/100 |
| 10 | Ch 2/00-2/360 |
| 11 | Providing and laying TACK COATover the Bt surface using 2.0 to 2.25 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. |
| 12 | BITUMINOUS CONCRETE 25 MMTHICK USING cmp (Grade-II)Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 13.20-11.20mm. 0.17cum of 6.7-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 |
| 13 | For Speed Breakers |
| 14 | Filling with US Gravel for side berms including cost and conveyance of all materials so site and stacking them to departmental guage for premeasurements and labour charges for filling etc., complete |
| 15 | Ch 0/00-1/00 |
| 16 | Ch 1/00-2/100 |
| 17 | Ch 2/00-2/360 |
| 18 | Confirming of IRC 67-2010 and ASTM D 4956-09, Type IV specification and fixed over 1.5mm thick aluminium sheet fixed on back supporting frame of 25mm x 25mm x 3mm Ms angle and supported on a MS angle iron post 75mm x75mm x6mm firmly fixed to the ground by means of properly desined foundation with M15 grade cement concrete 45cmx45cmx60cm, 60cm below Ground level etc complete including 7 year warranty for the Retro reflection sheeting as per clause 6.9 of IRC 67.2010 Specification (as per MoRT& Spec.N.801) |
| 19 | 60 Cm equilator triangular Cautinary sign borad |
| 20 | Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @250gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level uniform and free form streaks and holes etc complete as per MORT&H specification no.803 |
| 21 | Road Marker/ Road stud with lens Reflector |
| 22 | Supplying and fixing of HM stone of size0.75x 0.23x 0.10m |
| 23 | Supplying and fixing of KM stone of size 1.65 x 0.45 x 0.15m |
| 24 | Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km |
| 25 | For 1st year |
| 26 | For 2nd year |
| 27 | For 3rd Year |
| 28 | For 4th Year |
| 29 | For 5th Year |
| 30 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |